MINERAL PRODUCTION SHARING AGREEMENT


No. 210‐ 2005-V‖


This MINERAL PRODUCTION SHARING AGREEMENT is made and entered into in Quezon City, Philippines, this _______ day if APR 28 2005 by and 

between:





THE REPUBLIC OF THE PHILIPPINES, herein referred to as the GOVERNMENT, represented in this act by the Secretary of the Department of Environment and Natural Resources, with offices at the Department of Environment and Natural Resources Building, Visayas Avenue, Diliman, Quezon City


and

ATLAS CONSOLIDATED MINING AND DEVELOPMENT CORPORATION, HEIRS OF JOSE P. YELEZ, HE]RS OF MANUEL CUENCO, ANTONIO V. CUENCO AND JON RAMON ABOITIZ, hereinafter collectively referred to as the CONTRACTOR, represented herein by ATLAS CONSOLIDATED MINING AND DEVELOPMENT CORPORATION, a corporation duly organized and existing under the laws of the Republic of the Philippines, with office at the 6fr Floor, Quad Alpha Centrum, 125 Pioneer Street, Mandaluyong City and represented in this act by its President, ALFREDO C. RAMOS, as authorized by its Board of Directors (please refer to ANNEX "A')

WITNESSETH:

WHEREAS, the 1987 Constitution of the Republic of the Philippines provides in
Article Xll, Section 2 thereof that all lands of the public domain, waters, minerals, coal, petroleum and other natural resources are owned by the State and that their exploration, development and utilization shall be under the full control and supervision of the State;


WHEREAS, the Constitution further provides that the State may directly undertake such activities, or it may enter into a Co-Production, Joint Venture, or Mineral Production Sharing Agreement with Filipino citizens, or cooperatives, partnerships, corporations or associations at least sixty per centum of whose capitalization is owned by such citizens;


WHEREAS, pursuant to Republic Act No. 7942, otherwise known as "The Philippine Mining Act of 1995, which took effect on 09 April 1995, the Secretary of the Department of Environment and Natural Resources is authorized to enter into Mineral Production Sharing Agreements in furtherance of the objectives of the Government and the Constitution to bolster the national economy through sustainable and systematic development and utilization of mineral lands;





WHEREAS, Atlas Consolidated Mining and Development Corporation (ACMDC), Heirs of Jose P. Velez, Heirs of Manuel Cuenco, Antonio V. Cuenco and Jon Ramon Aboitiz are the lessees of Mining/Lode Lease Contracts issued under previous laws;



`
WHEREAS, ACMDC is the representative of the other lessees mentioned above in filing and securing approval of mining applications over the leased areas; 

WHEREAS, on June 19, 1998, ACMDC filed an application for Mineral Production Sharing Agreement for itself and as representative of the same lessees above covering the areas subject of the Mining/Lode Lease Contracts, in the Mines and Geosciences Bureau Regional Office No. Vll;



WHEREAS, the Contractor has acress to all the financing, technical competence, technology and environmental management skills required to promptly and effectively carry out the objectives of this Agreement;



NOW, THEREFORE, for and in consideration of the foregoing premises, the mutual covenants, terms and conditions hereinafter set forth, it is hereby stipulated and agreed as follows:



SECTION I

SCOPE

1.1. This Agreement is a Mineral Production Sharing Agreement entered into
pursuant to the provisions of the Act and its implementing rules and
regulations. The primary purpose of this Agreement is to provide for the
sustainable development and commercial utilization of copper, gold and other
associated mineral deposits existing within the Contract Area, with all
necessary services, technology and financing to be furnished or arranged by
the Contractor in accordance with the provisions of this Agreement. The
Contractor shall not, by virtue of this Agreement, acquire any title over the
Contract Mining Area without prejudice to the acquisition by the Contractor of
the land/surface rights through any mode of acquisition provided for by law.

1.2. The Contractor shall undertake and execute, for and on behalf of the
Government, sustainable mining operations in accordance with the provisions
of this Agreement, and is hereby constituted and appointed, for the purpose
of this Agreement, as the exclusive entity to conduct mining operations in the
Contract Area. Provided, That any working agreement entered into by and
between ACMDC and the Heirs of Jose P. Velez, Heirs of Manuel Cuenco,
Antonio V. Cuenco and Jon Ramon Aboitiz involving the Contract Area, which
terms and conditions are contrary hereto, shall be their exclusive and sole
responsibility.

1.3 During the term of this Agreement, the total value of production and sale of
minerals derived from the mining operations contemplated herein shall be
accounted for and divided between the Government and the Contractor in
accordance with Section Vl hereof.

SECTION II



DEFINITIONS

As used in this Agreement, the following words and terms, whether singular orplural, shall have the following respective meaning:



2.1 Act refers to Republic Act No. 7942, otherwise known as the "Philippine
Mining Act of 1995."



2.2 Agreement means this Mineral Production Sharing Agreement



2.3 Associated Minerals mean other ores/minerals, which occur together with
the principal ore/mineral.



2.4 Bangko Sentral means Bangko Sentral ng Pilipinas



2.5 Budget means an estimate of expenditures to be made by Contractor in
mining operations contemplated hereunder to-accomplish the Work Program
for each particular period.

2.6 Bureau means Mines and Geosciences Bureau



2.7 Calendar Year or Year means a period of twelve (12) consecutive months
starting with the first day of January and ending on December 31 , while
"Calendar Quarter/ means a period of three consecutive months with the first
calendar quarter starting with the first day of January.

2.8 Commercial Production means the production of sufficient quantity of
minerals to sustain economic viability of mining operations reckoned from the
date of commercial operation as declared by the Contractor or as stated in
the feasibility study, whichever comes first.

2.9 Constitution or Philippine Constitution means the 1987 Constitution of the
Republic of the Philippines adopted by the Constitutional Convention of '1986
on October 15, 1986 and ratified by the People of the Republic of the
Philippines on February 2, 1987.

2.10 Contract Area means the area onshore or offshore delineated under the
Mineral Production Sharing Agreement subject to the relinquishment
obligations of the Contractor and properly defined by latitude and longitude or
bearing and distance.

2.11 Contract Year means a period of twelve (12) consecutive months counted from the Effective Date of this Agreement or from the anniversary of such Effective Date.



2.12. Contractor means Atlas consolidated Mining and Development corporation, Heirs of Manuel Cuenco, Heirs of Jose p. Velez, Manuel V. Cuenco and Jon Ramon Aboitiz or their respective assignee or assignees of interest under this Agreement: Provided, That the assignment of any of such interest is accomplished pursuant to the pertinent provisions of the implementing rules and regulations

2.13. Declaration of Mining Feasibilitv means a document proclaiming the
presence of minerals in a specific site, which are recoverable by sdcially
acceptable, environmentally safe and economically sound methods-specified
in the Mine Development plan.




2.14 Department or DENR means the Department of Environment and Natural Resources



2.15 Director means the Director of Mines and Geosciences Bureau.



2.16 Effective Date means the date of execution of this Agreement by the
Contractor and by the Secretary on behalf of the Government.

2.17 Environment means all facets of man's surroundings: physical, ecological, aesthetic, cultural, economic, historic, institutional and social.



2.18 Exploration means searching or prospecting for mineral resources by
geological, geophysical and geochemical surveys, remote sensing, test
pitting, trenching, drilling, shaft sinking, tunneling or any other means for the
purpose of determining the existence, extent, quality and quantity of mineral
resources and the feasibility of mining them for profit.

2.19 Force Majeure means acts or circumstances beyond the reasonable control of the Contractor including, but not limited to war, rebellion, insurrection, riots, civil disturbances, blockade, sabotage, embargo, strike, lockout, any dispute with surface owners and other labor disputes, epidemics, earthquake, storm, flood or other adverse weather conditions, explosion, fire, adverse action by the Government or by any of its instrumentality or subdivision thereof, act of God or any public enemy and any cause as herein described over which the affected party has no reasonable control.

2.20 Foreign Exchange means any currency other than the currency of
the Republic of the Philippines acceptable to the Government and the Contractor.

2.21 Government means the Government of the Republic of the Philippines or
any of its agencies and instrumentalities.

2.22 Gross Output means the actual market value of the minerals or mineral
products from each mine or mineral land operated as a separate entity,
without any deduction for mining, processing, refining, transporting, handling,
marketing or any other expenses: Provided, That if the minerals or mineral
products are sold or consigned abroad by the Contractor under C.l.F. terms,
the actual cost of ocean freight and insurance shall be deducted: Provided
further, That in the case of mineral concentrates which are not traded in
commodity exchanges in the Philippines or abroad such as copper
concentrate, the actual market value shall be the world price quotation of the
refined mineral products contained thereof prevailing in the said commodity
exchanges, after deducting the smelting, refining, treatment, insurance,
transportation and other charges incurred in the process of converting mineral
concentrates into refined metal traded in those commodity exchanges.

2.23 Mine Development refers to work mineral deposit undertaken to prepare an ore body or a construction of necessary for mining, including the
infrastructure and related facilities.



2.24 Minerals mean all naturally occurring inorganic substances in solid, liquid,
gas or any intermediate state excluding energy materials such as coal,
petroleum, natural gas, radioactive materials and geothermal energy.



2.25. Mineral Products mean materials derived from mineral ores/rocks and
prepared into marketable state by metallurgical processes which include
beneficiation, cyanidation, leaching, smelting, calcination and other similar
processes.

2.26. Mining Area means that portion of the Contract Area identified by the
Contractor as defined and delineated in a Survey Plan duly approved by the
Director/Regional Director concerned for purposes of development and/or
utilization and sites for support facilities.

2.27. Mining Operations means mining activities involving exploration, feasibility study, environmental impact assessment, development, utilization, mineral processing and mine rehabilitation.



2.28. Notice means notice in writing, telex or telecopy (authenticated by answer back or confirmation received) addressed or sent as provided in Section 13.2 of this Agreement.

2.29. Ore means naturally occurring substance or material from which a mineral or element can be mined and/or processed for profit.



2.30. Pollution means any alteration of the physical, chemical and/or biological
properties of any water, air and/or land resources of the Philippines, or any
discharge thereto of any liquid, gaseous or solid wastes or any production of
unnecessary noise or any emission of objectionable odor, as will or is likely to
create or render such water, air, and land resources harmful, detrimental or
injurious to public health, safety or welfare or which will adversely affect their
utilization for domestic, commercial, industrial, agricultural, recreational or
other legitimate purposes.

2.31. Secretarv means the Secretary of the Department of Environment and
Natural Resources.

2.32. State means the Republic of the Philippines.



2.33. Work Program means a document which presents the plan of major mining operations and the corresponding expenditures of the Contractor in its
Contract Area during a given period of time, including the plan and
expenditures for development of host and neighboring communities and of
local geoscience and mining technology, as submitted and approved in
accordance with the implementing rules and regulations of the Act.



SECTION III

TERM OF AGREEMENT



3.1.This Agreement shall have a term of twenty five (25) years from Effective
Date, and may be renewed thereafter for another term not exceeding twenty
five (25) years. The renewal of this Agreement, as well as the changes in the
terms and conditions thereof, shall be upon mutual consent by the parties. ln
the event the Government decides to allow mining operations thereafter by
other contractor, this must be through competitive public bidding. After due




publication of notice, the Contractor shall have the right to equal the highest
bid upon reimbursement of all reasonable expenses of the highest bidder.


SECTION IV



CONTRACT AREA



4.1 Size, Shape, and Location of Contract Area - This Agreement covers a
Contract Area of approximately Two Hundred Thirty Four and 2875/10000
(234.2875) hectares, situated in Toledo City, Cebu and bounded by the
following technical description (please refer to ANNEX "B" - 1:50,000 scale
Location Map/Sketch Plan):

Longitude







Latitude



1 2 3 4 5 6 7 8 9 0 2 2 3 4 5 お 7 3 9 。 ︲



1 2 3 4 5 6 7 8 9 01



1 ・ ・ ︲ ・ ・ ・ ・ 2



2 2 2 2



2 2 2 3 3







唸″



ψ











ψ







4.2.







19'29936"







123°







42'51065''







123°







10°







19'39.105"



19'35744''







123°







42'54458"



43'03716"







10°







19'58.471''







123°







43'12_128"







10°







19'58.463"







123・



123°







43'15763"



43'15808"







10°







20'17991"



20'17964"



20'47887"







10°







20'48817''







10。







10°



10°







10°







123°







43'28111''







123°







43'27150"







123°



123°







43'56_718"







20'19.539''







10°







20'15.938"







123°







10°







20'13010"







123°







20'12885''



20'00.469"



20'09_365"



20'03.160"







123°







123°







10°







19'48361"



19'48653"







123°







43'45321''



43'35.461"







10°







19'29.125''







123°







43'35416"







10'19'29131"



10° 19'25663"



10° 19'29023"



10° 19'19885"







123°







43'32773''







123°







43'31490"



43'22232"



43'18839"



43'09581"







10°







10°



10°



10°







10°



10°







123°



123°



123°







123°



123°







43'57656"



43'51853"



43'51946"



43'48004"



43'48114"



43'44828"



43'45366"







123°







10°







19'23215''



19'32.384"







123°







43'12974''







10°







19'29.023''







123・







10°







19'38.191"







123°



123°







10°







19'41551"



19'32383"







10°







19'35.744''







123°







10°







19'26575''







123°







43'22232"



43'25626"



43'16368"



43'12974"



43'03716"



43'00323"







10°







10°







123°



4.2 Survey Plan of the Contract Area - The Contractor shall submit for approval
by the Regional Director concerned, a survey plan for the Contract Area
within sixty (60) days from the effectivity of this Agreement.

SECTION V

OPERATING PERIOD

5.1 Timetable - The Contractor may commence commercial utilization activity immediately upon approval and registration of this Agreement, subject to the provision of Section 7.3 hereof The Contractor shall conduct minin






operations and other activities for the duration of the Operating Period in
accordance with the duly approved Work Program and Budget and
Environmental Compliance Certificate/Certificate of Non-coverage (please
refer to ANNEXES "C" and 'D"). Failure by the Contractor to undertake
commercial utilization within the period in accordance with the said Work
Program shall be considered a substantial breach of the Agreement.



5.2 Commercial Operation Work Program and Budget - During the Operating
Period, the Contractor shall submit to the Director, through the Regional
Director concerned, Work Programs and Budgets covering a period of three
(3) years each, which shall be submitted not later than thirty (30) days before
the expiration of the period covered by the previous Work Program.
The amount to be spent by the Contractor during the Operating Period under
the term of this Agreement shall not be less than that specified in the
approved Work Programs, such that during the first three (3) years of the
Operating Period, this amount shall be as follows:

First Contract Year                                   (Rehabilitation)

Second Contact Year                           PhP 1,872,571,000.00

Third Contract Year                               PhP 3,816,917,000.00

Should the Government wish to propose a revision to a certain specific
feature in the Work Program or Budget, it shall, within thirty (30) days after
receipt thereof, provide a Notice to the Contractor specifying in reasonable
detail its reasons therefore. Promptly thereafter, the Government and
Contractor will meet and endeavor to agree on the revision proposed by the
Government. ln any event, any portion of said Work Program or Budget as to
which the Government shall fail to notify the Contractor of proposed revision
shall, in so far as possible, be carried out as prescribed herein. lf the
Government should fail within sixty (60) days from receipt thereof to notify
Contractor of the proposed revisions, the Work Program and Budget
proposed by the Contractor shall be deemed to be approved.



It is recognized by the Government and the Contractor that the details of any
Work Program may require changes in the light of changing circumstances.
The Contractor may make such changes: Provided, That it shall not change
the general objective of the Work Program: Provided further, That changes
which entail a variance of at least twenty percent (20%) shall be subject to the
approval of the Director.




The Government's approval of a proposed Work program and Budget will not
be unreasonably withheld.

5.3 Expansion and Modification of Facilities - The contractor may make
expansions, modifications, improvements, and replacements of the mining
facilities and may add new facilities as the contractor may consider
necessary for the operations: provided, That such plans shall be embodied in
an appropriate Work program approved by the Director.




Reporting



Quarterly Reports - Beginning with the first Calendar Quarter following

the approval of this Agreement, the Contractor shall submit, within

thirty (30) days after the end of each Calendar Quarter, to the Director,

through the Regional Director concerned, a Quarterly Report stating

the tonnage of production in terms of ores, concentrates, and their

corresponding grades and other types of products; value, destination

of sales or exports and to whom sold, terms of sales and expenditures.

b



Annual Reports - During the Operating Period, the Contractor shall

submit, within sixty (60) days from the end of each Calendar Year, to

the Director through the Regional Director concerned, an Annual

Report indicating in sufficient detail:



b.1.



The total tonnage of ore reserves whether proven, probable, or

inferred, the total tonnage of ores, kind by kind, broken down

between tonnage mined, tonnages transported from the

minesite and their corresponding destination, tonnages

stockpiled in the mine and elsewhere in the Philippines,

tonnages sold or committed for export (whether actually shipped

from the Philippines or not), tonnages actually shipped from the

Philippines (with full details as to purchaser, destination and

terms of sale), and if known to the Contractor, tonnages refined,

processed or manufactured in the Philippines with full

specifications as to the intermediate products, by-products or

final products and of the terms at which they were disposed;



b.2.



Work accomplished and work in progress at the end of the year

under consideration in relation to the Work Program, including

the investment actually made or committed; and



b.3.



Profile of work force, including management and staff, stating

particularly their nationalities, and for Filipinos, their place of

origin (i.e., barangay, town, province, region).



v



,



The Contractor shall also comply with other reporting requirements as

provided in the implementing rules and regulations of the Act.



SECTION VI



FISCAL REGIME

6.1



.



f'



General Principle - The fiscal regime of this Agreement shall be governed by

the principle according to which the Government expects a reasonable return

in economic value for the utilization of non-renewable mineral resources

under its national sovereignty while the Contractor expects a reasonable

return on its investment with special account to be taken for the high risk of

exploration, the terms and conditions prevailing elsewhere in the industry and

any special efficiency to be gained by a particularly good performance of the

Contractor.



8



6.2. Registration Fees - within fifteen (15) days upon receipt of the notice of
approval of the Agreement from the Regional Office concerned, the
contractor shall cause the registration of this Agreement with the said
Regional Office and pay the registration fee at the rate provided in the
existing rules and regulations. Failure of the contractor to cause the
registration of this Agreement within the prescribed period shall be sufficient
ground for cancellation of the same.

6.3. Occupation Fees - Prior to registration of this Agreement and at the same
date every year thereafter, the Contractor shall pay to the Municipal/City
Treasurer concerned an occupation fee over the contract Area at the annual
rate provided in the existing rules and regulations. lf the fee is not paid on
the date specified, the Contractor shall pay a surcharge of twenty five percent
(25%) of the amount due in addition to the occupation fees.

6.4. Share of the Government - The Government Share shall be the excise tax on mineral products at the time of removal and at the rate provided for in
Republic Act No. 7729 amending Section 151 (a) of the National lnternal
Revenue Code, as amended, as well as other taxes, duties and fees levied by
existing laws. The Excise Tax shall be timely and completely paid to the
nearest Bureau of lnternal Revenue Office in the province concerned.

For purposes of determining the amount of the herein Government Share, the
Contractor shall strictly comply with the auditing and accounting requirements
prescribed under existing laws and regulations.

The Government Share shall be allocated in accordance with Sections 290
and 292 of Republic Act No. 7160, otherwise known as ,,The Local
Government Code of 1991.'

6.5.. Pricing of Sales - The Contractor shall dispose of the minerals and by-
products produced at the highest market price prevailing in the locality: The
contractor shall also pay the lowest achievable marketing commissions and
related fees and shall negotiate for more advantageous terms and conditions
subject to the right to enter into long-term sales or marketing contracts or
foreign exchange and commodity hedging contracts, which the Government
acknowledges to be acceptable notwithstanding that the sale price of the
minerals and by-products may from time to time be lower, or the terms and
conditions of sales are less favorable, than that available elsewhere. The
contractor shall Seek to strike a balance between long term sales or
marketing contracts or foreign exchange and commodity hedging contracts
comparable to policies followed by independent producer in the international
mining industry.

The contractor shall likewise seek a balanced distribution among consumers.
lnsofar as sales to contractors affiliate(s) are concerned, pricel shall be at
arm's length standard, and competing offers for large scale and long-term
contracts shail be procured. Before any sale and/or shipment of mineral
product is made, exisling. and future marketing contract(s)/sarer
shall be submitted ro the Director, copy frimished the Regional Director concerned, for registration. At the same time, the Contractor shall regularly inform the Director in writing of any revisions, changes or additions in said contract/agreement



The Contractor shall reflect in its Monthly/Quarterly Report on Production,
Sales and lnventory of Minerals, as well as in the lntegrated Annual Report,
the corresponding registration number(s) of the marketing contract(s)/
agreement(s) governing the export or sale of minerals.

6.6. Associated Minerals - lf minerals other than copper and gold are discovered in commercial quantities in the Contract Area, the value thereof shall be added to the value of the principal mineral in computing the Government share.


SECTION VII


ENVIRONMENTAL PROTECTION AND MINE SAFETY AND HEALTH

7.1. The Contractor shall manage its Mining Operations in a technically,
financially, socially, culturally and environmentally responsible manner to
achieve the sustainable development objectives and responsibilities as
provided for under the implementing rules and regulations of the Act.


7.2. The Contractor shall ensure that the standards of environmental protection are met in the course of the Mining Operations. To the extent possible, control of pollution and the transformation of the mined-out areas or materials into economically and socially productive forms must be done simultaneously with mining.

7.3. An Environmental Compliance Certificate (ECC) shall be secured first by the Contractor prior to the conduct of any development works, construction of
production facilities and/or mine production activities, including the
commissioning of any new tailings disposal site in or outside the Contract
Area.

7.4. The Contractor shall submit within thirty (30) Calendar days after the issuance and receipt of the ECC, an Environmental Protection and Enhancement Program (EPEP) using MGB Form No. 16-2 covering all areas to be affected by development, utilization and processing activities under this Agreement.  The Contractor shall allocate for its initial environment-related capital expenditures approximately ten percent (10%) of the total project cost or in such amount depending on the environmental/geological condition, nature and scale of operations and technology to be employed in the Contract Area.

7.5. The Contractor shall submit, within thirty (30) days prior to the beginning of
every calendar year, an Annual Environmental Protection and Enhancement
Program (AEPEP), using MGB Form 16-3, which shall be based on the
approved EPEP. The AEPEP shall be implemented during the year for which
it was submitted. To implement its AEpEp, the Contractor shall allocate
annually three to five percent (3-5%) ol its direct mining and milling costs
depending on the environmental/geologic condition, nature and scale of
operations and technology employed in the Contract Area.

7.6. The Contractor shall establish a Contingent Liability and Rehabilitation Fund (CLRF) which shall be in the form of the Mine Rehabilitation Fund (MRF)
and the Mine Waste and Tailings Fee (MWTF). 











The MRF shall be based on the financial requirements of the approved EPEP
as a reasonable environmental deposit to ensure satisfactory compliance with
the commitments/strategies of the EPEP/AEPEP and availability of funds for
the performance of the EPEP/AEPEP during the specific project phase. The
MRF shall be deposited as Trust Fund in a government depository bank and
shall be used for physical and social rehabilitation of areas affected by mining
activities and for research on the social, technical and preventive aspects of
rehabilitation.

The MWTF shall be collected based on the amounts of mine waste and mill
tailings generated during the conduct of Mining Operations. The MWTF
collected shall accrue to a Mine Waste and Tailings Reserve Fund and shall
be deposited in a government depository bank for payment of compensation
for damages caused by the Mining Operations.

7.7 The Contractor shall set up mitigating measures such as mine waste and mill tailings disposal system, mine rehabilitation or plan, water quality monitoring, etc. to minimize land degradation, air and water pollution, acid rock drainage and changes in hydrogeology.

7.8. The Contractor shall set up an Environmental and Safety Office at its minesite manned by qualified personnel to plan, implement and monitor its approved EPEP.



7.9. The Contractor shall be responsible in the monitoring of environmental, safety and health conditions in the Contract Area and shall strictly comply with all the rules and regulations embodied under DAO No. 2000-98, otherwise known as the "Mine Safety and Health Standards.

7.10. The Contractor shall be responsible for the submission of a final mine
' rehabilitation and/or decommissioning plans, including its financial
requirements and incorporating the details and particulars set forth in the
implementing rules and regulations of the Act.

SECTION VIII



RIGHTS AND OBLIGATIONS OF THE PARTIES



8.1 Obligations of the Contractor:

a. To exclusively conduct sustainable Mining Operations within the Contract Area in accordance with the provisions of the Act and its implementing rules and regulations;

b. To construct and operate any facilities specified under the Mineral Agreement or approved Work Program;

c. To determine the exploration, mining and treatment process to beutilized in the Mining Operations;


d. To extract, remove, use and dispose of any tailings as authorized by
an approved Work program;




e. To secure all permits necessary or desirable for the purpose of Mining
Operations;

f. To keep accurate technical records about the Mining Operations, as
well as financial and marketing accounts, and make them available to
Government representatives authorized by the Director for the purpose
of assessing the performance and compliance of the Contractor with
the terms of this Agreement. Authorized representatives of other
Government Agencies may also have access to such accounts in
accordance with existing laws, rules and regulations;

g. To furnish the Bureau all the data and information gathered from the
Contract Area and that all the books of accounts and records shall be
open for inspection;



h. To allow access to Government during reasonable hours in inspecting
the Contract Area and examining pertinent records for purposes of
monitoring compliance with the terms of this Agreement,

i. To hold the Government free and harmless from all claims
and accounts of all kinds, as well as demands and actions arising out of the
accidents or injuries to persons or properties caused by Mining
Operations of the Contractor and indemnify the Government tor any
expenses or costs incurred by the Government by reason of any such
claims, accounts, demands or actions;

j. ln the development of the community:

j.1.To recognize and respect the rights, customs and traditions of
indigenous cultural communities over their ancestral lands and
to allocate royalty payment of not less than one percent (1%) of
the value of the gross output of minerals sold;



j.2 To coordinate with proper authorities in the development of the
mining community and for those living in the host and
neighboring communities through social infrastructure, livelihood
programs, education, water, electricity and medical services.
Where traditional self-sustaining income and the community
activities are identified to be present, the Contractor shall assist
in the preservation and/or enhancement of such activities;

j.3 To allot annually a minimum of one percent (1%) of the direct
mining and milling costs necessary to implement the activities
undertaken in the development of the host and neighboring
communities. Expenses for community development may be
charged against the royalty payment of at least one percent
(1%) of the gross output intended for the concerned indigenous
cultural community;

j.4 To give preference to Filipino citizens who have established
domicile in the neighboring communities, in the hiring of
personnel for its mining operations. lf necessary skills and




expertise are currently not available, the Contractor must
immediately prepare and undertake a training and recruitment
program at its expense; and

j.5. To incorporate in the Mining Feasibility Study the
expenditures necessary to implement (.1) to (.3) of this Section,

k. ln the development of Mining Technology and Geosciences:


k.1 ln the course of its operations, to produce geological,
geophysical, geochemical and other types of maps and reports
that are appropriate in scale and in format and substance which
.are consistent with the internationally accepted standards and
practices. Such maps shall be made available to the scientific
community in the most convenient and cost effective forms,
subject to the condition that the Contractor may delay release of
said information for a reasonable period of time which shall not
exceed three (3) years;

k.2. To systematically keep the data generated from the Contract  Mining Area such assays and other related information, including economic and financial data and make them accessible to students, researchers and other personsresponsible for developing mining, geoscience and processingtechnology subject to the condition that the Contractor maydelay release of data to the science and technology communitywithin a reasonable period of time which shall not exceed three (3) years;


k.3. To transfer to the Government or local mining company the
appropriate technology it may adapt in the exploration,
development and commercial utilization of the minerals in the
Contract Area;


k.4. To allocate research and development budget for the advancement of mining technology and geosciences in coordination with the Bureau, research institutions, academe, etc.; and

k.5. To replicate data, maps and reports cited in (k..1) and (k.2) and
furnish the Bureau for archiving and systematic safekeeping
which shall be made available to the science and technology
community for conducting research and undertaking other
activities which contribute to the development of mining,
geoscience and processing technology and the correspondingly
national pool of manpower talents: provided, however, that the
release of data, maps and the like shall be similarly constrained
in accordance with (k.1) and (k.2) above;


k.6 To incorporate in the Mining Feasibility Study the planned expenditures
necessary to implement all the plans and programs set forth in this
Agreement; and



m. To pay all other taxes and fees mandated by existing laws, rules and
regulations.

8.2 Rights of the Contraclor:



a. To conduct Mining Operations within the confines of its
in accordance with the terms and conditions
hereof and without interfering with the rights of other
Contract Mining Area Contractors/Lessees/Operators/ Permittees/Permit Holders;

b.Of possession of the Contract Area, with full right of ingress and
egress and the right to occupy the same, subject to surface and
easement rights;

c. To use and have access to all declassified geological, geophysical,
drilling, production and other data relevant to the mining operations;



d. To sell, assign, transfer, convey or otherwse dispose of all its rights,
interests and obligations under the Agreement subject to the approval
of the Government;

e. To employ or bring into the Philippines foreign technical and
specialized personnel, including the immediate members of their
families as may be required in the operations of the Contractor, subject
to applicable laws and regulations: Provided, That if the employment
connection of such foreign persons with the Contractor ceases, the
applicable laws and regulations on immigration shall apply to them.
Every time foreign technologies are utilized and where alien executives
are employed, an effective program of training understudies shall be
undertaken. The alien employment shall be limited to technologies
requiring highly specialized training and experience subject to the
required approval under existing laws, rules and regulations;

f. To enjoy easement rights and use of timber, water and other natural
resources in the Contract Area subject to pertinent laws, rules and
regulations and the rights of third parties;

g. Of repatriation of capital and remittance of profits, dividends and
interest on loans, subject to existing laws and Bangko Sentral ng
Pilipinas rules and regulations; and

h. To import when necessary all equipment, spare parts and raw
materials required in the operations in accordance with existing laws
and regulations.

8.3. Obligations of the Government

a.To ensure that the Contractor has the Government,s full cooperation in
the exercise of the rights granted to it under this Agreement;



b. To use its best efforts to ensure the timely issuance of necessary
permits and similar authorizing documents for use of the surface of the
Contract Area; and

c. To cooperate with the Contractor in its efforts to obtain financing
contemplated herein from banks or other financial institutions:
Provided, That such financing arrangements will in no event reduce the
Contractor/s obligation on Government rights hereunder.



SECTION IX

ASSETS AND EQUIPMENT

9.1 The Contractor shall acquire for the Mining Operations only such assets that are reasonably estimated to be required in carrying out such Mining
Operations.

9.2 All materials, equipment, plant and other installations of a movable nature
erected or placed on the Contract Area by the Contractor shall remain the
property of the Contractor. The Contractor shall have the right to remove and
re-export such materials and equipment, plant and other installations from the
Philippines, subject to existing rules and regulations. ln case of cessation of
Mining Operations on public lands occasioned by its voluntary abandonment
or withdrawal, the Contractor shall have a period of one (1) year from the time
of cessation within which to remove its improvements; otherwise, all social
infrastructures and facilities shall be turned over or donated tax free to the
proper government authorities, national or local, to ensure that said
infrastructures and facilities are continuously maintained and utilized by the
host and neighboring communities.

SECTION X



EMPLOYMENT AND TRAINING OF PHILIPPINE PERSONNEL

10.1. The Contractor agrees to employ, to lhe extent possible, qualified Filipino
personnel in all types of mining operations for which they are qualified; and
after Commercial Production commences shall, in consultation and with
consent of the Government, prepare and undertake an extensive training
programme suitable to Filipino nationals in all levels of employment. The
objective of said programme is to reach within the timetable set forth below
the following targets of "Filipinization:'

Unskllled Skilled

Clerical Professional Management



 



Year 1 100% 100%

100% 75% 75%



Year 3 100% 100%

100% 80% 80%



Year 5 100% 100%

100% 90% 90%



Year 7 100% 100%

100% 95% 95%



Year 10 100% 100%

100% 95%  95%



Year 15 100% 100%

100% 95%  95%


10.2 Cost and expenses of training such Filipino personnel and the
own employees shall be included in the Operating Expenses.







10.3 The Contractor shall not discriminate on the basis of gender and shall respect the right of women workers to participate in policy and decision-making
processes affecting their rights and benefits.



SECTION XI

ARBITRATION



11.1. The Government and the Contractor shall consult with each other in good faith and shall exhaust all available remedies to settle any and all disputes or disagreements arising out of or relating to the validity, interpretations, enforceability, or performance of this Agreement before resorting to arbitration as provided for in Section 11.2. below.



11.2. Any disagreement or dispute which can not be settled amicably within
a period of one (1) year from the time the issue is raised by a Party shall be
settled by a tribunal of three (3) arbitrators. This tribunal shall be constituted
as follows: one to be appointed by the Contractor and the other to be
appointed by the Secretary. The first two appointed arbitrators shall consider
names of qualified persons until agreement on a mutually acceptable
Chairman of the tribunal is selected. Such arbitration shall be initiated and
conducted pursuant to Republic Act No. 876, otherwise known as the
"Arbitration Act."

ln any event, the arbitration shall be conducted applying the substantive laws
of the Republic of the Philippines.

11.3. Each party shall pay fifty percent (50%) of the fees and expenses of the
Arbitrators and the costs of arbitration. Each party shall pay its own costs and
attorney's fee.



SECTION XI!



SUSPENSION OR TERMINATION OF CONTRACT, TAX INCENTIVES AND CREDITS

12.1 This Agreement may be suspended for failure of the Contractor: (a) to comply with any provision or requirement of the Act and/or its implementing rules and regulations; (b) to pay on time the complete taxes, fees and/or other charges demandable and due the Government.

12.2. This Agreement terminates or may be terminated for the following causes: (a) expiration of its term, whether original or renewal; (b) withdrawal from the Agreement by the Contractor, (c) violation by the Contractor of the
Agreement's terms and conditions; (d) failure to pay taxes, fees/or charges or
financial obligations for two (2) consecutive years; (e) false statement or
omission of facts by the contractor; and (f) any other cause or reason
provided under the Act and its implementing rules and regulations, or any
other relevant laws and regulations.




12.3. All statements made in this Agreement shall be considered as conditions and essential parts hereof, and any falsehood in said statements or omission of facts which may alter, change or affect substantially the fact set forth in said
statements shall be a ground for its revocation and termination.



12.4. The Contractor may, by giving due notice at any time during the term of this Agreement, apply for its cancellation due to causes which, in the opinion of
- the Contractor, render continued mining operation no longer feasible or
viable. ln this case, the Secretary shall decide on the application within thirty
(30) days from notice: Provided, That the Contractor has met all the financial,
fiscal and legal obligations.

12.5. No delay or omissions or course of dealing by the Government shall impair any of its rights under this Agreement, except in the case of a written waiver. The Government's right to seek recourse and relief by all other means shall not be construed as a waiver of any succeeding or other default unless the contrary intention is reduced in writing and signed by the party authorlzed to exercise the waiver.

12.6. ln case of termination, the Contractor shall pay all the fees and other liabilities due up to the end of the year in which the termination becomes effective. The Contractor shall immediately carry out the restoration of the Contract Area in accordance with good mining industry praclice.

12.7. The withdrawal by the Contractor from the Mineral Agreement shall not
release it from any and all financial, environmental, legal and fiscal obligations
under this Agreement.

12.8. The following acts or omission, inter a/ia shall constitute breach of contract, upon which the Government may exercise its right to terminate the
Agreement:

a. Failure of the Contractor without valid reason to commence Commercial Production within the period prescribed; and/or 

b. Failure of the Contractor to conduct mining operations and other activities in accordance with the approved Work Programs and/or any modification thereof as approved by the Director.

12.9. The Government may suspend and cancel tax incentives and credits if the Contractor fails to abide by the terms and conditions of said incentives and
credits.

SECTION XIII

OTHER PROVISIONS

13.1. Any terms and conditions resulting from repeal or amendment of any existing laws or regulation or from the enactment of a law, regulation or administrative order shall be considered a part of this Agreement.




13.2. Notice 



All notices, demands and other communications required or permitted
hereunder shall be made in writing, telex or telecopy and shall be deemed to
have been duly given notice, in the case of telex or telecopy, if answered
back or confirmation received, or if delivered by hand, upon receipt or ten
days after being deposited in the mail, airmail postage prepaid and addressed
as follows:

lf to the Government:

THE SECRETARY



DEPARTMENT oF ENVIRONMENT AND NATURAL RESOURCES
DENR Building, Visayas Avenue
Diliman, Quezon City

lf to the Contractor:



THE PRESIDENT
ATLAS CONSOLIDATED MINING AND DEVELOPMENT CORPORATION
6th Flr., Quad Alpha Centrum
125 Pioneer St., Mandaluyong City

Either party may substitute or change such address on notice thereof to the
other party.

13.3. Governing Law



This Agreement and the relation between the parties hereto shall be
governed by and construed in accordance with the laws of the Republic of the
Philippines. The Contractor hereby agrees and obliges itself to comply with
the provisions of the Act, its implementing rules and regulations and other
relevant laws and regulations.

13.4. Suspension of Obligation

a. Any failure or delay on the part of any party in the performance of its
obligation or duties hereunder shall be excused to the extent
attributable to Force Majeure as defined in the Act: provided, That the
suspension'of Mining Operations due to Force Majeure causes shall
be subject to approval by the Director.



b. lf Mining Operations are delayed, curtailed or prevented by such Force
Majeure causes, then the time for enjoying the rights and carrying out
the obligations thereby affected, the term of this Agreement and all
rights and obligations hereunder shall be extended for a period equal
to the period involved.

c. The Party, whose ability to perform its obligations is affected by such
Force Majeure causes, shall promptly give Notice to the other in writing
of any such delay or failure of performance, the expected duration
thereof and its anticipated effect and shall use its efforts to remedy
such delay, except that neither party shall be under any obligation
to 







settle a labor dispute: Provided, That the suspension of obligation by
the Contractor shall be subject to prior approval by the Director.

13.5. Amendments



This Agreement shall not be annulled, amended or modified in any respect
except by mutual consent in writing of the herein parties.

lN WITNESS WHEREOF, the Parties hereto have executed this Agreement, as of the day and year first above written



THE REPUBLIC OF THE PHILIPPINES



BY:







MICHAEL T.DEFENSOR
Secretary
Department of Environment and Natural Resources







ATLAS CONSOLIDATED MINING AND
DEVELOPMENT CORPORATION,HEIRS OF
JOSE P.VELEZ,HEIRS OF MANUEL CUENCO,
ANTONIO V. CUENCO&JON RAMON ABOITIZ



BY: ・
 
ALFREDO C. RAMOS
President
Atlas Consolidated Mining and Development Corporation




SIGNED IN THE PRESENCE OF:







(Signature over Printed Name)




ACKNOWLEDGEMENT



 



Republic of the

Philippines



Quezon City



 



Before me, a Notary

Public for and in the City of Quezon personally appeared MICHAEL T. DEFENSOR, with Community Tax Certificate No. 15653147issued on January 5, 2005 at

Quezon City in his capacity as Secretary of Department of

Environment and Natural Resources and ALFREDO C. RAMOS, with Community Tax

Certificate No. 6022546 issued on January 5, 2005 at Paranaque City, in his

capacity as President of Atlas Consolidated Mining and Development Corporation both known to me and to

me known to be the same persons who executed the foregoing instrument

consisting of twenty (20) pages, including this acknowledgment page, and acknowledged to me

that the same is their voluntary acts and deeds.



 



IN WITNESS THEREOF,

I have herunto set my hand and affix my notarial seal, this 05 MAY 2005 day of _____________________.



 



JEWELYNE JB VALENTON - CARREON



Notary

Public



 



Doc. No. 225



Page No. 46



Book No. I



Series of 2005