MINERAL PRODUCTION SHARING AGREEMENT
No. 255-2007-V





This MINERAL PRODUCTION SHARING AGREEMENT is made and entered into
in Quezon City, Philippines, this ________ day of JUL 30 2007 by and
between:





THE REPUBLIC OF THE PHILIPPINES, herein referred to as the GOVERNMENT,
represented in this act by the Secretary of the Department of Environment and
Natural Resources, with offices at the Department of Environment and Natural
Resources Building, Visayas Avenue, Diliman, Quezon City





and

FILMINERA RESOURCES CORPORATION, a corporation duly organized and
existing under the laws of the Republic of the Philippines, herein referred to as the
CONTRACTOR, with office at 3rd Floor Corinthian Plaza Condominium Building, No.
121 Paseo de Roxas, Legaspi Village, Makati city and represented in this act by its
President, Rolando Q. Amores, as authorized by its Board of Directors (please refer
to ANNEX "A")





WITNESSETH:

WHEREAS,the 1987 Constitution of the Republic of the Philippines provides in
Article XII , Section 2 thereof that a‖ lands of the public domain, waters, minerals,
coal, petroleum and other natural resources are owned by the State and that their
exploration, development and utilization shall be under the full control and
supervision of the State;

WHEREAS, the Constitution further provides that the state may directly undertake
such activities, or it may enter into a co-Production, Joint Venture, or Mineral
Production sharing Agreement with Filipino citizens, or cooperatives, partnerships,
corporations or associations at least sixty per centum of whose capitalization is
owned by such citizens;

WHEREAS, pursuant to Republic Act No. 7942, otherwise known as "The Philippine
Mining Act of 1995," which took effect on 09 April 1995, the secretary of the
Department of Environment and Natural Resources is authorized to enter into
Mineral Production Sharing Agreements in furtherance of the objectives of the
Government and the constitution to bolster the national economy through
sustainable and systematic development and utilization of mineral lands;

WHEREAS, the Government desires to avail itself of the financial resources,
technical competence and skill, which the Contractor is capable of applying to the
mining operations of the project contemplated herein;






WHEREAS, the Contractor desires to join and assist the Government in the initial
rational exploration and possible development and utilization for commercial
purposes of certain gold and other associated mineral deposits existing in the
Contract Area (as herein defined);

WHEREAS, the Contractor has access to all the financing, technical competence,
technology and environmental management skills required to promptly and
effectively carry out the objectives of this Agreement;

NOW, THEREFORE, for and in consideration of the foregoing premises, the mutual
covenants, terms and conditions hereinafter set forth, it is hereby stipulated and
agreed as follows:

SECTION I

SCOPE

1.1. This Agreement is a Mineral Production Sharing Agreement entered into
pursuant to the provisions of the Act and its implementing rules and
regulations. The primary purpose of this Agreement is to provide for the
rational exploration, development and commercial utilization of certain Gold
and other associated mineral deposits existing within the Contract Area, with
all necessary services, technology and financing to be furnished or arranged
by the Contractor in accordance with the provisions of this Agreement The
Contractor shall not, by virtue of this Agreement, acquire any title over the
Contract/Mining Area without prejudice to the acquisition by the Contractor of
the land/surface rights through any mode of acquisition provided for by law.

1.2. The Contractor shall undertake and execute, for and on behalf of the
Government, sustainable mining operations in accordance with the provisions
of this Agreement, and is hereby constituted and appointed, for the purpose
of this Agreement, as the exclusive entity to conduct mining operations in the
Contract Area.

1.3. The Contractor shall assume all the exploration risk such that if no minerals in
commercial quantity are developed and produced, it will not be entitled to
reimbursement.

1.4. During the term of this Agreement, the total value of production and sale of
minerals derived from the mining operations contemplated herein shall be
accounted for and divided between the Government and the Contractor in
accordance with Section VIII hereof.

SECTION II

DEFINITIONS

As used in this Agreement, the following words and terms, whether singular or
plural, shall have the following respective meaning:

2

2.1. Act refers to Republic Act No. 7942, otherwise known as the "Philippine
Mining Act of 1995."

2.2. Agreement means this Mineral Production Sharing Agreement.

2.3. Associated Minerals mean other ores/minerals, which occur together with
the principal ore/mineral.

2.4. Bangko Sentral means Bangko Sentral ng Pilipinas.

2.5. Budget means an estimate of expenditures to be made by Contractor in
mining operations contemplated hereunder to accomplish the Work Program
for each particular period.

2.6. Bureau means Mines and Geosciences Bureau.

2.7. Calendar Year or Year means a period of twelve (12) consecutive months
starting with the first day of January and ending on December 31, while
"Calendar Quarter" means a period of three consecutive months with the first
calendar quarter starting with the first day of January.

2.8. Commercial Production means the production of sufficient quantity of
minerals to sustain economic viability of mining operations reckoned from the
date of commercial operation as declared by the Contractor or as stated in
the feasibility study, whichever comes first.

2.9. Constitution or Philippine Constitution means the '1987 Constitution of the
Republic of the Philippines adopted by the Constitutional Convention of '1986
on October 15, 1986 and ratified by the People of the Republic of the
Philippines on February 2, 1987.

2.10 Contract Area means the area onshore or offshore delineated under the
Mineral Production Sharing Agreement subject to the relinquishment
obligations of the Contractor and properly defined by latitude and longitude or
bearing and distance.

2.11. Contract Year means a period of twelve (12) consecutive months counted
from the Effective Date of this Agreement or from the anniversary of such
Effective Date.

2.12. Contractor means Filminera Resources Corporation or its assignee or
assignees of interest under this Agreement: Provided, That the assignment
of any of such interest is accomplished pursuant to the pertinent provisions of
the implementing rules and regulations of the Act.

2.13. Declaration of Mining Project Feasibility means a document proclaiming the
presence of minerals in a specific site, which are recoverable by socially
acceptable, environmentally safe and economically sound methods specified
in the Mine Development Plan.

2.14. Department or DENR means the Department of Environment and Natural
Resources.

3

2.15. Director means the Director of Mines and Geosciences Bureau.

2.16. Effective Date means the date of execution of this Agreement by the
Contractor and by the Secretary on behalf of the Government.

2.17. Environment means all facets of man's surroundings: physical, ecological,
aesthetic, cultural, economic, historic, institutional and social.

2.18. Exploration means searching or prospecting for mineral resources by
geological, geophysical and geochemical surveys, remote sensing, test
pitting, trenching, drilling, shaft sinking, tunneling or any other means for the
purpose of determining the existence, extent, quality and quantity of mineral
resources and the feasibility of mining them for profit.

2.19. Exploration Period shall mean the period from the Effective Date of this
Agreement, which shall be for two (2) years, renewable for like periods but
not to exceed a total term of six (6) years for nonmetallic minerals and eight
(8) years for metallic minerals, subject to the pertinent provisions of the
implementing rules and regulations of the Act.

2.20. Force Majeure means acts or circumstances beyond the reasonable control
of the Contractor including, but not limited to war, rebellion, insurrection, riots,
civil disturbances, blockade, sabotage, embargo, strike, lockout, any dispute
with surface owners and other labor disputes, epidemics, earthquake, storm,
flood or other adverse weather conditions, explosion, fire, adverse action by
the Government or by any of its instrumentality or subdivision thereof, act of
God or any public enemy and any cause as herein described over which the
affected party has no reasonable control.

2.21. Foreign Exchange means any currency other than the currency of the
Republic of the Philippines acceptable to the Government and the Contractor.

2.22. Government means the Government of the Republic of the Philippines or
any of its agencies and instrumentalities.

2.23. Gross Output means the actual market value of the minerals or mineral
products from each mine or mineral land operated as a separate entity,
without any deduction for mining, processing, refining, transporting, handling,
marketing or any other expenses: Provided, That if the minerals or mineral
products are sold or consigned abroad by the Contractor under C.l.F. terms,
the actual cost of ocean freight and insurance shall be deducted: Provided
further, That in the case of mineral concentrates which are not traded in
commodity exchanges in the Philippines or abroad such as copper
concentrate, the actual market value shall be the world price quotation of the
refined mineral products contained thereof prevailing in the said commodity
exchanges, after deducting the smelting, refining, treatment, insurance,
transportation and other charges incurred in the process of converting
mineral concentrates into refined metal traded in those commodity
exchanges.

4


2.24. Mine Development refers to work undertaken to prepare an ore body or a
mineral deposit for mining, including the construction of necessary
infrastructure and related facilities.

2.25. Minerals mean all naturally occurring inorganic substances in solid, liquid,
gas or any intermediate state excluding energy materials such as coal,
petroleum, natural gas, radioactive materials and geothermal energy.

2.26. Mineral Products mean materials derived from mineral ores/rocks and
prepared into marketable state by metallurgical processes which include
beneficiation, cyanidation, leaching, smelting, calcination and other similar
processes.

2.27. Mining Area means that portion of the Contract Area identified by the
Contractor as defined and delineated in a Survey Plan duly approved by the
Director/Regional Director concerned for purposes of development and/or
utilization and sites for support facilities.

2.28. Mining Operations means mining activities involving exploration, feasibility
study, environmental impact assessment, development, utilization, mineral
processing and mine rehabilitation.

2.29. Notice means notice in writing, telex or telecopy (authenticated by answer
back or confirmation received) addressed or sent as provided in Section 16.2
of this Agreement.

2.30. Ore means naturally occurring substance or material from which a mineral
or element can be mined and/or processed for profit.

2.31. Pollution means any alteration of the physical, chemical and/or biological
properties of any water, air and/or land resources of the Philippines, or any
discharge thereto of any liquid, gaseous or solid wastes or any production of
unnecessary noise or any emission of objectionable odor, as will or is likely to
create or render such water, air, and land resources harmful, detrimental or
injurious to public health, safety or welfare or which will adversely affect
their utilization for domestic, commercial, industrial, agricultural, recreational
or other legitimate purposes.

2.32. Secretary means the Secretary of the Department of Environment
and Natural Resources.

2.33. State means the Republic of the Philippines.

2.34. Work Program means a document which presents the plan of major mining
operations and the corresponding expenditures of the Contractor in its
Contract Area during a given period of time, including the plan and
expenditures for development of host and neighboring communities and of
local geoscience and mining technology, as submitted and approved in
accordance with the implementing rules and regulations of the Act.

5


SECTION III

TERM OF AGREEMENT

3.1. This Agreement shall have a term of twenty five (25) years from Effective
Date, and may be renewed thereafter for another term not exceeding twenty
five (25) years. The renewal of this Agreement, as well as the changes in the
terms and conditions thereof, shall be upon mutual consent by the parties. In
the event the Government decides to allow mining operations thereafter by
other Contractor, this must be through competitive public bidding. After due
publication of notice, the Contractor shall have the right to equal the highest
bid upon reimbursement of all reasonable expenses of the highest bidder.

SECTION IV

CONTRACT AREA

4.1. Size, Shape, and Location of Contract Area - This Agreement covers a
Contract Area of approximately One hundred twenty-nine and 7217/10000
hectares (129.7217), situated in Aroroy, Masbate and bounded by the
following geographical coordinates (please refer to ANNEX "B" - 1:50,000
scale Location Map/Sketch Plan):

Corner                  Latitude                    Longitude
1                            12° 27' 00.001"        123° 22' 59.992"
2                            12° 27' 16.273"        123° 22' 59.992"
3                            12° 27' 16.273"        123° 23' 24.366"
4                            12° 28' 09.093"        123° 23' 24.366"
5                            12° 28' 09.088"        123° 23' 03.834"
6                            12° 28' 16.253"        123° 22' 59.974"
7                            12° 28' 29.922"        123° 22' 59.994"
8                            12° 28' 30.001"        123° 23' 30.000"
9                            12° 28' 11.953"        123° 23' 30.000"
10                          12° 28' 11.619"        123° 22' 29.346"
11                          12° 28' 10.382"        123° 23' 30.000"
12                          12° 27' 00.001"        123° 22' 59.992"

AREA = 129.7217 Hectares

SECTION V

EXPLORATION PERIOD

5.1. Timetable for Exploration - The Contractor shall commence Exploration
activities not later than three (3) months after the Effective Date for a period
of two (2) years, renewable for like periods but not to exceed a total term of
six (6) years for nonmetallic minerals and eight (8) years for metallic minerals,

6

subject to annual review and approval by the Director in accordance with the
implementing rules and regulations of the Act.

5.2. Renewal of Exploration Period - In case the Contractor opts for a renewal of
its Exploration Period, it shall file prior to the expiration thereof, a renewal
application in the Mines and Geosciences Bureau Central Office,
accompanied by the mandatory requirements stipulated in the implementing
rules and regulations of the Act, The Director may grant the renewal of the
Exploration Period on condition that the Contractor has substantially complied
with the terms and conditions of the Agreement.

In cases where further exploration is warranted beyond the six (6)- or eight
(8)-year period and on condition that the Contractor has substantially
implemented the Exploration and Environmental Work Programs as verified
by the Bureau, the Director may further grant renewal of the Exploration
Period: Provided, That the Contractor shall be required to set up a
performance surety equivalent to the expenditure requirement of the
Exploration and Environmental Work Programs.

5.3. Work Programs and Budgets - The Contractor shall strictly comply with the
approved Exploration and Environmental Work Programs together with their
corresponding Budgets (please refer to ANNEXES "C" and "D").
The amount to be spent by the Contractor in conducting Exploration activities
under the terms of this Agreement during the Exploration Period shall be in
the aggregate of not less than that specified for each of the Contract Years,
as follows:

For the Exploration Work Program:

1st Contract Year   :  PhP 1,353,000.00

2nd Contract Year :  PhP 2,277,000.00

Total                         : PhP 3,630,000.00

For the Environmental Work Program:  PhP 330,000.00

In the event of renewal of the Exploration Period, the amount to be spent
every year shall first be agreed upon by the parties.

In the event of termination of this Agreement, the Contractor shall only be
obliged to expend the pro-rata amount for the period of such Contract Year
prior to termination. If during any Contract Year, the Contractor should
expend more than the amount to be expended as provided above, the excess
may be subtracted from the amount required to be expended by the
Contractor during the succeeding Contract Years, and should the Contractor,
due to unforeseen circumstances or with the consent of the Government,
expend less during a year, then the deficiency shall be applied to the amount
to be expended during the succeeding Contract Years

5.4. Relinquishment of Total/Portion of the Contract Area - During the Exploration
Period, the Contractor may relinquish totally or partially the original Contract
Area. After the Exploration Period and prior to or upon approval of a

7

Declaration of Mining Project Feasibility by the Director, the Contractor shall
finally relinquish any portion of the Contract Area not necessary for mining
operations and not covered by any Declaration of Mining Project Project
Feasibility.

5.5. Final Mining Area - The Director may allow the Contractor to hold more than
one (1) final Mining Area subject to the maximum limits set under the
implementing rules and regulations of the Act: Provided, That each final
Mining Area shall be covered by a Declaration of Mining Feasibility.

5.6. Declaration of Mining Project Feasibility - Within the term of the Exploration
Period, the Contractor shall file in the Regional Office concerned, the
Declaration of Mining Project Feasibility of the Contract Area/final Mining
Area supported by Mining Feasibility Study, Three (3)-Year Development and
Construction or Commercial Operation Work Program, complete geologic
report, an application for survey and the pertinent Environmental Compliance
Certificate, among other applicable requirements. Failure of the Contractor to
submit the Declaration of Mining Project Feasibility during the Exploration
Period shall be considered a substantial breach of this Agreement.

5.7. Survey of the Contract Area - The Contractor shall cause the survey of the
perimeter of the Contract Area/final Mining Area through an application for
survey, complete with requirements, filed in the Regional Office concerned
simultaneous with the submission of the Declaration of Mining Project
Feasibility. Survey returns shall be submitted to the Regional Director
concerned for approval within one (1) year from receipt of the Order of
Survey complete with the mandatory requirements stated in the implementing
rules and regulations of the Act.

5.8. Reporting

a. During the Exploration Period, the Contractor shall submit to the
Director, through the Regional Director concerned, quarterly and
annual accomplishment reports under oath on all activities conducted
in the Contract Area from the Effective Date of this Agreement. The
quarterly report shall be submitted not later than fifteen (15) days at
the end of each Calendar Quarter while the annual accomplishment
report shall be submitted not later than thirty (30) days from the end of
each Calendar Year. Such information shall include detailed financial
expenditures, raw and processed geological, geochemical,
geophysical and radiometric data plotted on a map at a minimum
1:50,000 scale, copies of originals of assay results, duplicated
samples, field data, copies of originals from drilling reports, maps,
environmental work program implementation and detailed
expenditures showing discrepancies/ deviations with approved
exploration and environmental plans and budgets as well as all other
information of any kind collected during the exploration activities. All
information submitted to the Bureau shall be subject to the
confidentiality clause of this Agreement,

b. Final Report - The Contractor shall submit to the Director, through the
Regional Director concerned, a final report under oath upon the
expiration of the Exploration Period which shall be in the form and

8
substance comparable to published professional reports of
respectable international institutions and shall incorporate all the
findings in the Contract Area including location of samples, assays,
chemical analysis, and assessment of mineral potentials together with
a geologic map of 1:50,000 scale at the minimum showing the results
of the exploration. Such report shall also include detailed expenditures
incurred during the Exploration Period. In case of diamond drilling, the
Contractor shall, upon request of the Director/Regional Director
concerned, submit to the Regional Office concerned a quarter of the
core samples, which shall be deposited in the Regional Office Core
Library for safekeeping and reference.

c. Relinquishment Report - The Contractor shall submit a separate
relinquishment report with a detailed geologic report of the relinquished
area accompanied by maps at a scale of 1:50,000 and results of
analyses and detailed expenditures, among others.

SECTION VI

DEVELOPMENT AND CONSTRUCTION PERIOD

6.1. Timetable - The Contractor shall complete the development of the mine
including the construction of production facilities within thirty-six (36) months
from the submission of the Declaration of Mining Project Feasibility, subject to
such extension based on justifiable reasons as the Director may approve,
upon recommendation of the Regional Director concerned.

6.2. Reporting

a. Annual - The Contractor shall submit, within sixty (60) days after
December 31 of each year, to the Director, through the Regional
Director concerned, an annual report, which states the major activities,
achievements and detailed expenditures during the year covered,
including maps, assays, rock and mineral analyses and geological and
environmental progress reports during the Development and
Construction Period.

b. Final Report - Within six (6) months from the completion of the
development and construction activities, the Contractor shall submit a
final report to the Director, through the Regional Director concerned.
Such report shall integrate all information in maps of appropriate scale
and quality, as well as in monographs or reports in accordance with
international standards.

SECTION VII

OPERATING PERIOD

7.1. Timetable - The Contractor shall submit, within thirty (30) days before
completion of mine development and construction of production facilities, to

9

the Director, through the Regional Director concerned, a Three-Year
Commercial Operation Work Program. The Contractor shall commence
commercial utilization immediately upon approval of the aforesaid Work
Program. Failure of the Contractor to commence Commercial Production
within the period shall be considered a substantial breach of the Agreement,

7.2. Commercial Operation Work Program and Budget - During the Operating
Period, the Contractor shall submit to the Director, through the Regional
Director concerned, Work Programs and Budgets covering a period of three
(3) years each, which shall be submitted not later than thirty (30) days before
the expiration of the period covered by the previous Work Program.

The Contractor shall conduct Mining Operations and other activities for the
duration of the Operating Period in accordance with the duly approved Work
Programs and corresponding Budgets.

7.3. Expansion and Modification of Facilities - The Contractor may make
expansions, modifications, improvements, and replacements of the mining
facilities and may add new facilities as the Contractor may consider
necessary for the operations: Provided, That such plans shall be embodied in
an appropriate Work Program approved by the Director.

7.4. Reporting

a. Quarterly Reports - Beginning with the first Calendar Quarter following
the commencement of the Operating Period, the Contractor shall
submit, within thirty (30) days after the end of each Calendar Quarter,
to the Director, through the Regional Director concerned, a Quarterly
Report stating the tonnage of production in terms of ores,
concentrates, and their corresponding grades and other types of
products; value, destination of sales or exports and to whom sold;
terms of sales and expenditures.

b. Annual Reports - During the Operating Period, the Contractor shall
submit within sixty (60) days from the end of each Calendar Year, to
the Director, through the Regional Director concerned, an Annual
Report indicating in sufficient detail:

b.1. The total tonnage of ore reserves, whether proven, probable, or
inferred, the total tonnage of ores, kind by kind, broken down
between tonnage mined, tonnages transported from the
minesite and their corresponding destination, tonnages
stockpiled in the mine and elsewhere in the Philippines,
tonnages sold or committed for export (whether actually shipped
from the Philippines or not), tonnages actually shipped from the
Philippines (with full details as to purchaser, destination and
terms of sale), and if known to the Contractor, tonnages refined,
processed or manufactured in the Philippines with full
specifications as to the intermediate products, by-products or
final products and of the terms at which they were disposed;

b.2. Work accomplished and work in progress at the end of the year
in question with respect to all the installations and facilities

10
related to the utilization program, including the investment
actually made or committed; and

b.3. Profile of work force, including management and staff, stating
particularly their nationalities, and for Filipinos, their place of
origin (i.e., barangay, town, province, region).

The Contractor shall also comply with other reporting requirements provided
for in the implementing rules and regulations of the Act.

SECTION VIII

FISCAL REGIME

8.1. General Principle - The fiscal regime of this Agreement shall be governed by
the principle according to which the Government expects a reasonable return
in economic value for the utilization of non-renewable mineral resources
under its national sovereignty while the Contractor expects a reasonable
return on its investment with special account to be taken for the high risk of
exploration, the terms and conditions prevailing elsewhere in the industry and
any special efficiency to be gained by a particularly good performance of the
Contractor.

8.2. Registration Fees - Within fifteen (15) days upon receipt of the notice of
approval of the Agreement from the Regional Office concerned, the
Contractor shall cause the registration of this Agreement with the said
Regional Office and pay the registration fee at the rate provided in the
existing rules and regulations, Failure of the Contractor to cause the
registration of this Agreement within the prescribed period shall be sufficient
ground for cancellation of the same.

8.3. Occupation Fees - Prior to registration of this Agreement and at the same
date every year thereafter, the Contractor shall pay to the Municipal/City
Treasurer concerned an occupation fee over the Contract Area at the annual
rate provided in the existing rules and regulations. If the fee is not paid on
the date specified, the Contractor shall pay a surcharge of twenty five percent
(25%) of the amount due in addition to the occupation fees.

8.4. Share of the Government - The Government Share shall be the excise tax on
mineral products at the time of removal and at the rate provided for in
Republic Act No. 7729 amending Section 151 (a) of the National Internal
Revenue Code, as amended, as well as other taxes, duties and fees levied
by existing laws. The Excise Tax shall be timely and completely paid to the
nearest Bureau of Internal Revenue Office in the province.

For purposes of determining the amount of the herein Government Share, the
Contractor shall strictly comply with the auditing and accounting requirements
prescribed under existing laws and regulations.

11

The Government Share shall be allocated in accordance with Sections 290
and 292 of Republic Act No. 7160, otherwise known as "The Local
Government Code of 1991 ."

8.5. Pricing of Sales - The Contractor shall dispose of the minerals and by-
products produced at the highest market price prevailing in the locality: The
Contractor shall also pay the lowest achievable marketing commissions and
related fees and shall negotiate for more advantageous terms and conditions
subject to the right to enter into long-term sales or marketing contracts or
foreign exchange and commodity hedging contracts, which the Government
acknowledges to be acceptable notwithstanding that the sale price of the
minerals and by-products may from time to time be lower, or the terms and
conditions of sales are less favorable, than that available elsewhere. The
Contractor shall seek to strike a balance between long-term sales or
marketing contracts or foreign exchange and commodity hedging contracts
comparable to policies followed by independent producers in the international
mining industry.

The Contractor shall likewise seek a balanced distribution among consumers.
Insofar as sales to Contractor's affiliate(s) are concerned, prices shall be at
arm's length standard, and competing offers for large scale and long-term
contracts shall be procured. Before any sale and/or shipment of mineral
product is made, existing and future marketing contract(s)/sales agreement(s)
shall be submitted to the Director, copy furnished the Regional Director
concerned, for registration. At the same time, the Contractor shall regularly
inform the Director in writing of any revisions, changes or additions in said
contract(s)/agreement(s).

The Contractor shall reflect in its Monthly/Quarterly Report on Production,
Sales and Inventory of Minerals, as well as in the Integrated Annual Report,
the corresponding registration number(s) of the marketing
contract(s)/agreement(s) governing the export or sale of minerals.

8.6. Associated Minerals - If minerals other than gold, etc are discovered in
commercial quantities in the Contract Area, the value thereof shall be added
to the value of the principal mineral in computing the Government share.

SECTION IX

WORK PROGRAMS

9.1. Submission to Government - Within the periods stated herein, the Contractor
shall prepare and submit to the Director, through the Regional Director
concerned, a Work Program and corresponding Budget for the Contract Area
stating the Mining Operations and expenditures which the Contractor
proposes to carry out during the period covered with the details and
particulars set forth elsewhere in this Agreement or in the supporting
documents.

9.2. Government's Examination and Revision of Work Program - Should the
Government decide to propose a revision to a certain specific feature in the
Work Program or Budget, it shall, within thirty (30) days after receipt thereof,

12


provide a Notice to the Contractor specifying in reasonable detail its reasons
therefore. Promptly thereafter, the Government and Contractor will meet and
endeavor to agree on the revision proposed by the Government. In any
event, the revision of any portion of said Work Program or Budget in which
the Government shall fail to notify the Contractor of the proposed revision
shall, insofar as possible, be carried out as prescribed herein. If the
Government should fail within sixty (60) days from receipt thereof to notify
Contractor of the proposed revisions, the Work Program and Budget
proposed by the Contractor shall be deemed to be approved.

9.3. Contractor's Changes to Work Program - It is recognized by the Government
and the Contractor that the details of any Work Program may require
changes in the light of changing circumstances. The Contractor may make
such changes: Provided, That it shall not change the general objective of the
Work Program: Provided further, That changes which entail a negative
variance of at least twenty percent (20%) shall be subject to the approval of
the Director.

In case of any positive variance, the Contractor shall submit to the Director,
through the Regional Director concerned, a copy each of the Work Programs,
for information.

9.4. The Government's approval of a proposed Work Program and Budget will not
be unreasonably withheld.

SECTION X

ENVIRONMENTAL PROTECTION AND MINE SAFETY AND HEALTH

10.1. The Contractor shall manage its Mining Operations in a technically,
financially, socially, culturally and environmentally responsible manner to
achieve the sustainable development objectives and responsibilities as
provided for under the implementing rules and regulations of the Act.

10.2. The Contractor shall ensure that the standards of environmental protection
are met in the course of the Mining Operations. To the extent possible,
control of pollution and the transformation of the mined-out areas or materials
into economically and socially productive forms must be done simultaneously
with mining.

10.3. The Contractor shall submit an Environmental Work Program during the
Exploration Period as prescribed in the implementing rules and regulations of
the Act.

10.4. An Environmental Compliance Certificate (ECC) shall be secured first by the
Contractor prior to the conduct of any development works, construction of
production facilities and/or mine production activities in the Contract Area.

10.5. The Contractor shall submit within thirty (30) calendar days after the issuance
and receipt of the ECC, an Environmental Protection and Enhancement
Program (EPEP) using MGB Form No. 16-2 covering all areas to be affected

13


by development, utilization and processing activities under this Agreement.
The Contractor shall allocate for its initial environment-related capital
expenditures approximately ten percent (10%) of the total project cost or in
such amount depending on the environmental/geological condition, nature
and scale of operations and technology to be employed in the Contract Area.

10.6. The Contractor shall submit, within thirty (30) days prior to the beginning of
every calendar year, an Annual Environmental Protection and Enhancement
Program (AEPEP), using MGB Form 16-3, which shall be based on the
approved EPEP. The AEPEP shall be implemented during the year for which
it was submitted. To implement its AEPEP, the Contractor shall allocate
annually three to five percent (3%-5%) of its direct mining and milling costs
depending on the environmental/geologic condition, nature and scale of
operations and technology employed in the Contract Area.

10.7. The Contractor shall establish a Contingent Liability and Rehabilitation Fund
(CLRF) which shall be in the form of the Mine Rehabilitation Fund (MRF) and
the Mine Waste and Tailings Fee (MWTF).

The MRF shall be based on the financial requirements of the approved EPEP
as a reasonable environmental deposit to ensure satisfactory compliance with
the commitments/strategies of the EPEP/AEPEP and availability of funds for
the performance of the EPEP/AEPEP during the specific project phase. The
MRF shall be deposited as Trust Fund in a government depository bank and
shall be used for physical and social rehabilitation of areas affected by mining
activities and for research on the social, technical and preventive aspects of
rehabilitation.

The MWTF shall be collected based on the amounts of mine waste and mill
tailings generated during the conduct of Mining Operations. The MWTF
collected shall accrue to a Mine Waste and Tailings Reserve Fund and shall
be deposited in a government depository bank for payment of compensation
for damages caused by the Mining Operations.

10.8. The Contractor shall set up mitigating measures such as mine waste and mill
tailings disposal system, mine rehabilitation or plan, water quality monitoring,
etc. to minimize land degradation, air and water pollution, acid rock drainage
and changes in hydrogeology.

10.9. The Contractor shall set up an Environmental and Safety Office at its
minesite manned by qualified personnel to plan, implement and monitor its
approved EPEP.

10.10. The Contractor shall be responsible in the monitoring of environmental, safety
and health conditions in the Contract Area and shall strictly comply with all
the rules and regulations embodied under DAO No. 2000-98, otherwise
known as the "Mine Safety and Health Standards."

10.11. The Contractor shall be responsible for the submission of a final mine
rehabilitation and/or decommissioning plans, including its financial
requirements and incorporating the details and particulars set forth in the
implementing rules and regulations of the Act.

14

SECTION XI

RIGHTS AND OBLIGATIONS OF THE PARTIES

11.1. Obligations of the Contractor:

a. To exclusively conduct sustainable Mining Operations within the
Contract Area in accordance with the provisions of the Act and its
implementing rules and regulations;

b. To construct and operate any facilities specified under the Mineral
Agreement or approved Work Program;

c. To determine the exploration, mining and treatment process to be
utilized in the Mining Operations;

d. To extract, remove, use and dispose of any tailings as authorized by
an approved Work Program;

e. To secure all permits necessary or desirable for the purpose of Mining
Operations;

f. To keep accurate technical records about the Mining Operations, as
well as financial and marketing accounts, and make them available to
Government representatives authorized by the Director for the purpose
of assessing the performance and compliance of the Contractor with
the terms of this Agreement. Authorized representatives of other
Government Agencies may also have access to such accounts in
accordance with existing laws, rules and regulations;

g. To furnish the Bureau all the data and information gathered from the
Contract Area and that all the books of accounts and records shall be
open for inspection;

h. To allow access to Government during reasonable hours in inspecting
the Contract Area and examining pertinent records for purposes of
monitoring compliance with the terms of this Agreement;

i.To hold the Government free and harmless from all claims and
accounts of all kinds, as well as demands and actions arising out of
the accidents or injuries to persons or properties caused by Mining
Operations of the Contractor and indemnify the Government for any
expenses or costs incurred by the Government by reason of any such
claims, accounts, demands or actions;

j. In the development of the community:

j.1. To recognize and respect the rights, customs and traditions of
indigenous cultural communities over their ancestral lands and
to allocate royalty payment of not less than one percent (1%) of
the value of the gross output of minerals sold;

15


j.2. To coordinate with proper authorities in the development of the
mining community and for those living in the host and
neighboring communities through social infrastructure,
livelihood programs, education, water, electricity and medical
services. Where traditional self-sustaining income and the
community activities are identified to be present, the Contractor
shall assist in the preservation and/or enhancement of such
activities;

j.3. To allot annually a minimum of one percent (1%) of the direct
mining and milling costs necessary to implement the activities
undertaken in the development of the host and neighboring
communities. Expenses for community development may be
charged against the royalty payment of at least one percent
(1%) of the gross output intended for the concerned indigenous
cultural community;

j.4. To give preference to Filipino citizens who have established
domicile in the neighboring communities, in the hiring of
personnel for its mining operations. If necessary skills and
expertise are currently not available, the Contractor must
immediately prepare and undertake a training and recruitment
program at its expense; and

j.5. To incorporate in the Mining Feasibility Study the planned
expenditures necessary to implement (j.1) to (j.3) of this
Section;

k. In the development of Mining Technology and Geosciences:

k.1. In the course of its operations, to produce geological,
geophysical, geochemical and other types of maps and reports
that are appropriate in scale and in format and substance which
are consistent with the internationally accepted standards and
practices. Such maps shall be made available to the scientific
community in the most convenient and cost effective forms,
subject to the condition that the Contractor may delay release of
said information for a reasonable period of time which shall not
exceed three (3) years;

k.2. To systematically keep the data generated from the Contract/
Mining Area such as cores, assays and other related
information, including economic and financial data and make
them accessible to students, researchers and other persons
responsible for developing mining, geoscience and processing
technology subject to the condition that the Contractor may
delay release of data to the science and technology community
within a reasonable period of time which shall not exceed three
(3) years;

k.3. To transfer to the Government or local mining company the
appropriate technology it may adapt in the exploration,

16


development and commercial utilization of the minerals in the
Contract Area;

k.4 To allocate research and development budget for the
advancement of mining technology and geosciences in
coordination with the Bureau, research institutions, academe,
etc.; and

k.5. To replicate data, maps and reports cited in (k.1) and (k.2) and
furnish the Bureau for archiving and systematic safekeeping
which shall be made available to the science and technology
community for conducting research and undertaking other
activities which contribute to the development of mining,
geoscience and processing technology and the corresponding
national pool of manpower talents: Provided, however, that the
release of data, maps and the like shall be similarly constrained
in accordance with (k.1 ) and (k.2) above;

To incorporate in the Mining Project Feasibility Study the planned
expenditures necessary to implement all the plans and programs set
forth in this Agreement; and

m. To pay all other taxes and fees mandated by existing laws, rules and
regulations.

11.2. Rights of the Contractor:

a. To conduct Mining Operations within the confines of its
Contract/Mining Area in accordance with the terms and conditions
hereof and without interfering with the rights of other
Contractors/Lessees/Operators/ Permittees/Permit Holders;

b. Possession of the Contract Area, with full right of ingress and egress
and the right to occupy the same, subject to surface and easement
rights;

c. To use and have access to all declassified geological, geophysical,
drilling, production and other data relevant to the mining operations;

d. To sell, assign, transfer, convey or otherwise dispose of all its rights,
interests and obligations under the Agreement subject to the approval
of the Government;

e. To employ or bring into the Philippines foreign technical and
specialized personnel, including the immediate members of their
families as may be required in the operations of the Contractor, subject
to applicable laws and regulations: Provided, That if the employment
connection of such foreign persons with the Contractor ceases, the
applicable laws and regulations on immigration shall apply to them.
Every time foreign technologies are utilized and where alien executives
are employed, an effective program of training understudies shall be
undertaken. The alien employment shall be limited to technologies

17

requiring highly specialized training and experience subject to the
required approval under existing laws, rules and regulations;

f. To enjoy easement rights and use of timber, water and other natural
resources in the Contract Area subject to pertinent laws, rules and
regulations and the rights of third parties;

g. Repatriation of capital and remittance of profits, dividends and interest
on loans, subject to existing laws and Bangko Sentral ng Pilipinas
rules and regulations; and

h. To import when necessary all equipment, spare parts and raw
materials required in the operations in accordance with existing laws
and regulations.

11.3. Obligations of the Government:

a. To ensure that the Contractor has the Government's full cooperation in
the exercise of the rights granted to it under this Agreement;

b. To use its best efforts to ensure the timely issuance of necessary
permits and similar authorizing documents for use of the surface of the
Contract Area; and

c. To cooperate with the Contractor in its efforts to obtain financing
contemplated herein from banks or other financial institutions:
Provided, That such financing arrangements will in no event reduce
the Contractor's obligation on Government rights hereunder.

SECTION XII

ASSETS AND EQUIPMENT

12.1. The Contractor shall acquire for the Mining Operations only such assets that
are reasonably estimated to be required in carrying out such Mining
Operations.

12.2. All materials, equipment, plant and other installations of a movable nature
erected or placed on the Contract Area by the Contractor shall remain the
property of the Contractor. The Contractor shall have the right to remove and
re-export such materials and equipment, plant and other installations from the
Philippines, subject to existing rules and regulations. In case of cessation of
Mining Operations on public lands occasioned by its voluntary abandonment
or withdrawal, the Contractor shall have a period of one (1) year from the time
of cessation within which to remove its improvements; otherwise, all social
infrastructures and facilities shall be turned over or donated tax free to the
proper government authorities, national or local, to ensure that said
infrastructures and facilities are continuously maintained and utilized by the
host and neighboring communities.

18


SECTION XIII

EMPLOYMENT AND TRAINING OF PHILIPPINE PERSONNEL

13.1. The Contractor agrees to employ, to the extent possible, qualified Filipino
personnel in all types of mining operations for which they are qualified; and
after Commercial Production commences shall, in consultation and with
consent of the Government, prepare and undertake an extensive training
programme suitable to Filipino nationals in all levels of employment. The
objective of said programme is to reach within the timetable set forth below
the following targets of "Filipinization:"

                      Unskilled    Skilled    Clerical   Professional   Management
                      (%)               (%)          (%)           (%)                   (%)

Year 1           100             100         100          75                     75
Year 3           100             100         100          80                     70
Year 5           100             100         100          90                     90
Year 7           100             100         100          95                     95
Year 10         100             100         100          95                     95
Year 15         100             100         100          95                     95

13.2. Cost and expenses of training such Filipino personnel and the Contractor's
own employees shall be included in the Operating Expenses.

13.3. The Contractor shall not discriminate on the basis of gender and shall respect
the right of women workers to participate in policy and decision-making
processes affecting their rights and benefits.

SECTION XIV

ARBITRATION

14.1 The Government and the Contractor shall consult with each other in good
faith and shall exhaust all available remedies to settle any and all disputes or
disagreements arising out of or relating to the validity, interpretations,
enforceability, or performance of this Agreement before resorting to
arbitration as provided for in Section 14.2. below.

14.2. Any disagreement or dispute which can not be settled amicably within a
period of one (1) year from the time the issue is raised by a Party shall be
settled by a tribunal of three (3) arbitrators. This tribunal shall be constituted
as follows: one to be appointed by the Contractor and the other to be
appointed by the Secretary. The first two appointed arbitrators shall consider
names of qualified persons until agreement on a mutually acceptable
Chairman of the tribunal is selected. Such arbitration shall be initiated and
conducted pursuant to Republic Act No. 876, otherwise known as the
"Arbitration Act."

19


In any event, the arbitration shall be conducted applying the substantive laws
of the Republic of the Philippines.

14.3. Each party shall pay fifty percent (50%) of the fees and expenses of the
Arbitrators and the costs of arbitration. Each party shall pay its own costs
and attorney's fee,

SECTION XV

SUSPENSION OR TERMINATION OF CONTRACT,
TAX INCENTIVES AND CREDITS

15.1. This Agreement may be suspended for failure of the Contractor: (a) to comply
with any provision or requirement of the Act and/or its implementing rules and
regulations; (b) to pay on time the complete taxes, fees and/or other charges
demandable and due the Government.

15.2. This Agreement terminates or may be terminated for the following causes: (a)
expiration of its term, whether original or renewal; (b) withdrawal from the
Agreement by the Contractor; (c) violation by the Contractor of the
Agreement's terms and conditions; (d) failure to pay taxes, fees/or charges
or financial obligations for two (2) consecutive years; (e) false statement or
omission of facts by the Contractor; and (f) any other cause or reason
provided under the Act and its implementing rules and regulations, or any
other relevant laws and regulations.

15.3. All statements made in this Agreement shall be considered as conditions and
essential parts hereof, and any falsehood in said statements or omission of
facts which may alter, change or affect substantially the fact set forth in said
statements shall be a ground for its revocation and termination.

15.4. The Contractor may, by giving due notice at any time during the term of this
Agreement, apply for its cancellation due to causes which, in the opinion of
the Contractor, render continued mining operation no longer feasible or
viable. In this case, the Secretary shall decide on the application within thirty
(30) days from notice: Provided, That the Contractor has met all the financial,
fiscal and legal obligations.

15.5. No delay or omissions or course of dealing by the Government shall impair
any of its rights under this Agreement, except in the case of a written waiver.
The Government's right to seek recourse and relief by all other means shall
not be construed as a waiver of any succeeding or other default unless the
contrary intention is reduced in writing and signed by the party authorized to
exercise the waiver.

15.6. In case of termination, the Contractor shall pay all the fees and other
liabilities due up to the end of the year in which the termination becomes
effective. The Contractor shall immediately carry out the restoration of the
Contract Area in accordance with good mining industry practice. 

20

15.7. The withdrawal by the Contractor from the Mineral Agreement shall not
release it from any and all financial, environmental, legal and fiscal
obligations under this Agreement.

15.8. The following acts or omission, inter alia shall constitute breach of contract,
upon which the Government may exercise its right to terminate the
Agreement:

a. Failure of the Contractor without valid reason to commence
Commercial Production within the period prescribed; and/or

b. Failure of the Contractor to conduct mining operations and other
activities in accordance with the approved Work Programs and/or any
modification thereof as approved by the Director.

15.9. The Government may suspend and cancel tax incentives and credits if the
Contractor fails to abide by the terms and conditions of said incentives and
credits.

SECTION XVI

OTHER PROVISIONS

16.1. Any terms and conditions resulting from repeal or amendment of any existing
laws or regulation or from the enactment of a law, regulation or administrative
order shall be considered a part of this Agreement.

16.2, Notice

All notices, demands and other communications required or permitted
hereunder shall be made in writing, telex or telecopy and shall be deemed to
have been duly given notice, in the case of telex or telecopy, if answered
back or confirmation received, or if delivered by hand, upon receipt or ten
days after being deposited in the mail, airmail postage prepaid and
addressed as follows:

If to the Government:

THE SECRETARY
Department of Environment and Natural Resources
DENR Building, Visayas Avenue
Diliman, Quezon City

If to the Contractor:

THE PRESIDENT
Filminera Resources Corporation
3/F Corinthian Plaza Condominium Building
No. 121 Paseo de Roxas, Legaspi Village
Makati City

21


Either party may substitute or change such address on notice thereof to the
other party: Provided, That the Contractor shall, in case of any change of
address during the term of this Agreement, notify the Director in writing.
Failure to do such notification shall be deemed as waiver by the Contractor to
be informed about any communications as provided in Section 16.2 above.

16.3. Governing Law

This Agreement and the relation between the parties hereto shall be
governed by and construed in accordance with the laws of the Republic of the
Philippines. The Contractor hereby agrees and obliges itself to comply with
the provisions of the Act, its implementing rules and regulations and other
relevant laws and regulations.

16.4. Suspension of Obligation
a. Any failure or delay on the part of any party in the performance of its
obligation or duties hereunder shall be excused to the extent
attributable to Force Majeure as defined in the Act: Provided, That the
suspension of Mining Operations due to Force Majeure causes shall
be subject to approval by the Director.

b. If Mining Operations are delayed, curtailed or prevented by such Force
Majeure causes, then the time for enjoying the rights and carrying out
the obligations thereby affected, the term of this Agreement and all
rights and obligations hereunder shall be extended for a period equal
to the period involved.

c. The Party, whose ability to perform its obligations is affected by such
Force Majeure causes, shall promptly give Notice to the other in writing
of any such delay or failure of performance, the expected duration
thereof and its anticipated effect and shall use its efforts to remedy
such delay, except that neither Party shall be under any obligation to
settle a labor dispute: Provided, That the suspension of obligation by
the Contractor shall be subject to prior approval by the Director.

16.5. Amendments

This Agreement shall not be annulled, amended or modified in any respect
except by mutual consent in writing of the herein parties.

22




IN WITNESS WHEREOF, the Parties hereto have executed this Agreement, as of
the day and year first above written

THE REPUBLIC OF THE PHILIPPINES

BY:

ANGELO T. REYES
Secretary
Department of Environment and Natural Resources

FILMINERA RESOURCES CORPORATION

TIN: 153-880-000


BY:

ROLANDO Q. AMORES
President

SIGNED IN THE PRESENCE OF:

(Signature over Printed Name)

(Signature over Printed Name

23

ACKNOWLEDGMENT

Republic of the Philippines )
Quezon City )SS

Before me, a Notary Public for and in the City of Quezon, personally appeared
ANGELO T. REYES, with Community Tax Certificate No. 15154888 issued
on January 18, 2007 at TAGUIG CITY, in his capacity as Secretary of the
 Department of Environment and Natural Resources, and ROLANDO Q. AMORES
with Community Tax Certificate No. 151-163-43  issued on
January 16, 2007 at MAKATI CITY, in his capacity as President of Filminera 
Resources Corporation, both known to me and to me known to be the same
persons who executed the foregoing instrument consisting of twenty-four (24)
pages, including this acknowledgment page, and acknowledged to me that the same
is their voluntary acts and deeds.

IN WITNESS WHEREOF, I have hereunto set my hand and affix my notarial seal,
this JUL 31 2007 day of ________________.

Doc. No. 76
Page No. 16
Book No. VIII
Series of 2007