PRODUCTION SHARING CONTRACT

FOR

EXPLOITATION OF COALBED METHANE

RESOURCES IN ZIJINSHAN AREA, SHANXI

PROVINCE,

THE PEOPLE’S REPUBLIC OF CHINA

CHINA UNITED COALBED METHANE CORP. LTD.

AND

PACIFIC ASIA PETROLEUM LTD.

October, 2007

BEIJING, CHINA

1



Contents



Article 1

Article 2

Article 3

Article 4

Article 5

Article 6

Article 7

Article 8

Article 9

Article 10

Article 11

Article 12

Article 13

Article 14

Article 15

Article 16

Article 17

Article 18

Article 19

Article 20

Article 21

Article 22

Article 23

Article 24

Article 25

Article 26



Preamble

Definitions

Objective of the Contract

Contract Area

Contract Term

Relinquishment of Contract Area

Minimum Exploration Work Commitment and Expected Minimum Exploration Expenditures

Management Organization and Its Functions

Operator

Assistance Provided by CUCBM

Work Program and Budget

Determination of Commerciality of CBM

Financing and Cost Recovery

CBM Production and Allocation

Quality, Quantity, Price, and Destination of CBM

Preference for the Employment of Chinese Personnel, Goods and Services

Training of Chinese Personnel and Transfer of Technology

Ownership of Assets and Data

Accounting, Auditing and Personnel Costs



1

2

7

7

8

10

11

13

18

22

23

25

27

29

33

37

38

40

41



Taxation

Insurance

Confidentiality

Assignment

Health, Safety and Environmental Protection

Force Majeure

Consultation and Arbitration

Effectiveness and Termination of the Contract



43

43

45

47

48

49

50

51

2



Contents



Article 27 The Applicable Law

Article 28 Language of the Contract and Working Language

Article 29 Miscellaneous

Annex I

Annex II

Annex III

Annex IV



53

53

54



Geographical Location and Coordinates of Connecting Points of the Boundary Lines of the Contract Area

Accounting Procedure

Personnel Costs

Data Control

3



I-1

II-1

III-1

IV-1



Preamble

This Contract is entered into in Beijing on this 26th day of October, 2007 by and between China United CBM Corporation Ltd.

(hereafter abbreviated as “CUCBM”), a company organized and existing under the laws of the People’s Republic of China, having

its headquarters domiciled in Beijing, the People’s Republic of China as one part; and Pacific Asia Petroleum Ltd., a company

organized and existing under the laws of Hong Kong, having its headquarters domiciled in Hong Kong (hereinafter referred to as

the “Foreign Contractor” or “Contractor”) as the other part.

WITNESSETH

WHEREAS, all Coalbed Methane resources under the territory and internal waters of the People’s Republic of China and within

the limits of national jurisdiction of the People’s Republic of China are owned by the People’s Republic of China; and

WHEREAS, CUCBM shall be responsible for business matters in respect of the exploitation of Coalbed Methane resources in

cooperation with foreign enterprises, and for negotiating, entering into and implementing contracts for the exploitation of Coalbed

Methane resources in cooperation with foreign enterprises and to have the exclusive right to explore for, develop and produce the

Coalbed Methane in cooperation with foreign enterprises in areas approved by the State Council for exploitation of Coalbed

Methane resources in cooperation with foreign enterprises and the exclusive authority to enter into this Contract as authorized by

the State Council of the People’s Republic of China; and

WHEREAS, the Foreign Contractor desires and agrees to provide funds, and apply its appropriate and advanced technology and

managerial experience to cooperate with CUCBM for the exploitation of Coalbed Methane resources within the Contract Area and

agrees to be subject to the laws, decrees, and other rules and regulations of the People’s Republic of China in the implementation

of the Contract.

NOW, THEREFORE, IT IS MUTUALLY AGREED as hereafter set forth:

1



Article 1

Definitions

The following words and terms used in the Contract shall have, unless otherwise specified herein, the following meanings:

1.1 “Coalbed Methane” or “CBM” means any gas mainly consisting of methane stored in coal seams and/or adjacent strata

(including in the overlying and underlying strata) within the Contract Area.

1.2 “Coalbed Methane Products” or “CBM Products” means any or all of Coalbed Methane, methanol, electricity generated by a

coalbed methane-fired generation facility, and other Coalbed Methane derivatives or products.

1.3 “Coalbed Methane Discovery” or “CBM Discovery” means a potential Coalbed Methane reservoir worth further evaluation

proved by exploration within the Contract Area.

1.4 “Coalbed Methane Field” or “CBM Field” means an accumulation of Coalbed Methane or otherwise within the Contract Area

which has been determined to be of commercial value and for which it has been decided to proceed with development. The

accumulation may be bounded by but is not limited to geologic structure, fault blocks, coal discontinuities or topographical

features. Fields may also be designated as areas of similar geologic characteristics including but not limited to coal thickness,

drill depths, and gas content.

1.5 “Petroleum” means Crude Oil and Natural Gas deposited in the subsurface and being extracted or already extracted, including

any valuable non-hydrocarbon substances produced in association with Crude Oil and/or Natural Gas separated or extracted

therefrom.

1.6 “Coalbed Methane Operations” or “CBM Operations” means the Exploration Operations, the Development Operations, the

Production Operations, and other activities related to these Operations carried out under the Contract.

1.7 “Liquid Hydrocarbons” means any liquid hydrocarbons extracted from CBM.

1.8 “Exploration Operations” means operations carried out for the purpose of discovering and evaluating CBM bearing areas by

means of geological, geophysical, geochemical and other methods including exploratory well drilling; all the work

undertaken to determine the commerciality of areas in which CBM has been discovered including core drilling, modeling,

area selection, feasibility studies, Pilot Development (including production therefrom), formulation of the Overall

Development Program; and activities related to all such operations including negotiation and execution of longterm

transportation and sales contracts.

1.9 “Development Operations” means operations carried out for the realization of

2



CBM production from the date of approval of the Overall Development Program for any CBM Field, including planning,

design, construction, installation, drilling, developing transportation systems, and the related research work as well as

production activities, carried out before the Date of Commencement of Commercial Production.

1.10 “Production Operations” means operations and all activities related thereto carried out for CBM production of each CBM

Field from the Date of Commencement of Commercial Production, including, but not limited to extraction, injection,

stimulation, treatment, storage, transportation and lifting, etc.

1.11 “Contract Area “ means a surface area demarcated with geographic coordinates for the cooperative exploitation of CBM

resources, and in the Contract, means the surface area stipulated in Article 3.1 hereof.

1.12 “Exploration Area” means the surface area within the Contract Area which has not been relinquished before the expiration of

the exploration period hereof and in which Development Operations and Production Operations have not begun.

1.13 “Development Area” means a portion of the Contract Area covering a CBM Field which has been designated for

development. The Development Area(s) shall be proposed by the Operator, demarcated by the Joint Management Committee

(“JMC”) and delineated as such in the Overall Development Program submitted for approval and approved by the

Department Designated by the State Council.

1.14 “Production Area” means a surface area within any Development Area for the purpose of the performance of the Production

Operations within the said Development Area. The Production Area proposed by the Operator, demarcated by JMC shall be

submitted to CUCBM for consent before the Date of Commencement of Commercial Production.

1.15 “Date of Commencement of Commercial Production” means the date of commencement of the production of CBM from any

CBM Field proposed and announced by JMC in accordance with the provisions in Article 7.2.5 hereof.

1.16 “Calendar Year” means a period of twelve (12) consecutive Gregorian months under the Gregorian Calendar, beginning on

the first day of January and ending on the thirty-first day of December in the same year.

1.17 “Contract Year” means a period of twelve (12) consecutive Gregorian months under the Gregorian Calendar, within the term

of the Contract, beginning on the Date of Commencement of the Implementation of the Contract or any anniversary thereof.

1.18 “Production Year” means in respect of each CBM Field, a period of twelve (12) consecutive Gregorian months under the

Gregorian Calendar, beginning

3



on the Date of Commencement of Commercial Production of such CBM Field or any anniversary thereof.

1.19 “Calendar Quarter” means a period of three (3) consecutive Gregorian months under the Gregorian Calendar, beginning on

the first day of January, the first day of April, the first day of July, or the first day of October.

1.20 “Exploratory Well” means any well drilled within the Contract Area during the exploration period for the purpose of

searching for CBM accumulations, including wells drilled for the purpose of obtaining geological and geophysical

parameters, any dry hole(s) and discovery well(s).

1.21 “Pilot Development” means the installation and operation of necessary equipment within the Contract Area (including wells)

aiming at evaluating, through pilot production of Coalbed Methane, the potential commercial value of the Coalbed Methane

in a specific area.

1.22 “Development Well” means a well drilled after the date of approval of the Overall Development Program for CBM Field for

the purpose of producing CBM, increasing production or accelerating extraction of CBM, including production wells,

injection wells and dry holes.

1.23 “Work Program” means all types of plans formulated for the performance of the CBM Operations, including but not limited

to plans for exploration, development, production, transportation and sales.

1.24 “Overall Development Program” means a plan prepared by the Operator for the development of a CBM Field or part of a

CBM Field (phased development) which has been reviewed and adopted by JMC, confirmed by CUCBM and approved by

the Department Designated by the State Council, and such plan shall include, but not be limited to, recoverable reserves, the

Development Well pattern, master design, production profile, economic analysis and time schedule of the Development

Operations.

1.25 “Deemed Interest” means interest accruing on the development costs calculated in accordance with the rate of interest

stipulated in Article 12.2.3.2 hereof when the development costs incurred in each CBM Field within the Contract Area are

recovered by the Parties.

1.26 “CBM Field Straddling a Boundary” means a CBM Field extending from the Contract Area to one or more other contract

areas and/or areas in respect of which no CBM contracts have been signed.

1.27 “Annual Gross Production of CBM” means the total amount of CBM produced from each CBM Field within the Contract

Area considered separately in each Calendar Year, less the amount of CBM used for CBM Operations in such CBM Field

within the Contract Area and the amount of losses, which is saved and measured by a measuring device at the Delivery Point

as specified in Article 14.3.1 hereof.

4



1.28 “Annual Gross Production of Liquid Hydrocarbons” means the total amount of Liquid Hydrocarbons produced from each

CBM Field within the Contract Area considered separately in each Calendar Year, less the amount of Liquid Hydrocarbons

used for CBM Operations in such CBM Field within the Contract Area and the amount of losses, which is saved and

measured by a measuring device at the Delivery Point as specified in Article 14.3.1 hereof.

1.29 “Basement” means igneous rocks, metamorphic rocks or rocks of such nature which, or formations below which, could not

contain CBM deposits in accordance with the knowledge generally accepted in the international Coalbed Methane industry

circle and shall also include such impenetrable rock substances as salt domes, mud domes and any other rocks which make

further drilling impracticable or economically unjustifiable by the modern drilling technology normally utilized in the

international Coalbed Methane industry.

1.30 “Contractor” means the Foreign Contractor specified in the Preamble hereto, including assignee(s) in accordance with

Article 22 hereof.

1.31 “Parties” means CUCBM and the Contractor.

1.32 “Party” means either of the Parties.

1.33 “Operator” means the entity responsible for the performance of the CBM Operations under the Contract.

1.34 “Subcontractor” means an entity which provides the Operator with goods or services for the purpose of the Contract.

1.35 “Third Party” means any individual or entity except CUCBM, the Contractor and any of their Affiliates.

1.36 “Chinese Personnel” means any citizen of the People’s Republic of China, including CUCBM’s personnel and Chinese

citizens employed by the Contractor and/or the Subcontractor(s), involved in Coalbed Methane Operations under the

Contract.

1.37 “Expatriate Employee” means any person employed by the Contractor, Subcontractor(s), or CUCBM who is not a citizen of

the People’s Republic of China. Overseas Chinese who reside abroad and have the nationality of the People’s Republic of

China and other Chinese abroad, when they are employed by the Contractor, Subcontractor(s) or CUCBM, shall also be

deemed to be Expatriate Employees within the scope of the Contract.

1.38 “Affiliate” means in respect of the Contractor:

(a) any entity in which any company comprising Contractor directly or indirectly holds fifty percent (50%) or more of the

voting rights carried by its share capital; or

5



(b) any entity which directly or indirectly holds fifty percent (50%) or more of the aforesaid voting rights of any company

comprising the Contractor; or

(c) any other entity whose aforesaid voting rights are held by an entity mentioned in (b) above in an amount of fifty percent

(50%) or more;

“Affiliate” means, in respect of CUCBM, any subsidiary, branch, or regional corporation of CUCBM and any entity in

which CUCBM directly or indirectly holds fifty percent (50%) or more of the voting rights carried by its share capital.

1.39 “Delivery Point” means a point or points agreed upon by the Parties for the delivery of CBM or Liquid Hydrocarbon located

within or outside the Contract Area and specified in the Overall Development Program.

1.40 “Department Designated by the State Council” means the department which is designated by the State Council of the

People’s Republic of China to be responsible for administration of the Coalbed Methane industry of the People’s Republic of

China.

1.41 “Date of Commencement of the Implementation of the Contract” means the first day of the month following the month in

which the Contractor has received notification from CUCBM of the approval of the Contract by the Ministry of Commerce

of the People’s Republic of China.

6



Article 2

Objective of the Contract

2.1 The objective of the Contract is to explore for, develop, produce and sell Coalbed Methane, Liquid Hydrocarbons or Coalbed

Methane products that may exist in the Contract Area.

2.2 The Contractor shall apply its appropriate and advanced technology and assign its competent experts to perform the Coalbed

Methane Operations.

2.3 During the performance of the CBM Operations, the Contractor shall, as far as practicable and appropriate, transfer its

technology used in CBM Operations hereunder to allow the CUCBM Personnel to utilize said technology and to train such

personnel in accordance with Article 16 hereof.

2.4 The Contractor shall bear all the exploration costs required for the Exploration Operations. In the event that any CBM Field is

discovered within the Contract Area, the development costs of such CBM Field shall be borne by the Parties in proportion to

their participating interests: forty percent (40 %) by CUCBM and sixty percent (60 %) by the Contractor. In the event that

CUCBM opts to participate at a level less than forty percent (40 %) of the participating interests, or not to participate in the

development of the CBM Field, the Contractor shall bear the remaining development costs necessary for the development of

the CBM Field in accordance with Article 12.1.2 hereof.

The Parties may determine through consultations their respective proportion of participating interests when they sign this

Contract, or reach the agreement on the development of the said CBM Field in accordance with Article 11.6 hereof.

2.5 If any CBM Field is discovered within the Contract Area, the CBM and/or Liquid Hydrocarbons produced therefrom shall be

allocated in accordance with Articles 12 and 13 hereof.

2.6 Nothing contained in the Contract shall be deemed to confer any right on the Contractor other than those rights expressly

granted hereunder.

Article 3

Contract Area

3.1 The Contract Area as of the date of signature of the Contract covers a total area of seven hundred and eight point zero seven

six (___708.076___) square kilometers, as marked out by the geographic location and the coordinates of the connecting

points of the boundary lines shown on Annex I attached hereto.

The said total area of the Contract Area shall be reduced in accordance with Articles 4, 5 and 11 hereof.

7



3.2 Except for the rights as expressly provided by the Contract, no right is granted in favor of the Contractor to the surface area,

subsurface area, lake bed, stream bed, subsoil and any bodies of water or any natural resources or aquatic resources other than

CBM, CBM Products and Liquid Hydrocarbons, existing therein and any things under the surface within the Contract Area.

Article 4

Contract Term

4.1 The term of the Contract shall include an exploration period, a development period and a production period.

4.2 The exploration period, beginning on the Date of Commencement of the Implementation of the Contract, shall be divided into

two (2) phases and shall consist of five (5) consecutive Contract Years, unless the Contract is sooner terminated, or the

exploration period is extended in accordance with Article 24 hereof and Article 4.3 herein. The two (2) phases shall be as

follows:

the first phase of three (3 ) Contract Year (the first Contract Year through the third Contract Year) for core testing;

the second phase of two (2) Contract Years (the fourth Contract Year through the fifth Contract Year) for Pilot Development.

4.3 When time is insufficient to complete the Pilot Development work on a CBM discovery made shortly before the expiration of

the exploration period or when the time of the Pilot Development work on a CBM discovery in accordance with the Pilot

Development Work Program approved by JMC as stated in Article 11 hereof extends beyond the exploration period and/or

where there is no transportation or market access or consuming facilities and/or the Parties have not completed longterm

transportation and sales agreements in respect of the CBM, CBM Products or Liquid Hydrocarbons, subject to CUCBM’s

consent, the exploration period as described in Article 4.2 herein shall be extended. The extension of the exploration period

shall be approved by the Ministry of Commerce (MOFCOM) of the People’s Republic of China submitted through CUCBM

and which shall be a reasonable period of time required to complete the above-mentioned work and for transportation and

market access and consuming facilities to develop and for the Parties to negotiate longterm transportation and sales

agreements in respect of the CBM, CBM Products and Liquid Hydrocarbons in order to enable JMC to make a decision on

the commerciality of the said CBM discovery in accordance with Article 11 hereof and submits an acceptable Overall

Development Program to the Department Designated by the State Council, and until the Department Designated by the State

Council makes its final decision on the Overall Development Program. The period of extension shall be no more than two

(2) years.

8



4.4



The development period of any CBM Field within the Contract Area shall begin on the date of approval of the Overall

Development Program of the said CBM Field, and end on the date of the entire completion of the Development Operations

set forth in the Overall Development Program (which may continue beyond the Date of Commencement of Commercial

Production), excluding the time for carrying out other additional development projects during the production period in

accordance with Article 11.10 hereof.



4.5



The production period of any CBM Field within the Contract Area shall be a period beginning on the Date of

Commencement of commercial production of the said CBM Field up to the Date of the expiration of the production period

as specified in the Overall Development Program approved. However, the period shall not go beyond twenty(20)

Consecutive Production Years beginning on the Date of Commencement of Commercial Production of the said CBM Field,

unless otherwise provided in Article 4.6 herein and Article 24 hereof. Under such circumstances as where the construction

of an CBM Field is to be conducted on a large scale, and the time span required therefore is long, or where separate

production of each of the multiple CBM producing zones of an CBM Field is required, or under other special circumstances,

the production period thereof shall, when it is necessary, be properly extended with the approval of the Department

Designated by the State Council.



4.6



Suspension or abandonment of production of a CBM Field.



4.6.1 Suspension of production from a CBM Field within the production period

In the event that the Parties agree to suspend temporarily production from a CBM Field which has entered into commercial

production, the Production Area covered by the CBM Field shall be retained within the Contract Area. In no event, shall the

period of such retention extend beyond the date of the expiration of the production period of that CBM Field. The duration

of the relevant period of production suspension and the arrangement for the maintenance operations during the aforesaid

period of suspension shall be proposed by the Operator, and shall be decided by JMC through discussion. However, the

aforesaid period of suspension shall be less than two years, unless otherwise agreed by the Parties. In the event that the

Parties fail to reach an agreement on the restoration of production by the expiration of the production suspension period

decided by JMC through discussion, the Party who wishes to restore production shall have the right to restore production

solely. The other Party may later elect to participate in production by paying to the other party its participating interest share

of the costs incurred in restoring such production, but shall have no rights or obligations in respect of such CBM Field for

the production during such solely restored production period.

In any event, the obligation for abandonment and site restoration shall rest solely with the Party(s) which participate in the

restored production; which shall indemnify and hold harmless any other non-participating Party from any costs, expenses or

claims arising out of such obligation.

9



4.6.2



Abandonment of production from a CBM Field within the production period.



4.6.2.1 During the production period, either Party to the Contract may propose to abandon production from any CBM Field within

the Contract Area, provided, however, that prior written notice shall be given to the other Party to the Contract. The other

Party shall make a response in writing within ninety (90) days from the date on which the said notice is received. If the

other Party also agrees to abandon production from the said CBM Field, then abandonment costs shall be paid by the

Parties in proportion to their participating interests in such CBM Field. The Parties shall abandon such CBM Field in

accordance with procedure agreed on by the Parties. From the date on which the abandonment is completed, the

production period of such CBM Field shall be terminated and such CBM Field shall be excluded from the Contract Area.

4.6.2.2 If the Contractor notifies CUCBM in writing of its decision to abandon production from a CBM Field, while CUCBM

decides not to abandon production from such CBM Field, then from the date on which the Contractor receives CUCBM’s

written response of its aforesaid decision, namely Abandonment Date, all of the Contractor’s rights and obligations under

the Contract in respect of the said CBM Field, including, but not limited to, any obligation with respect to abandonment

and site restoration in respect of such CBM Field shall be transferred to CUCBM and terminated automatically with

respect to Contractor, provided that the Contractor shall not transfer to CUCBM any of the Contractor’s debts, existing

liabilities and obligations in respect of the said CBM Field. In addition, the Contractor shall undertake its existing

liabilities and obligations under the Contract prior to the Abandonment Date. From the Abandonment Date, the said CBM

Field shall be excluded from the Contract Area and CUCBM shall indemnify and hold Contractor harmless from any

expenses, claims or liabilities arising out of any such rights or obligations transferred to CUCBM pursuant to this

Article 4.6.2.2.

4.7



The term of the Contract shall not go beyond thirty (30) consecutive Contract Years from the Date of Commencement of

the Implementation of the Contract, unless otherwise stipulated hereunder.



Article 5

Relinquishment of the Contract Area

5.1



The Contractor shall relinquish a portion or portions of the Contract Area in accordance with the following provisions:



5.1.1



In any of the following cases, the Contractor shall relinquish the remaining Contract Area, except for any Development

Area, proposed Development Area and/or Production Area:

10



(a) at the expiration of the last phase of the exploration period (including extensions) as mentioned in Article 4.2 hereof; or

(b) at the expiration of the said exploration phase if the Contractor exercises its option under Article 6.3 (b) of the Contract;

or

(c) at the expiration of the extended period, in the event that the exploration period is extended in accordance with the first

paragraph of Article 4.3 or Article 24 hereof.

5.1.2 In the execution of Articles 5.1.1 herein, a Production Area and/or Development Area or an area proposed by Contractor

corresponding to a CBM Discovery with a possibility of or potential for Pilot Development or awaiting Pilot Development

and/or under a Pilot Development or included in an Overall Development Program awaiting approval, shall not be regarded

as an area to be relinquished.

5.1.3 At the expiration of its production period of any CBM Field as specified in Article 4.5 hereof, such CBM Field within the

Contract Area shall be excluded from the Contract Area.

5.2



Within ninety (90) days prior to the date of relinquishment of the Contract Area, the Contractor shall submit to CUCBM a

report on its completed Exploration Operations on the areas proposed to be relinquished, including a map showing the

proposed areas to be relinquished with the geographic location and the coordinates of the connecting points of the boundary

lines.



5.3



In the exploration period, the Contractor shall bear the fee for CBM exploration right of the Contract Area paid in

accordance with the relevant laws and regulations of the People’s Republic of China. In the development period, CUCBM

and the Contractor shall, in proportion to their respective participating interests, bear the fee for CBM mining right of the

Development Area paid in accordance with relevant laws and regulations of the People’s Republic of China. Herein socalled the fees for CBM exploration and mining rights shall be paid pursuant to Article 5.2.20 of Annex II hereof.



Article 6

Minimum Exploration Work Commitment

and Expected Minimum Exploration Expenditures

6.1 The Contractor shall begin to perform the Exploration Operations within six (6) months after the Date of Commencement of

the Implementation of the Contract, unless otherwise agreed upon by the Parties.

6.2 The Contractor shall fulfill the minimum exploration work commitment and expected minimum exploration expenditures for

each Calendar Year of each

11



phase of the exploration period in accordance with the regulations of relevant government departments and the provisions of

this Contract:

6.2.1 During the first phase of the exploration period, the Contractor shall:

(a) carry out a minimum 50 km of 2-D seismic data acquisition and drill three ( 3) Exploration Wells; and

(b) spend two million eight hundred thousand ($2,800,000) U.S. dollars as its expected minimum exploration expenditures

for such Exploration Operations.

6.2.2 During the second phase of the exploration period, the Contractor shall:

(a) drill four (4) Pilot Development wells; and

(b) spend two million ($2,000,000) U.S. dollars as its expected minimum exploration expenditures for such Exploration

Operations.

6.2.3 With respect to the minimum exploration work commitment for each phase of the exploration period committed by the

Contractor in accordance with Articles 6.2.1 and 6.2.2 herein, when calculating whether the minimum exploration work

commitment has been fulfilled, the number of Exploration Wells and Pilot Development Wells shall be the basis of such

calculation.

6.3



At the expiration of the first phase of the exploration period, the Contractor has options (a) or (c) and at the expiration of the

second phase of the exploration period options (b) or (c) as follows:

(a) to enter the next phase and continue exploration, provided that the Contractor has fulfilled all its minimum exploration

work commitment and minimum exploration expenditures during the first phase; or

(b) to conduct Development Operations and Production Operations only on any CBM discoveries in accordance with the

procedures under Article 11 hereof provided, however, that the minimum exploration work commitments up to the date

of such expiration of the said exploration phase have been fulfilled and the areas specified in Article 5 hereof have been

relinquished; or

(c) to terminate the Contract.



6.4 At the end of any year of any phase of the exploration period, if the actual exploration work and/or expenditures fulfilled by

the Contractor is less than the minimum exploration work commitment and/or expenditures set forth for the said year as a

result of force majeures such as natural disasters etc., the Contractor shall give reasons to CUCBM for the under fulfillment.

With the consent of relevant government departments, the unfulfilled balance of the said year shall be added to the minimum

exploration work commitment and/or expenditures for the next exploration year.

12



6.5 Where the Contractor has fulfilled ahead of time the minimum exploration work commitment for any phase of the exploration

period, the duration of such exploration phase stipulated in Article 4.2 hereof shall not be shortened thereby, and if the

exploration expenditures actually incurred by the Contractor exceeds the minimum exploration expenditures for the said year

of the said exploration phase, the excess part shall be only deducted from and credited against the minimum exploration

expenditures for the next year.

6.6 At the expiration of any phase during the exploration period, if the exploration work actually fulfilled by the Contractor is

less than the minimum exploration work commitment for such phase, and if the Contractor opts to terminate the Contract

under Article 6.3 (c) herein, or if the said phase is the last exploration phase, the Contractor shall, within thirty (30) days from

the date of the decision of its election to terminate the Contract or within thirty (30) days from the date of the expiration of

the exploration period, pay CUCBM only any unfulfilled balance of the minimum exploration work commitment in U.S.

dollars after it has been converted into a cash equivalent using the method provided in Annex II-Accounting Procedure

hereto.

Article 7

Management Organization and Its Functions

7.1



For the purpose of the proper performance of the CBM Field, the Parties shall establish a Joint Management Committee

(JMC) within forty-five (45) days from the Date of Commencement of the Implementation of the Contract.



7.1.1 CUCBM and the Contractor shall each have the right to appoint an equal number of representatives (two to five) to form

JMC, and each Party to the Contract shall designate one of its representatives as its chief representative. The representative

of the Operator of the companies comprising the Contractor shall be the chief representative of the Contractor. Either Party

may replace any of its representatives, or designate another representative as its chief representative, by a written notice to

the other Party, pursuant to Article 29.2 hereof. All the aforesaid representatives shall have the right to present their views

on the proposals at the meetings held by JMC. When a decision is to be made on any proposal, the chief representative from

each Party to the Contract shall be the spokesman on behalf of the Party to the Contract.

The chairman of JMC shall be the chief representative designated by CUCBM, and the vice chairman shall be the chief

representative designated by the Contractor. The chairman of JMC shall preside over meetings of JMC. In his absence, one

representative present at the meeting from CUCBM shall be designated to act as the chairman of the meeting. In the absence

of the vice chairman of JMC, one representative present at the meeting from the Contractor shall be designated to act as the

vice chairman of the meeting. The

13



Parties may, according to need, designate a reasonable number of advisers who may attend, but shall not be entitled to vote at

JMC meetings.

7.1.2 A regular meeting of JMC shall be held at least once a Calendar Quarter, and other meetings, if necessary, may be held at

any time at the request of any Party to the Contract, upon giving reasonable notice to the other Party of the date, time and

location of the meeting and the items to be discussed.

7.2



The Parties shall empower JMC to:



7.2.1 Review and adopt the Work Programs and budgets proposed by the Operator and subsequent amendments thereto;

7.2.2 Determine the potential commerciality of each Coalbed Methane Discovery that has been made in accordance with the

Operator’s Pilot Development report and report its decision to CUCBM for confirmation;

7.2.3 Review and adopt the Overall Development Program and budget for each CBM Field and the amendments to the budget;

7.2.4 Approve or confirm the following items of procurement and expenditures:

(a) approve procurement of any item within the budget with a unit price exceeding Two Hundred Thousand U.S. dollars

(U.S. $200,000) and any single purchase order of total monetary value exceeding Six Hundred Thousand U.S. dollars

(U.S. $600,000 );

(b) approve a lease of equipment, or an engineering subcontract or a service contract within the budget of a monetary value

exceeding Three Hundred Thousand U.S. dollars (U.S. $300,000 ); and

(c) confirm excess expenditures pursuant to Article 10.2.1 hereof and the expenditures pursuant to Article 10.2.2 hereof;

7.2.5 Propose and announce the Date of Commencement of Commercial Production of each CBM Field within the Contract Area;

7.2.6 Determine the type and scope of information and data provided to any Third Party in accordance with Article 21.5 hereof;

7.2.7 Demarcate boundaries of the Development Area and the Production Area of each CBM Field;

7.2.8 Review and approve the Joint Operating Agreement in accordance with Article 8.8 hereof;

7.2.9 Review and approve the insurance program proposed by the Operator and emergency procedures on safety and

environmental protection;

14



7.2.10 Review and approve personnel training programs;

7.2.11 Review and approve minutes and/or resolutions of JMC meetings, and discuss, review, decide and approve other matters

that have been proposed by either Party to the Contract or submitted by the expert groups pursuant to Article 7.4.2 hereof

or by the Operator; and

7.2.12 Review and examine matters required to be submitted to relevant authorities of the Chinese Government and/or CUCBM

for approval, consent or confirmation.

7.3



Decisions of JMC shall be made unanimously through consultation. All decisions made unanimously shall be deemed as

formal decisions and shall be equally binding upon the Parties. When matters upon which agreement cannot be reached

arise, the Parties may convene another meeting in an attempt to find a new solution thereto based on the principle of

mutual benefit.



7.3.1



During the exploration period, the Parties shall endeavor to reach agreement through consultation on exploration programs

and annual exploration Work Programs. If the Parties fail to reach agreement through consultation, the Contractor’s

proposal shall prevail, provided that such proposal is not in conflict with the relevant provisions in Articles 4, 5 and 6

hereof.



7.3.2



If it is considered by the chairman and/or the vice chairman or their nominees that a matter requires urgent handling or may

be decided without convening a meeting, JMC may make decisions through facsimiles or the circulation of documents.



7.4



JMC shall establish the following subordinate bodies:



7.4.1



Secretariat

The secretariat shall be a permanent organization consisting of two (2) secretaries. One secretary shall be appointed by

each of the Parties. The secretaries shall not be members of JMC, but may attend meetings of JMC as observers. The duties

of the secretariat are as follows:

(a) to keep minutes of meetings;

(b) to prepare summaries of the resolutions for JMC meetings;

(c) to draft and transmit notices of meetings; and

(d) to receive and transmit proposals, reports or plans submitted by the Operator and/or proposed by any Party to the

Contract, that require discussion, review or approval by JMC.



7.4.2



Expert Groups

15



Advisory expert groups shall be established in accordance with the

requirements of the Coalbed Methane Operations in various periods. Each expert group shall consist of an equal number of

CUCBM Personnel and the Contractor’s employees, and, with the agreement of JMC, any other personnel. JMC shall discuss

and decide upon their establishment or dissolution, size, tasks, location of their work and the appointment of their leaders in

accordance with the requirements of their work. The expert groups which should be of a reasonable size and number shall

have the following functions:

(a) to discuss and study matters assigned to them by JMC and submitted by the Operator to JMC for its review and approval

and any other matter assigned to them by JMC and to make constructive suggestions to JMC;

(b) to have access to and observe and investigate the Coalbed Methane Operations conducted by the Operator without

affecting such Operations at its office and operating sites as work requires and to submit relevant reports to JMC; and

(c) to attend meetings of JMC as observers at the request of JMC.

7.5



When one of the companies comprising the Contractor acts as the Operator, CUCBM shall have the right to assign

professional representatives for the CBM Operations. The Operator’s staff shall regularly discuss their work with the

professional representatives of CUCBM.

The professional representatives shall have access to the centers of research, design, and data processing related only to the

execution of the Contract and to the operating sites to observe all the activities and study all the information with respect to

the CBM Operations. Whether to provide such access to the aforesaid centers outside the People’s Republic of China shall

be decided by JMC through discussion. If the decision is made, such access shall be arranged by the Operator and the

Operator shall use all reasonable endeavors to assist the professional representatives to have access to Third Parties’ sites.

The work of professional representatives of CUCBM shall be arranged by the manager(s) of the departments of the Operator

in which professional representatives work.

Professional representatives of CUCBM, except for the professional representatives in charge of procurement who shall

undertake their functions in accordance with Article 7.6 herein, shall not interfere in the decision making on relevant matters

by departmental manager(s) of the Operator. However, such professional representatives shall have the right to make

proposals and comments to departmental manager(s) of the Operator or to report directly to CUCBM’s representatives in

JMC.



7.5.1 On the principle of mutual cooperation and coordination, the Operator shall provide the professional representatives with

necessary facilities and assistance to perform office work and to observe the operating sites.

16



7.5.2 The number of professional representatives, which shall be a reasonable number and consistent with accepted international

CBM industry practice and sound economic practice, shall be decided by JMC through consultations.

7.6



When one of the companies comprising the Contractor acts as the Operator, in respect of the items listed in the procurement

plan, the procedures and provisions hereunder shall be followed:



7.6.1 The procurement department of the Operator shall inform the professional representatives appointed by CUCBM in charge

of procurement of all the items of procurement and specifications relating thereto.

7.6.2 The Operator shall be subject to Articles 15.1 and 15.3 hereof and reach agreement through consultation with the

professional representatives of CUCBM in charge of procurement when preparing the procurement plan in accordance with

the Work Program and budget. The professional representatives of CUCBM in charge of procurement shall work out an

inventory listing the equipment and materials which can be made and provided in China and a list of manufacturers,

engineering and construction companies and enterprises in China which can provide services and undertake subcontracting

work.

7.6.3 Unless otherwise agreed upon by the Parties, the Operator shall, in general, make procurement by means of calling for bids

and shall notify at the same time manufacturers and enterprises concerned both inside and outside China, and the work of

calling for bids shall be done within the territory of China.

7.6.4 When any procurement is to be made by means of calling for bids, the manufacturers and enterprises in China applying for

bidding which are included in a list delivered in advance to the Operator by the professional representatives of CUCBM in

charge of procurement shall be invited. The professional representatives of CUCBM in charge of procurement shall have the

right to take part in the work of calling for bids, including examination of the list of bidders to be invited, preparing and

issuing bidding documents, opening bids, evaluation of bids, and shall have the right to consult with the Operator on the

determination of award of contracts and to participate in negotiations for various contracts. The foregoing shall be handled

in an expeditious, efficient and timely manner.

7.6.5 With respect to the items of procurement by means other than calling for bids, the Operator and the professional

representatives of CUCBM in charge of procurement shall, in accordance with the provisions specified in Article 7.6.2

herein, define those items which are to be procured in the People’s Republic of China and those items which are to be

procured abroad.

7.7



All salaries, costs and expenses with respect to the staff members of the Parties in the subordinate bodies of the JMC

established in accordance with Article 7.4 herein, those with respect to the professional representatives referred to in

Article 7.5. herein, and those with respect to the representatives

17



of JMC referred to in Article 7.1.1 herein while attending JMC meetings, shall be paid by the Operator and charged

respectively to the exploration costs, development costs and operating costs in accordance with Annex II- Accounting

Procedure hereto. During the exploration period, all salaries, costs and expenses with respect to the staff members of

CUCBM in the subordinate bodies of JMC, the CUCBM professional representatives and the CUCBM representatives of

JMC shall be paid by the Operator in accordance with Annex III — Personnel Costs hereto. All salaries, costs and expenses

with respect to the above mentioned personnel to be paid and charged during the development period and production period

shall be determined by the Parties through consultation. It is understood no salary duplication for any individual shall be

allowed. In the event any individual occupies more than one chargeable position, then the higher applicable salary shall be

charged to the Joint Account for the period during which the higher position is occupied.

7.8 The specific responsibilities and working procedures within JMC shall be proposed by the Parties, and discussed and

determined by JMC in accordance with the relevant provisions herein.

Article 8

Operator

8.1 The Parties agree that Pacific Asia Petroleum Ltd shall act as the Operator for the CBM Operations within the Contract Area,

unless otherwise stipulated in Article 8.8 herein and Article 29.4 hereof.

8.2 For the implementation of the Contract, each company comprising the Contractor shall register with the State Administration

for Industry and Commerce of the People’s Republic of China, or if any of such companies is already registered, such

company shall amend its registration to include in the Contract in accordance with the relevant provisions of the State

Administration for Industry and Commerce. CUCBM shall, at the request of the Contractor, provide assistance for this

purpose.

The person designated by Operator to be in charge of CBM Operations shall have the full right to represent the Contractor in

respect of the performance of the CBM Operations. The names, positions and resumes of the staff and organization chart of

the Operator shall be submitted in advance to CUCBM and the appointment of the Operator’s senior staff must be subject to

the consent of CUCBM.

The parent corporation of each company comprising the Contractor which is not itself a parent corporation shall, at the

request of CUCBM, provide CUCBM with a written performance guarantee acceptable to CUCBM.

8.3 The Operator shall have the following obligations:

18



8.3.1



To apply the appropriate and advanced technology and business managerial experience of the Contractor or its Affiliates to

perform the CBM Operations reasonably, economically and efficiently in accordance with sound international practice.



8.3.2



To prepare Work Programs and budgets related to the CBM Operations and to carry out the approved Work Programs and

budgets.



8.3.3



To be responsible for procurement of installations, equipment, and supplies and entering into subcontracts and service

contracts related to the CBM Operations, in accordance with the approved Work Programs and budgets and the applicable

provisions of Articles 7.2.4, 7.6 and 10.2 hereof.



8.3.4



To prepare in advance, in accordance with Article 16 hereof, a personnel training program and budget before the

commencement of the Exploration Operations, Development Operations and Production Operations respectively, and, in

accordance with the said program and budget, to be responsible for preparing an annual personnel training program and

budget and carrying out the annual program and budget after approval by JMC.



8.3.5



To establish an insurance program, and to enter into and implement the insurance contracts in accordance with Article 20

hereof.



8.3.6



To issue cash-call notices to all the Parties to the Contract to raise the required funds based on the approved budgets and in

accordance with Article 12 hereof and Annex II - Accounting Procedure hereto.



8.3.7



To maintain complete and accurate accounting records of all the costs and expenditures of the CBM Operations in

accordance with the provisions of Annex II — Accounting Procedure hereto and to keep the accounting books secure and

in good order.



8.3.8



To make necessary preparation for regular meetings of JMC, and to submit in advance to JMC necessary information

related to the matters to be reviewed and approved by JMC.



8.3.9



To inform directly or indirectly all the Subcontractors which render services for the CBM Operations in China and all the

Expatriate Employees of the Operator and of Subcontractors who are engaged in the CBM Operations in China that they

shall be subject to the laws, decrees, and other rules and regulations of the People’s Republic of China.



8.3.10 To report its work to JMC as provided in Article 7.2 hereof.

8.4



In the course of the performance of the CBM Operations, any direct losses, arising strictly out of the gross negligence or

willful misconduct of the Operator, (excluding personnel specified in Article 1.2 of Annex III-Personnel Costs, hereto)

shall be solely borne by the Operator. Losses arising from any cause other than strictly out of the gross negligence or

willful misconduct of

19



the Operator shall be borne by the Parties in accordance with their respective participating interest. The Operator shall make

its best efforts in accordance with international CBM industry practice to include provisions similar to this Article 8.4 herein

in related subcontracts and service contracts.

8.5



In the course of the performance of the CBM Operations, the Operator shall handle the information, samples or reports in

accordance with the following provisions:



8.5.1



The Operator shall provide CUCBM with various information, samples and data in accordance with relevant regulations

and Annex IV — Data Control hereto. The ownership of all the information, samples and data shall vest in CUCBM; and

the Operator shall have the right to use and handle such information, samples and data in accordance with Annex IV —

Data Control hereto. The information and data shall be reported to CUCBM at the same time that the Operator reports

them to its parent corporation. Upon receipt by the Operator of any report from its parent corporation concerning such

information and data, a copy of such report shall be furnished to CUCBM as soon as practicable.



8.5.2



The Operator shall furnish CUCBM in a timely manner with reports on safety, environmental protection and accidents

related to the CBM Operations and with financial reports prepared in accordance with the provisions of Annex II —

Accounting Procedure hereto.



8.5.3



The Operator shall provide the non-operator(s) of the Contractor with copies of the relevant data and reports reasonably

required by non-operator(s) and referred to in Articles 8.5.1 and 8.5.2 herein.



8.5.4



The Operator shall, at the request of any Party to the Contract, furnish that Party to the Contract with the following:



8.5.4.1 Procurement plans for purchasing equipment and materials, inquiries, offers, orders and service contracts;

8.5.4.2 Technical manuals, technical specifications, design criteria, design documents (including design drawings), construction

records and information, consumption statistics, equipment inventory, and spare parts inventory;

8.5.4.3 Technical investigation and cost analysis reports; and

8.5.4.4 Other information relating to the CBM Operations in the Contract Area already acquired by the Operator in the

performance of the Contract.

8.6



In the course of performing the CBM Operations, the Operator shall abide by the laws, decrees, standards and other rules

and regulations with respect to environmental protection and safety of the People’s Republic of China and shall endeavor

in accordance with the international CBM industry practice to:

20



8.6.1 Minimize the damage and destruction caused by the CBM Operations to community and ecological environment;

8.6.2 Control blowouts promptly and prevent or avoid waste or loss of CBM discovered in or produced from the Contract Area;

8.6.3 Prevent land, forests, vegetation, crops, buildings and other installations from being damaged and destroyed; and

8.6.4 Minimize the danger to personnel safety and health.

8.7



Project Management Team

In any CBM Field within the Contract Area where CUCBM has a participating interest in the development of the said Field,

a project management team (hereafter referred to as “PMT”) shall be established for the development of such CBM Field in

the organization of the Operator within thirty (30) days from the date of approval of the Overall Development Program for

the said Field.

PMT shall comprise those personnel designated by the Parties and the number of CUCBM’s personnel shall be no less than

one third (1/3) of the total number of personnel within PMT. The Contractor shall designate a person acting as the manager

of PMT, and CUCBM shall designate a person acting as the deputy manager of PMT.

PMT shall be located at the Operator’s office within the Chinese territory. The working location(s) of the members of PMT

shall be decided according to the need of the work.

The specific organization, staffing and working system of PMT and responsibilities and competence of various positions

including those of CUCBM’s personnel assigned to PMT shall be determined by the Parties through consultation prior to the

approval of the Overall Development Program for the said CBM Field. The PMT shall exist for the period of the

development of said CBM Field.



8.8



Conduct of CBM Operation.



8.8.1 Not later than one year prior to the forecasted date of the full recovery of development costs and Deemed Interest thereon,

(“Cost Recovery Date”), in accordance with the Overall Development Program for the first CBM Field within the Contract

Area forecasted to recover said costs, the Parties shall commence good faith negotiations of a Joint Operating Agreement

and Organization.

8.8.2 It is the intent of the Contractor and CUCBM that effective no later than said Cost Recovery Date, all CBM Operations

within the Contract Area will be conducted by the Contractor and CUCBM as Operator pursuant to such Joint Operating

Agreement.

21



8.9 The expenses incurred in the transfer and takeover of the CBM Operations to CUCBM and Contractor as Operator shall be

approved as a budget item and charged to the operating costs in accordance with Annex II- Accounting Procedure.

8.10 With a view to efficiently conducting Work Programs approved by the JMC, the Operator shall have the right to use or

occupy/and, including to obtain rights of way, inside or outside the Contract Area, subject to promulgated Chinese laws and

regulations.

The costs to be charged to Contractor for such land shall be reasonable and mutually agreed to in writing by CUCBM and

Contractor. Any costs incurred by the Operator for this purpose shall be respectively charged to exploration costs,

development costs and operating costs having regard to the date on which the same are actually incurred.

8.11 Associated with the Contract Area and included in the grants of rights hereunder will be a pipeline right-of-way, if required,

from the Contract Area to the Delivery Point.

Article 9

Assistance Provided by CUCBM

9.1



To enable the Contractor to carry out expeditiously and efficiently the CBM Operations, CUCBM shall have the obligation

to assist the Contractor at its request to:



9.1.1 Obtain the approvals or permits needed to open accounts with Bank of China;

9.1.2 Go through the formalities of exchanging foreign currencies;

9.1.3 Obtain office space, office supplies, transportation and communication facilities and make arrangements for

accommodations as required, at reasonable rates;

9.1.4 Go through the formalities of Customs;

9.1.5 Obtain entry and exit visas and residence permits for Expatriate Employees who will come to China for the performance of

the Contract and for their dependents, who will visit them or reside in China and provide assistance for their transportation

and moving as well as medical services and travel in China;

9.1.6 Obtain necessary permission to send abroad, if necessary, documents, data and samples for analysis or processing during the

performance of the CBM Operations; and

22



9.1.7 Maintain liaison with central and local governments, and contact and coordinate with departments engaged in fishing,

aquatic plants, stock raising, agriculture, meteorology, ocean shipping, civil aviation, railway, transportation, electric power

communication and services for supply bases, for relevant matters and otherwise assist the Contractor in obtaining on a

timely basis approvals necessary for the conduct of the CBM Operations under the Contract;

9.1.8 Lease or use warehouses, yards, terminal facilities, barges, aircrafts, pipelines and land, etc. in the implementation of the

CBM Operations; and

9.1.9 Facilitate the Contractor’s and Subcontractors’ registration in China.

9.2



In accordance with Article 15 hereof, CUCBM shall, at the request of the Contractor, assist the Contractor with the

recruitment of Chinese Personnel.



9.3



CUCBM shall, at the request of the Contractor, provide the Contractor with data and samples, if any, from the Contract Area

within CUCBM’s and/or its Affiliates Control, at reasonable rates in accordance with any relevant rules and regulations and

CUCBM shall also assist the Contractor to arrange the purchase of any other data including but not limited to

environmental, hydrological, topographical and meteorological data at reasonable rates.



9.4



CUCBM shall, at the request of the Contractor, also assist the Contractor with matters other than those under Articles 9.1,

9.2 and 9.3 herein, including, but not limited to, the acquisition, at reasonable costs where applicable, of any rights of way

necessary for transportation infrastructure, and the facilitation or bringing about of the granting of all approvals, permits and

licenses related to the CBM Operations.



9.5



All expenses incurred in the assistance provided by CUCBM in accordance with this Article 9 shall be paid by the

Contractor and shall be handled in accordance with the provisions of Annex II-Accounting Procedure hereto.



Article 10

Work Program and Budget

10.1 After the Date of Commencement of the Implementation of the Contract, the Operator shall propose and submit to JMC the

annual Work Program and budget for the remainder of the same Calendar Year at the first regular meeting of JMC. Before

the fifteenth (15th) of September of each Calendar Year, the Operator shall complete and submit to JMC for its review an

annual Work Program and budget for the next Calendar Year except as otherwise agreed by CUCBM. JMC shall either

adopt the annual Work Program and budget as submitted or make such modifications agreed by the Parties. The

23



adopted annual Work Program and budget shall be submitted to CUCBM for review and consent within one (l) month as of

the date on which they are submitted to JMC. Within fifteen (15) days following the receipt of the annual Work Program

and budget, CUCBM shall notify JMC in writing of its consent or dissent or any modifications thereto with its detailed

reasons. If CUCBM requests any modifications to the aforesaid annual Work Program and budget, the Parties shall

promptly hold meetings to make modifications and any modifications agreed upon by the Parties shall be effected

immediately. In case CUCBM fails to notify JMC in writing of its consent or dissent or any modification within fifteen

(15) days, the annual Work Program and budget adopted by JMC shall be deemed to have been consented by CUCBM.

The Operator shall make its best efforts to perform the CBM Operations in accordance with the consented annual Work

Program and budget. For reviewing Work Program and budget by JMC, the Operator shall provide to JMC the supporting

data when requested. During the exploration period, the budgets so consented by CUCBM shall be sufficient to allow the

Operator to fulfill the Work Programs including those Work Programs under Article 7.3.1 hereof and the obligations under

the Contract.

10.2



The Operator may, in accordance with the following provisions, incur excess expenditures or expenditures outside the

budget in carrying out the Work Program and budget, provided that the objectives of the consented Work Program and

budget are not changed.



10.2.1 In carrying out an consented budget for a single item, such as the drilling of a well, the Operator may, if necessary, incur

excess expenditures of no more than ten percent (10%) of the budgeted amount. The Operator shall report the aggregate

amount of all such excess expenditures to JMC for confirmation on a Calendar Quarter basis.

10.2.2 For the efficient performance of the CBM Operations, the Operator may, without consent, undertake certain individual

projects which are not included in the Work Program and budget, for a maximum expenditure of One Hundred Thousand

U.S. dollars (U.S.$100,000), but the Operator shall, within ten (10) days after such expenditures are incurred, report to

JMC for confirmation. In case of emergency, the Operator may incur emergency expenditures for the amount actually

needed but shall report such expenditures to JMC as soon as they are made. However, the said emergency expenditures

shall not be subject to Articles 10.2.3 and 10.2.4 herein.

10.2.3 In the event that the aggregate of excess expenditures under Article 10.2.1 herein and expenditures under Article 10.2.2

herein incurred in a Calendar Year cause the total expenditures of that Calendar Year to exceed the consented annual

budget, such excess shall not exceed five percent (5%) of the consented annual budget for that Calendar Year. If the

aforesaid excess is expected to be in excess of five percent (5%) of the annual budget, the Operator shall present its reasons

therefore to JMC and obtain its approval prior to incurring such expenditures.

24



10.2.4 When JMC confirms the excess expenditures mentioned in Articles 10.2.1 herein, and the expenditures mentioned in

Article 10.2.2 herein:

(a) if expenditures or excess expenditures are determined to be reasonable, the Operator may incur such expenditures or

excess expenditures again during the same Calendar Year, subject to Article 10.2 herein; or

(b) if expenditures or excess expenditures are determined to be unreasonable, the Operator shall not incur such

expenditures or excess expenditures again during the same Calendar Year and such unreasonable expenditures or

excess expenditures shall be dealt with in accordance with Article 5.4 of Annex II-Accounting Procedure hereto.

However, with respect to the joint operation conducted by the Contractor and CUCBM specified in Article 8.8 hereof,

this provision shall not be applicable.

Article 11

Determination of Commerciality of CBM

11.1 If any CBM Discovery is made within the Contract Area, the Operator shall promptly report such discovery to JMC. If JMC

or the Contractor makes a decision that a CBM Discovery is worthy of a Pilot Development, the Operator shall submit to

JMC a Pilot Development Work Program which shall include disposal of any CBM and/or Liquid Hydrocarbons whether by

sale, flaring or otherwise and timetable for such CBM Discovery as soon as possible. Such Pilot Development Work

Program shall be worked out no later than ninety (90) days from the date of the aforesaid decision made by JMC or the

Contractor. The Pilot Development Work Program shall, in so far as is practicable, be based on conducting the Pilot

Development work continuously, with a view to commencing operations within one hundred and eighty (180) days from the

date of the aforesaid decision made by JMC or the Contractor.

11.2 After the approval by JMC of the Pilot Development Work Program referred to in Article 11.1 herein, the Operator shall

carry out the operations as soon as possible without unreasonable delay in accordance with the timetable set forth in the

approved Pilot Development Work Program.

11.3 Unless otherwise specified in the Pilot Development Work Program, within one hundred and eighty (180) days after the

completion of the Pilot Development, the Operator shall submit to JMC a detailed report on the evaluation of the potential

commerciality of the CBM discovery for review and discussion. Under special circumstances, the above-mentioned period

may be reasonably extended upon agreement of the Parties.

The Pilot Development report shall include the evaluation on geology, development, engineering and economics, the

Maximum Efficient Rate (MER)

25



and the estimated duration of the production period determined in accordance with the international CBM industry practice.

11.4 If JMC decides unanimously that a CBM Discovery is non-commercial, at the request of the Contractor, the corresponding

area covered by the CBM Discovery may be retained in the Contract Area during the exploration period. But if, at the

expiration of the exploration period, JMC unanimously still considers the said CBM Discovery to be non-commercial, the

area covered by the CBM Discovery shall be excluded from the Contract Area. The preceding shall not apply to a CBM

Field which in the opinion of either Party has potential commercial value but which has not been developed due to a lack of

market, a shortage of consuming facilities or lack of transportation facilities and/or inability to negotiate longterm

transportation and/or sales agreements.

Prior to the expiration of the exploration period, if any Party considers that a CBM Discovery which has been determined to

be non-commercial needs to be reappraised because of some favorable factors, the Operator shall work out a new evaluation

report on that CBM Discovery and submit it to JMC for review and approval.

11.5 If the Contractor, prior to the expiration of the exploration period, advises JMC in writing that any CBM Discovery is noncommercial, the Contractor shall be deemed to have waived its rights of participating in the development of that CBM Field,

then, CUCBM shall have the right to solely develop such potential CBM Field.

11.6 Where the Parties consider a CBM Discovery to be potentially commercial, as the Operator, the Contractor shall work out

the Overall Development Program for that CBM Field. the Parties shall negotiate to reach an agreement on the development

of the said CBM Field in a manner that shall not interfere unreasonably with the expansion of coal mining operations in the

relevant coal field. The Overall Development Program and the agreement concerning the development shall be a

supplementary document and an integral part hereof after they are approved by the Ministry of Commerce (MOFCOM) of

the People’s Republic of China and the Department Designated by the State Council.

11.7 Longterm CBM, and CBM Products and Liquid Hydrocarbons transportation and sales agreements shall be concluded prior

to the Determination of Commerciality.

11.8 In the event of a CBM Field Straddling a Boundary or of a potentially commercial CBM Discovery straddling a boundary of

the Contract Area, CUCBM shall organize the Contractor and the neighboring party(ies) involved, which may include

CUCBM and/or it’s Affiliates, to work out a unitized or new Overall Development Program for such Field or Pilot

Development work program for such CBM Discovery. If such area is controlled solely by CUCBM and/or its Affiliates,

then the Contract Area

26



shall be extended to cover the CBM Field with the approval of Department Designated by the State Council.

11.9 If a CBM Discovery without commercial value within the Contract Area and a CBM discovery outside the Contract Area

can be most economically developed as a commercial CBM Field by common facilities jointly constructed; or if CBM

discovery without commercial value within the Contract Area, can be economically developed as a commercial CBM Field

by linking it up with existing facilities located outside the Contract Area, CUCBM shall organize the Contractor and the

neighboring party(ies) involved, which may include CUCBM and/or its Affiliates, to work out an equitable agreement for

construction or utilization and sharing the costs relative to said facilities.

11.10 In Article 11 those procedures which reference the Overall Development Program, shall be applied, by analogy in the

following circumstances: additional development projects referring to the Overall Development Program designed either to

improve the producing capability of the reservoir or to substantially increase the recoverable reserves therefrom through

additional investments. Any extension of the production period of the CBM Field due to such additional development

projects shall be subject to the related provision of Article 4.5 hereof.

11.11 Notwithstanding the Date of Commencement of Commercial Production or anything else to the contrary herein, the

allocation of the production from a Pilot Development shall be governed by the principles set forth in Articles 12 and 13

hereof.

Article 12

Financing and Cost Recovery

12.1



Funds required for the CBM Operations shall be raised by the Operator in accordance with Work Programs and budgets

determined pursuant to the relevant provisions of the Contract, the provisions described in Annex II — Accounting

Procedure hereto, and the provisions described here below. The Foreign Contractor shall use the U.S. dollars or other

convertible currencies as its investment.



12.1.1 All the exploration costs required for Exploration Operations shall be provided solely by the Contractor. For purpose of the

Contract, all costs incurred during the extended period described in Article 4.3 hereof shall be deemed exploration costs

and shall be provided solely by the Contractor.

12.1.2 The development costs required for Development Operations in each CBM Field within the Contract Area shall be

provided by CUCBM and the Contractor in proportion to their respective participating interests: forty percent (40 %) by

CUCBM and sixty percent (60 %) by the Contractor,

27



unless CUCBM applies the provisions of the second paragraph of this Article 12.1.2 herein.

In the event that CUCBM, at its option, decides not to participate in the development of a CBM Field or decides to

participate in the development of such CBM Field to an extent of less than forty percent (40 %) of the participating

interest, CUCBM shall notify the Contractor in writing of its decision of non-participation or a specific lesser percentage of

the participating interests before the Pilot Development report is reviewed by JMC pursuant to Article 11.4 hereof. In such

case, if CUCBM does not participate in the development of such CBM Field, the development costs therein shall be borne

solely by the Contractor, or in case CUCBM participates in the development of such CBM Field to an extent of less than

forty percent (40 %) of the participating interests, such development costs shall be borne by the Parties in proportion to

their actual respective participating interests.

12.1.3 The operating costs incurred for the performance of the Production Operations of each CBM Field before the Date of

Commencement of Commercial Production shall be considered as development costs. The operating costs so incurred after

the Date of Commencement of Commercial Production shall be paid respectively by CUCBM and the Contractor in

proportion to their participating interests of the said CBM Field.

12.1.4 The Parties, on each others request, shall cooperate and assist each other to facilitate the financing of CBM Operations on

the best terms and conditions available. For the purpose of implementation of the Contract, CUCBM agrees that the

Contractor may, when financing, use the entitlement of its share of production under the Contract as a security for loans,

provided that the Contractor shall advise CUCBM in advance and the loan application therefore shall be examined by

CUCBM, and provided further that the rights and interests of CUCBM under the Contract shall not be impaired thereby.

12.2



All the costs incurred in the performance of CBM Operations shall be recovered in accordance with Annex II —

Accounting Procedure hereto and the provisions described as follows:



12.2.1 The operating costs for any given Calendar Year actually incurred by CUCBM and the Contractor in respect of each CBM

Field pursuant to Article 12.1.3 herein, shall be recovered in kind by the Parties out of the CBM and Liquid Hydrocarbons

produced from the said CBM Field during that Calendar Year in accordance with Annex II — Accounting Procedure

hereto, after the operating costs have been converted into a quantity of CBM and Liquid Hydrocarbons on the basis of the

CBM price and Liquid Hydrocarbons price determined in accordance with Article 14 hereof. Unrecovered operating costs

shall be carried forward to the succeeding (subsequent) Calendar Year(s).

12.2.2 The exploration costs incurred by the Contractor shall be recovered as follows:

After the Date of Commencement of Commercial Production of a CBM Field

28



within the Contract Area, the exploration costs incurred by the Contractor in respect of the Contract Area shall be

recovered in kind out of the CBM and Liquid Hydrocarbons produced from any CBM Field within the Contract Area in

accordance with Article 13.2.2.2 hereof, after the exploration costs have been converted into a quantity of CBM and

Liquid Hydrocarbons based on the CBM price and Liquid Hydrocarbons price determined in accordance with Article 14

hereof. The exploration costs shall be recovered without any interest.

If no CBM Field is discovered within the Contract Area, the exploration costs incurred by the Contractor shall be deemed

as its loss. Under no circumstances shall CUCBM reimburse the Contractor for such loss.

12.2.3



The development costs in respect of each CBM Field incurred by CUCBM and the Contractor and Deemed Interest

thereon shall be recovered as follows:



12.2.3.1 After the Date of Commencement of Commercial Production of any CBM Field within the Contract Area, the

development costs in respect of such CBM Field incurred by CUCBM and the Contractor and Deemed Interest thereon

calculated in accordance with Article 12.2.3.2 herein shall be recovered in kind out of the CBM and Liquid

Hydrocarbons produced from such CBM Field in accordance with Article 13.2.2.2 hereof, after the development costs

and Deemed Interest thereon have been converted into a quantity of CBM and Liquid Hydrocarbons based on the CBM

price and Liquid Hydrocarbons price determined in accordance with Article 14 hereof.

12.2.3.2 Deemed Interest on the development costs incurred by CUCBM and the Contractor for each CBM Field within the

Contract Area shall be calculated at a fixed annual compound rate of nine percent (9%) from the first day of the month

following the month in which such development costs expended by each Party to the Contract are actually received in the

bank account of the Joint Account opened by the Operator. The detailed method of such calculation shall be as provided

in Annex II — Accounting Procedure hereto.

12.2.4



Any CBM and Liquid Hydrocarbons extracted and delivered from a CBM Field before the Date of Commencement of

Commercial Production shall be allocated in accordance with Article 12 and Article 13 hereof.



Article 13

CBM Production and Allocation

13.1



The Operator shall, in accordance with the production profile, adjusted as the case may be, set forth in the approved

Overall Development Program for each CBM Field, work out a CBM production plan for each CBM Field in each

Calendar Year and carry out CBM production pursuant to such plan.



13.2



The Annual Gross Production of CBM and Liquid Hydrocarbons of each

29



CBM Field within the Contract Area in each Calendar Year during the production period shall be allocated in accordance

with the following sequence and proportions:

13.2.1 The percentages of the Annual Gross Production of CBM and Liquid Hydrocarbons specified in paragraphs (a) and

(b) hereunder shall be used for payments of the Value Added Tax and of Royalty respectively and shall be paid in kind to

the relevant authorities of the Chinese Government through CUCBM.

(a) Value Added Tax shall be paid in accordance with relevant regulations of the People’s Republic of China; and

(b) Royalty shall be paid in accordance with relevant regulations of the People’s Republic of China.

13.2.2



Seventy percent (70%) of the Annual Gross Production of CBM and Liquid Hydrocarbons shall be deemed as the “cost

recovery CBM and Liquid Hydrocarbons” and shall be used for payments or for cost recovery in the following sequence:



13.2.2.1 Payment in kind for the operating costs actually incurred (and any abandonment costs accrued per Article 4) but not yet

recovered by the Parties pursuant to Article 12.2.1 hereof based on the price of the said “cost recovery CBM and Liquid

Hydrocarbons” determined in accordance with Article 14 hereof.

13.2.2.2 The remainder of the “cost recovery CBM and Liquid Hydrocarbons” shall, after payment for operating costs in

accordance with Article 13.2.2.1 herein, be deemed as “investment recovery CBM and Liquid Hydrocarbons”. Such

“investment recovery CBM and Liquid Hydrocarbons” shall be used for the recovery of the exploration costs in respect

of the Contract Area which were incurred and not yet recovered by the Contractor, and shall be used for the recovery of

the development costs in respect of the CBM Field itself which were incurred and not yet recovered by CUCBM and the

Contractor in accordance with Articles 12.2.2 and 12.2.3 hereof, and Deemed Interest thereon. The method of recovery

and the recovery sequence are as follows:

(a) Beginning in the Calendar Year during which the production of any CBM Field within the Contract Area commences,

the “investment recovery CBM and Liquid Hydrocarbons” referred to in Article 13.2.2.2 herein, based on the price

which has been determined in accordance with Article 14 hereof, shall be paid in kind first to the companies

comprising the Contractor for the recovery of the exploration costs which were incurred in respect of, and have not

yet been recovered from, the Contract Area.

The unrecovered exploration costs shall be carried forward to and recovered from the “investment recovery CBM and

Liquid

30



Hydrocarbons” in succeeding Calendar Years until fully recovered by the Contractor.

(b) Beginning in the Calendar Year during which the exploration costs incurred by the Contractor in respect of the

Contract Area have been fully recovered, the remainder of the “investment recovery CBM and Liquid Hydrocarbons”

of a CBM Field shall be used for the simultaneous recovery of the development costs incurred and not yet recovered

respectively by CUCBM and the Contractor and Deemed Interest thereon in respect of such CBM Field in proportion

to their respective participating interests therein based on the price of such remainder of the “investment recovery

CBM and Liquid Hydrocarbons” determined in accordance with Article 14 hereof. The unrecovered development costs

and Deemed Interest thereon shall be carried forward to and recovered from the “investment recovery CBM and Liquid

Hydrocarbons” in succeeding Calendar Years until fully recovered.

(c) During the production period of a CBM Field, costs for an additional development project incurred pursuant to

Article 11.9 hereof and Deemed Interest thereon shall be recovered together with the unrecovered development costs

and Deemed Interest thereon. If the development costs and Deemed Interest thereon have been fully recovered, then

costs for the said additional development project and Deemed Interest thereon shall be recovered from the “investment

recovery CBM and Liquid Hydrocarbons” of such CBM Field referred to in Article 13.2.2.2 herein in accordance with

the provisions specified in Article 13.2 herein. The unrecovered costs for the additional development project and

Deemed Interest thereon shall be carried forward to and recovered in succeeding Calendar Years until fully recovered.

(d) After the recovery of a CBM Field’s development costs and Deemed Interest thereon and/or costs for the additional

development project and Deemed Interest thereon from the said CBM Field by the Parties, the remainder of the

“investment recovery CBM and Liquid Hydrocarbons” shall automatically be regarded as part of the “remainder CBM

and Liquid Hydrocarbons” referred to in Article 13.2.3 herein. By the date of expiration of the production period of a

CBM Field pursuant to Article 4.5 hereof, if any development costs and Deemed Interest thereon and/or costs for the

additional development project incurred in respect of such CBM Field and Deemed Interest thereon have not yet been

fully recovered, then such unrecovered costs and Deemed Interest thereon shall be regarded as a loss, and the Parties

shall bear the loss in proportion to their respective participating interests.

13.2.3 The remainder of the Annual Gross Production of CBM and Liquid Hydrocarbons after the allocation referred to in

Articles 13.2.1 and 13.2.2 herein shall be deemed as “remainder CBM and Liquid Hydrocarbons”. Such “remainder CBM

and Liquid Hydrocarbons” shall be divided into “share CBM and Liquid Hydrocarbons” of the Chinese side and “allocable

remainder CBM and Liquid

31



Hydrocarbons”. The “allocable remainder CBM and Liquid Hydrocarbons” of each CBM Field in each Calendar Year shall

be equal to the “remainder CBM and Liquid Hydrocarbons” of that Calendar Year multiplied by the factor (X) for each

CBM Field within the Contract Area in that Calendar Year. The factor (X) of each CBM Field in each Calendar Year shall

be determined in accordance with the following successive incremental tiers on the basis of the Annual Gross Production of

CBM and Liquid Hydrocarbons from such CBM Field during that Calendar Year.

Annual Gross Production

of

CBM and Liquid Hydrocarbons

From Each CBM Field

(Million Cubic Meters)



Factors (X) in Percentage

Applicable to Each

Production Tier of

Each CBM Field Within

the Contract Area



equal to or less than 500

over 500

to 800

over 800 to 1,200

over 1,200 to 1,800

over 1,800 to 2,500

over 2,500 to 5,000

over 5,000



Xl = 99 Percent ( 99%)

X2 = 99 Percent ( 99%)

X3 = 98 Percent ( 98%)

X4 = 97 Percent ( 97%)

X5 = 96 Percent ( 96%)

X6 = 93 Percent ( 93%)

X7= 90 Percent ( 90%)



In the above table, it is assumed that each cubic meter of CBM has a heating value of thirty-six thousand and nine

hundred sixty (36,960) BTU approximately. On this basis, a metric ton of Liquid Hydrocarbons in general will have a

heating value of forty- three (43) million BTU, or equivalent to 1,164 cubic meters of CBM. 1.0 kilo calorie is equal to

3.97 BTU. Adjustments will be made if actual heating value exceeds or is less than the above by ten percent (10%) or

more.

An example of application in calculating the factor (X):

Assuming that there are two producing commercial CBM Fields A and B within the Contract Area and the Annual Gross

Production of CBM and Liquid Hydrocarbons from CBM Field A in a Calendar Year is three thousand and sixty four

(3,064) million cubic meters, and that from CBM Field B is four thousand five hundred and ninety (4,590) million cubic

meters, the factor (X) of CBM Field A in that Calendar Year shall be:

500X1 + 300X2 +400X3 + 600X4 + 700x5 + 564X 6

X=



X 100%

3,064

and the factor (X) of CBM Field B in that Calendar Year shall be:

32



500X1 + 300X2 + 400X3 + 600X4 + 700X5 + 2090X 6

X=



X 100%

4,590



13.2.4 The “allocable remainder CBM and Liquid Hydrocarbons” of each CBM Field in each Calendar Year referred to in

Article 13.2.3 herein shall be shared by the Parties in proportion to their respective participating interests in the

development costs, forty percent (40 %) for CUCBM and sixty percent (60%) for the Contractor. In the event that CUCBM

does not participate in the development of an CBM Field within the Contract Area, the Contractor shall obtain one hundred

percent (100%) of the “allocable remainder CBM and Liquid Hydrocarbons” of that CBM Field. In the event that CUCBM

participates to an extent less than 40 percent (40 %) in the development of an CBM Field within the Contract Area, the

“allocable remainder CBM and Liquid Hydrocarbons” of such CBM Field in that Calendar Year shall be shared by the

Parties in proportion to their actual respective participating interests in such CBM Field.

13.3



Pursuant to the method of allocation specified in this Article, the Contractor may obtain an aggregate amount of CBM and

Liquid Hydrocarbons consisting of the following three categories and shall be subject to Article 1.7 of Annex II.



13.3.1 The total amount of CBM and Liquid Hydrocarbons as converted from the actual operating costs paid by the Contractor in

all CBM Fields in proportion to its participating interests in the development costs stipulated in Article 13.2.2.1 hereof

when recovering such costs;

13.3.2 The total amount of the “investment recovery CBM and Liquid Hydrocarbons” from all CBM Fields due to the Contractor

provided for in Article 13.2.2.2 herein; and

13.3.3 The total amount of the “allocable remainder CBM and Liquid Hydrocarbons” of all CBM Fields due to the Contractor in

accordance with Article 13.2.4 herein.

Article 14

Quality, Quantity, Price,

and Destination of CBM

14.1 In accordance with Article 13.3 hereof, the Contractor may obtain the aggregate amount of three (3) categories of the

Coalbed Methane and Liquid Hydrocarbons referred to in Articles 13.3.1, 13.3.2 and 13.3.3 hereof.

14.2 Quality of the CBM and Liquid Hydrocarbons.

33



14.2.1 The quality analysis of CBM and Liquid Hydrocarbons produced from each CBM Field within the Contract Area shall be

undertaken at the Delivery Point.

Such analysis shall be carried out on a sample taken by the General Administration of Quality Supervision, Inspection and

Quarantine (hereafter referred to as the “General Administration”) or any representative agency authorized by the General

Administration pursuant to standards issued by the State Bureau of Standardization of the People’s Republic of China or by

the Department Designated by the State Council.

14.3



Quantity of the Coalbed Methane and Liquid Hydrocarbons.



14.3.1 The quantity measurement of the CBM and/or Liquid Hydrocarbons produced from each CBM Field within the Contract

Area, when being lifted, shall be made at a Delivery Point and with measuring devices both to be agreed upon by the

Parties. A relevant measuring organization of the Chinese Government or a representative agency authorized thereby shall,

at appropriate regular intervals, calibrate all the measuring devices, conduct special testing and issue certificates of

qualification with respect thereto or confirm their qualification before the measuring devices are put into use. The quality

and quantity of the CBM and/or Liquid Hydrocarbons delivered shall be authenticated in accordance with the commodity

quality certificate and weight certificate issued by the General Administration and such quality and quantity shall be the

basis for the accounting settlement.

14.3.2 If any Party to the Contract believes that the CBM or Liquid Hydrocarbons measuring devices, sampling or analysis are

inaccurate, or has any objection to the results specified in the above mentioned certificates, on-site investigations, technical

exchanges and discussions may be conducted by the Parties to resolve the issue in a manner satisfactory to the Parties.

14.4



Determination of the Coalbed Methane and/or Liquid Hydrocarbons Price.



14.4.1 The price of various grades of the CBM and Liquid Hydrocarbons shall be expressed as a FOB price at the Delivery Point.

Determination of the CBM and Liquid Hydrocarbons price shall be based on the actual free market price received by the

Parties; and

a)



shall be determined each Calendar Quarter by CUCBM and each Party comprising Foreign Contractor individually;

and



b)



shall be the volumetrically weighted average of the following components:

1.



In arm’s length transactions the actual price received.



2.



For other than arm’s length transactions, the fair market price taking into account the prevailing market conditions.



The aforesaid price in arm’s length transactions in this Article refers to a free

34



market price at which a seller sells its CBM and/or Liquid Hydrocarbons to a buyer who is independent of the seller, but not

including prices used for government to government transactions or other fixed or controlled prices which do not reflect the

free market price, exchange or barter transactions.

The price of the CBM and Liquid Hydrocarbons produced from the Contract Area shall be determined based on general

pricing principles prevailing internationally taking into consideration such factors as the markets, quality and quantity of the

CBM and Liquid Hydrocarbons and the prices of alternate energy resources agreed upon by the Parties with the objective of

the Parties being to obtain the best price possible.

The transportation costs to be used to determine the FOB price at the Delivery Point shall be agreed to during the

negotiation of the longterm sales and purchase agreements and prior to the determination of commerciality and prior to the

preparation and approval by the Parties of an Overall Development Program. Such transportation costs shall be determined

in accordance with international Petroleum and CBM industry practice.

14.4.2 Where the CBM and/or Liquid Hydrocarbons produced from each CBM Field within the Contract Area differs in quality,

the prices of such CBM with different quality shall if practicable be individually determined.

14.4.3 The price of the Contractor’s share of the CBM and Liquid Hydrocarbons produced from all the CBM Fields within the

Contract Area shall be denominated in Chinese RMB per cubic meter (based on BTU basis in accordance with

Article 13.2.3).

14.5



Terms of Payment for the Purchased CBM and Liquid Hydrocarbons, Pursuant to Article 14.6 hereof.



14.5.1 Before the CBM and Liquid Hydrocarbons price is determined, the time limit for payment shall be agreed upon by the

Parties through consultation in accordance with the general international practice then prevailing.

14.5.2 In case any Party is in default of such payment, such Party shall pay interest on arrears of the payment, starting from the

first day of such default. The interest rate shall be the thirty-day term London Inter-Bank Offered Rate (LIBOR) for U.S.

dollars quoted by Midland Bank in London at eleven (11:00) a.m. on the first working day following the due date of

payment plus five percent (5%).

14.6



Destination of the CBM and Liquid Hydrocarbons.



14.6.1 The destination of Contractor’s CBM, CBM Products, and Liquid Hydrocarbons obtained under the Contract shall be at the

discretion of the Contractor. The Contractor shall have the following non-exclusive options:

35



(1) to join with and in the name of CUCBM to market a part or all of their respective shares of CBM and Liquid

Hydrocarbons and to sell such CBM and Liquid Hydrocarbons jointly to prospective purchasers and to achieve the

maximum market price and best commercial terms for both CUCBM and the Contractor; or

(2) any other marketing approaches and procedures agreed by the Parties.

14.6.2



Transportation costs shall be determined in accordance with Article 14.4.1 herein.



14.6.3



The CBM price or value shall be determined in accordance with this Article 14 with the objective of the Parties being to

produce the CBM at the MER and to obtain the best price possible.



14.6.4



Unless otherwise mutually agreed, the CBM Delivery Point shall be the most economically viable nearby pipeline having

available capacity.



14.6.5



For the purpose of encouraging the exploration and development of CBM, CUCBM and/or its Affiliates will, upon

request of Contractor, act as a buyer to purchase all or part of Contractor’s share of CBM and Liquid Hydrocarbons

produced from the Contract Area in accordance with the following provisions.



14.6.5.1 The Parties shall agree upon the volume and rates of delivery of CBM and Liquid Hydrocarbons by Contractor and to be

purchased by CUCBM and/or its Affiliates.

14.6.5.2 The price of CBM and other essential terms and conditions including but not limited to Delivery Point and pipeline costs

shall be determined pursuant to the provisions of Article 14 and shall unless otherwise mutually agreed be agreed upon

prior to the determination of commerciality and preparation of the Overall Development Program.

14.6.5.3 The Purchase of the CBM and Liquid Hydrocarbons produced from the Contract Area shall be made at the Delivery

Point, which unless otherwise mutually agreed, shall be the most economically viable nearby Natural Gas pipeline

having available capacity.

14.6.5.4 Unless otherwise agreed by the Contractor, payments for CBM and Liquid Hydrocarbons shall be made in U.S. dollars in

the bank account designated by Contractor.

14.6.6



In the case that CUCBM and/or its Affiliates have available capacity in the gas trunklines and/or pipeline infrastructure,

once a CBM transportation contract with reasonable transportation costs determined in accordance with Article 14.4.1

has been signed by and between CUCBM and/or its Affiliates and Contractor, Contractor shall be guaranteed access and

priority use of such trunkline and/or pipeline infrastructure and any subsequent CBM or Natural

36



Gas producer shall be subject to Contractors’ guaranteed access and priority use of such trunkline and/or pipeline

infrastructure.

Article 15

Preference for the Employment of the

Chinese Personnel, Goods and Services

15.1 For the performance of the CBM Operations, the Contractor’s procurement of necessary goods, leasing equipment and

signature of subcontracts or other service contracts shall be subject to relevant regulations. The Contractor shall give

preference to Chinese goods, equipment and service, provided that they are competitive in terms of price, quality and term

of delivery.

15.2 The Contractor may give preference to the employment of Chinese Personnel in the performance of the CBM Operations in

accordance with relevant regulations. For this purpose, the Contractor may submit in advance to CUCBM and JMC

respectively a plan for the employment of Chinese Personnel listing all the posts and number of the persons involved.

CUCBM shall, at the request of the Contractor and in accordance with the plan, provide or assist in recruiting Chinese

employee candidates for such employment. For the performance of CBM Operations, the Contractor shall have the

obligation to employ competent Chinese Personnel and to employ those who have become qualified after being trained in

accordance with the training program. The Contractor shall give preference in employing the Chinese Personnel who have

participated in the training program provided by the Contractor.

It is agreed between CUCBM and the Contractor that total Chinese Personnel employment levels, including the costs

thereof, for the purpose of conducting CBM Operations, including training therefore, shall always be consistent with

conducting such operations in an efficient and economic manner in accordance with good and generally accepted

international oil field practices.

All Chinese employees shall sign with the Operator employment contracts whose terms shall cover hiring, resignation and

dismissal, production and work responsibilities, wages and bonuses, working hours and holidays, labor insurance and

welfare benefits, labor protection and labor discipline. Such contracts shall include the right of the Operator to dismiss in

accordance with the Chinese laws and regulations concerned such employees who do not observe such contract or other

rules applicable to their work.

15.3 The engineering design corporations under or entrusted by CUCBM shall have the right to participate in the master designs

and engineering designs made by the Contractor for the purpose of the implementation of the Contract. Engineering design

companies within the territory of the People’s Republic of China shall be given preference in entering into the subcontracts

for the aforesaid master designs and engineering designs, provided that their technical level, quality, price and delivery time

are competitive.

37



15.4 After the Contractor signs equipment leasing contracts, service contracts or subcontracts with CUCBM or its Affiliates in

accordance with Article 15.1 herein, the Contractor shall endeavor to provide technical assistance to CUCBM or its

Affiliates, at the request of CUCBM, so as to enable them to meet the needs of operations to be undertaken. The expenses so

incurred shall be borne by CUCBM or its Affiliates.

Article 16

Training of Chinese Personnel

and Transfer of Technology

16.1 The Contractor agrees, in the course of the implementation of the Contract, to transfer to CUCBM and its Affiliates, the

advanced technology and managerial experience including proprietary technology e.g. patented technology, know-how or

other confidential technology, used in the performance of the CBM Operations and the necessary data and/or information for

mastering such technology and experience, provided, however, such technology to be transferred shall be proprietary to the

Contractor and if the transfer of any of such technology is restricted in any way during the term of the Contract, the

Contractor shall, to the extent reasonably possible, endeavor to obtain permission for the transfer of such restricted

technology. The Contractor agrees to train the CUCBM Personnel including workers, technical, economic, managerial, legal

and other professional personnel, in order to improve their technical and/or managerial capabilities relating to CBM

Operations.

16.2 Within ninety (90) days following the Date of Commencement of the Implementation of the Contract, the Contractor shall,

after consultation with CUCBM, complete and submit a training and technology transfer program for a reasonable number

of the CUCBM Personnel in the exploration period and the corresponding budget to JMC for review and approval, and upon

approval by JMC, put it into practice. The Contractor shall, after consultation with CUCBM, complete and submit training

and technology transfer programs and corresponding budgets for a reasonable number of the CUCBM Personnel in the

development period and production period, respectively, to JMC for its review and approval before the commencement of

the Development Operations and Production Operations, and upon approval by JMC, put them into practice in time so as to

have ample time in advance for such training and technology transfer.

16.3 The expenses and costs incurred for performing the training and technology transfer program stipulated in this Article shall

be charged to the exploration costs if such costs are incurred before the date of approval of the Overall Development

Program of the first CBM Field, and shall be charged to the development costs if such costs are incurred after the date of

approval of the Overall Development Program of the first CBM Field, and before the Date of

38



Commencement of Commercial Production of the first CBM Field, or shall be charged to the operating costs if such costs

are incurred after the Date of Commencement of Commercial Production of the first CBM Field.

16.4



In the course of the implementation of the Contract, the Parties shall have scientific and technical cooperation and

academic exchange in connection with the CBM Operations. The relevant provisions concerning the program, participating

personnel and type related to the scientific and technical cooperation and academic exchange shall be determined by the

Parties. The expenses required by the scientific and technical cooperation and academic exchange shall be included in the

budget specified in Article 16.2 herein and charged to the Joint Account. All inventions, experiments or research results

arising from the said cooperation and academic exchange shall be shared by and belong to the Parties who, subject to the

provisions of Article 21 hereof, shall not disclose them to any Third Party.



16.4.1 In the course of the implementation of the Contract, those scientific research projects which are required by the CBM

Operations but not carried out by the Parties may, with the approval of JMC, be commissioned to, and carried out by, any

Third Party. The Operator shall enter into subcontracts or service contracts with relevant scientific research departments

within the territory of the People’s Republic of China, provided that they are competent and competitive. The aforesaid

required expenses shall be included in the budget specified in Article 16.2 herein and charged to the Joint Account. All

inventions and experimental or research results developed from the aforesaid research projects carried out by a Third Party

delegated by the Operator shall also be shared by and belong to the Parties who, subject to the provisions of Article 21

hereof, shall not disclose them to any other Third Parties. The Operator shall endeavor to incorporate the provisions herein

in the subcontracts or service contracts signed with a Third Party.

16.5



The advanced technology and managerial experience, including proprietary technology, e.g. patented technology, knowhow or other confidential technology that the Contractor transfers to CUCBM, shall remain the exclusive property of the

Contractor and also be subject to the confidentiality restrictions of Article 21 hereof.



16.6



For the purpose of the implementation of this Article 16 — Training of Chinese Personnel and Transfer of Technology, the

costs and expenditures incurred by the Contractor annually for training of CUCBM’s Personnel and transfer of technology

shall be no less than fifty thousand ($50,000) U.S. dollars during the exploration period and no less than two hundred

thousand ($200,000) U.S. dollars during the development and production periods unless otherwise agreed by the Parties.



Article 17

Ownership of Assets and Data

39



17.1 All assets purchased, installed and constructed under the Work Program and budget for each CBM Field within the Contract

Area shall be owned by CUCBM from the date on which all the development costs actually incurred by the Contractor in

the development period of such CBM Field have been fully recovered or from the date on which the production period

expires, even though the aforesaid costs have not been fully recovered. The Operator shall be responsible for the acceptance

inspection or testing of the said assets and CUCBM may, as it deems necessary, send its experts to participate in such

acceptance inspection or testing. In the production period, the Operator may use these aforesaid CUCBM-owned assets free

of charge for performing the CBM Operations. Such assets shall not be used in any operations other than the CBM

Operations or any operations by Third Parties without the consent of the Parties.

17.2 Equipment and facilities which are owned by a Third Party and are either leased by the Operator or temporarily brought into

the territory of the People’s Republic of China for the performance of the CBM Operations shall not be deemed as assets

owned by CUCBM. Such equipment and facilities may be exported from the People’s Republic of China, and CUCBM shall

assist in handling export formalities.

17.3 The ownership of all data, records, samples, vouchers and other original data obtained in the course of performing the CBM

Operations shall vest in CUCBM, and the disclosure thereof by CUCBM shall be made in accordance with Article 21

hereof. However the Contractor shall, subject to any necessary approval as may be required and Article 21 hereof, have the

right to use inside and outside the People’s Republic of China, and keep samples, copies of all data, records and vouchers

for the purposes of the CBM Operations.

17.4 The facilities constructed for the conduct of CBM Operations hereunder, whether located within or outside the Contract

Area, may be used for the common benefit of any and all CBM Fields within the Contract Area (“Common Facilities”) for

so long as any CBM Field in the Contract Area is utilizing any of the Common Facilities. CUCBM and Contractor shall be

entitled to use, free of charge, excepting Operating Costs, such Common Facilities to the extent required for CBM

Operations, hereunder. Such right of use shall be permitted regardless of whether or not the costs related to such Common

Facilities have been recovered and regardless of whether or not the production period of the relevant CBM Field on which

the Common Facilities are located has been terminated.

The operating costs of the Common Facilities will be allocated to each CBM Field in proportion to the total Annual Gross

Production of CBM and Liquid Hydrocarbon, contribution of each CBM Field to the total Annual Gross Production of CBM

and Liquid Hydrocarbons of all the CBM Fields within Contract Area utilizing such facilities.

40



Article 18

Accounting, Auditing and Personnel Costs

18.1



Accounting

Annex II — Accounting Procedure hereto contains the guidelines for the Operator to keep accounting books and records

and make financial settlements. The Operator shall keep and settle the accounts for all the financial activities in respect of

the Contract Area and maintain all the accounting books and records in accordance with Annex II - Accounting Procedure

hereto in order to accurately reflect the exploration costs, development costs with Deemed Interest thereon and operating

costs incurred in the performance of the CBM Operations in respect of the Contract Area, as well as quantity and monetary

value of the production and allocation of CBM. The Operator shall submit detailed statements and relevant written reports

to JMC and the departments concerned.



18.2



Auditing.



18.2.1 Any non-Operator Party to the Contract shall have the right to audit all the Operator’s Joint Account accounting books and

records after the end of each Calendar Year and shall give the Operator a written notice of the auditing results. The auditing

shall be completed within twenty-four (24) months after the end of each Calendar Year. In the absence of any written

notice of the exception in the auditing results given by the non-Operator Party within such period or if the annual Joint

Account accounting books and records of the Operator are not audited by any non-Operator Party within such period, the

Operator’s Joint Account accounting books and records shall be deemed correct. A special auditing of the Operator’s Joint

Account accounting books and records may be made due to some special requirements during a Calendar Year.

18.2.2 If the auditing referred to in Article 18.2.1 herein is conducted, the Operator shall be given thirty (30) day notice prior to

the date of commencement of such auditing. There shall be no impediment to normal CBM Operations during the period of

any audit.

18.2.3 The auditors shall be entitled to access to all relevant Joint Account records, files and other information and may inspect

such sites and facilities as necessary.

18.2.4 Upon receipt of a notice of the non-Operator Party’s exceptions in the auditing results, the Operator shall use its best efforts

to reply in writing and resolve these matters in due time (no later than sixty (60) days thereafter).

18.3



Personnel Costs.



18.3.1 The personnel costs mean the remuneration and other related charges paid in

41



connection with personnel who are engaged whether temporarily or permanently in administration, management,

accounting, finance, tax, employee relations, procurement, legal affairs, computer services, engineering, geology,

geophysics, drilling and Production Operations as well as all other work for the implementation of the Contract.

18.3.1.1 The salary or wages of personnel of the JMC, of the personnel in the various subordinate bodies of the JMC, of the

professional representatives referred to in Article 7.5 and of all employees engaged in the performance of the CBM

Operations shall be included in the personnel costs as provided in Article 18.3.1 herein.

18.3.1.2 Personnel costs which are classified as the overhead of the superior management organization pursuant to Article 5.2.18

of Annex II — Accounting Procedure hereto shall not be included in the personnel costs mentioned herein.

18.3.2



After the Date of Commencement of the Implementation of the Contract, the Operator shall work out a staffing plan for

its organization and a personnel costs plan with respect thereto (including a plan of personnel costs, such as basic salary

or wage, overseas allowance and area allowance, etc.) before the beginning of each Calendar Year and submit such plan

with the annual Work Program and budget to JMC for review and examination.

During the exploration period, the Operator shall submit a staffing plan for its organization and a personnel costs plan

with the annual Work Program and budget to JMC for review and examination.

In the development period and production period, the Operator shall submit a staffing plan for its organization and a

personnel costs plan with the annual Work Program and budget to JMC for review and approval and the Contractor shall

provide to CUCBM with an itemized plan of personnel costs of the Expatriate Employees. CUCBM shall bear the

obligation of confidentiality to such information provided by the Contractor.

The Operator shall charge the personnel costs of the Contractor’s personnel actually incurred to the Joint Account.

CUCBM shall have the right to audit the personnel costs charged to the Joint Account, and when CUCBM acts as the

Operator, the Contractor shall also have the right to audit such personnel costs.



18.3.3



The level of the salaries and wages paid to the representatives appointed by CUCBM to JMC established in accordance

with Article 7.1 hereof, the Chinese Personnel working in various subordinate bodies of JMC established in accordance

with Article 7.4 hereof, the professional representatives assigned by CUCBM to all administrative and technical

departments of the Operator (Contractor) in accordance with Article 7.5 hereof and CUCBM’s personnel employed by

the Contractor shall be determined pursuant to the provisions of Annex III — Personnel Costs hereto.

42



The salaries and wages of the Chinese Personnel other than CUCBM personnel employed by the Operator shall be

determined through consultations and specified in the individual employment contracts.

The settlement of all charges for the salaries and wages of CUCBM personnel mentioned in Article 18.3.3 herein, shall be

made between CUCBM and the Operator in accordance with Annex III (Personnel Costs) hereto. CUCBM personnel shall

be responsible for any and all individual income tax due including but not limited to that due in accordance with the

provisions of the individual income tax law of the People’s Republic of China.

18.3.4 The Operator shall withhold the individual income tax of the Expatriate Employees it is required to withhold and due in

accordance with the provisions of the individual income tax law of the People’s Republic of China.

Article 19

Taxation

19.1 Except for the taxes and duties for which the Contractor has the statutory obligation to file and pay for the CBM Operations,

each of the companies comprising the Contractor shall pay taxes measured by income to the Government of the People’s

Republic of China subject to the tax laws and regulations of the People’s Republic of China applicable to the Contract.

19.2 The Operator shall advise the Subcontractors who render services for the Contract that they and their employees shall pay

taxes to the Government of the People’s Republic of China subject to the tax laws and regulations of the People’s Republic

of China.

Article 20

Insurance

20.1 The Operator shall work out an insurance program for the Exploration Operations and submit it to JMC for review and

approval within one hundred and twenty (120) days after the Date of Commencement of the Implementation of the Contract.

The Operator shall, on behalf of the Parties, obtain the insurance contracts in accordance with such program as approved by

JMC before commencement of CBM Operations within the Contract Area.

Similar provisions shall apply in respect of Development Operations and Production Operations.

20.2 All of the insurance items as approved in the insurance program shall be insured with the insurance companies established

in accordance with the laws

43



of the People’s Republic of China (hereinafter referred to as Chinese insurance companies) and shall be insured in

accordance with the laws and regulations of the People’s Republic of China and on terms and conditions competitive with

the world markets.

20.3 The insurance programs worked out by the Operator shall include, but not be limited to, the following insurance covering:

(a) damages to and expenses of all drilling installations and equipment, including damages to and expenses of the

properties used on worksites and supply bases for the CBM Operations, while the equipment and properties owned by

Third Party rendering services to the Operator shall be handled in accordance with Article 20.5 herein;

(b) damages to and expenses of any of the equipment or installations for production, storage and transportation, and

buildings in the course of construction and installation;

(c) damages to and expenses of the production installations, facilities, equipment and pipelines in CBM fields;

(d) liability to Third Parties;

(e) liability for pollution and expenses for cleaning up in the course of drilling and the Production Operations;

(f)



expenses for killing blowouts;



(g) liability incurred by the Operator in hiring land drilling rigs, vessels and aircraft serving the CBM Operations;

(h) liability for cleaning the remains; and

(i)



losses and expenses incurred during the transportation and storage in transit of goods shipped from different parts of

the world and other areas outside the Contract Area to the worksites.



20.4 In any insurance contracts, the deductibles shall be determined by the Parties through consultation, and losses within the

deductible limits shall be borne by Parties in proportion to their respective participating interests in the relevant operations.

20.5 When signing subcontracts or lease contracts, the Operator shall endeavor to require Subcontractors and lessors to insure

their risks under the relevant subcontracts or lease contracts shall be insured with Chinese insurance companies in

accordance with the laws and regulations of the People’s Republic of China. The rates, terms and conditions of such

insurance shall be competitive with world markets for similar risks.

20.6 In the course of the CBM Operations, the Parties shall cover separately personnel accidental death and injury insurance with

respect to personnel assigned by them respectively. The premiums in respect thereof shall be dealt with in the following

way: the premiums for personnel accidental death and injury insurance with respect to personnel whose costs are charged to

the Joint Account pursuant to the provisions of the Contract shall be charged to the Joint Account, and those with respect to

other personnel shall be borne respectively by the Parties by which they are assigned.

44



20.7



Insurance companies owned by or affiliated with any Party to the Contract, or the Parties themselves, may reinsure relevant

Chinese insurance companies who have obtain the insurance contract by reaching an agreement with such companies if

they are interested in covering any part of the insurance program hereof.



20.8



All motor vehicles used in the CBM Operations shall be insured with China’s insurance companies in accordance with the

laws and regulations of the People’s Republic of China.



20.9



The premiums of insurance in the exploration period and the development period shall be charged respectively to the

exploration costs and development costs while those in the production period shall be charged to the operating costs.



20.10 Any claim under the insurances of the agreed insurance program charged to the Joint Account shall be handled by the

Operator and any recovery made from insurers shall be credited to the Joint Account.

Article 21

Confidentiality

21.1 CUCBM shall, in conformity with applicable laws and regulations of the Government of the People’s Republic of China on

confidentiality and by taking into account international practice, determine in consultation with the Contractor the

confidentiality periods for which the Contract and all documents, information, data and reports related to the CBM

Operations within the Contract Area shall be kept confidential.

21.2 Without the written consent of the other Party, no Party to the Contract shall disclose, during such confidentiality periods,

the Contract, documents, information, data and reports referred to in Article 21.1 herein or any other information regarded

by JMC as confidential, to any Third Party except the Third Parties specified in Article 21.5 herein and to any Affiliate not

directly connected with the implementation of the Contract, and no Party to the Contract shall otherwise transfer, donate,

sell or publish them in any way within the confidentiality periods. However, CUCBM may furnish the following original

data and information or interpretation thereof with respect to the Contract Area to the relevant Third Parties:

(a) original data and information held by CUCBM for over two (2) years; and

(b) interpretations of original data and information, which have been held by CUCBM for over five (5) years.

45



CUCBM shall require relevant Third Parties to undertake to keep confidential the aforesaid data, information, and

interpretations thereof furnished to them by CUCBM.

CUCBM shall, in conformity with relevant provisions of laws and regulations of the People’s Republic of China and

requests of relevant government departments and units, provide them with all documents, information, data and reports as

mentioned herein.

21.3



During the term of the Contract and after the termination of the Contract, CUCBM shall not disclose to any Third Party

any patent, know-how or proprietary technology transferred to CUCBM by the Contractor without the written consent of

the Contractor except for any technology, the patent of which has expired and any proprietary and confidential technology

which has entered the public domain.



21.4



After the termination of the Contract or after any assignment of rights and/or obligations of the Contract under Article 22

hereof, the Contractor and any assignee shall, within the confidentiality periods, continue to be obliged to keep confidential

documents, information, data and reports mentioned in Article 21.2 herein except for official documents and information

published with the consent of the Parties.



21.5



For the implementation of the Contract, CUCBM and each company comprising the Contractor may furnish the necessary

documents, information, data and reports to Affiliates related to the CBM Operations. CUCBM and each company

comprising the Contractor may, after review by JMC and CUCBM, furnish the necessary documents, information, data and

reports to the Third Party related to the CBM Operations. The Third Parties include:



21.5.1 Banks or other credit institutions from which financing is sought by any Party to the Contract for the implementation of the

Contract;

21.5.2 Third Parties which provide services for the CBM Operations, including Subcontractors and other service contractors; and

21.5.3 An assignee or assignees to whom the rights and/or obligations under the Contract may be assigned.

21.6



Necessary information, documents, data and reports may be furnished by the Parties or an Affiliate of the Parties related to

CBM Operations in accordance with the laws of their home countries to the governments and stock exchanges, provided

that the Parties report to JMC in advance.



21.7



CUCBM and each company comprising the Contractor when furnishing the documents, information, data and reports to

Third Parties and Affiliates as mentioned in Article 21.5 herein shall require them to assume the confidentiality obligations

as set forth herein, or shall bear full responsibility for any violation thereof.

46



Article 22

Assignment

22.1 Any company comprising the Contractor may, after notice in writing to CUCBM, assign part or all of its rights and/or

obligations under the Contract to any of its Affiliates after the first phase of the Exploration Period. Such assignment, within

sixty (60) days after receiving the notice, shall be approved by CUCBM, provided that the company comprising the

Contractor who assigns, shall perform the assignment in accordance with the following provisions:

(a) Any company comprising the Contractor who assigns, shall submit to CUCBM copies of a written agreement on the

corresponding part of its rights and/or obligations to be assigned;

(b) Any company comprising the Contractor who assigns, shall guarantee in writing to CUCBM the performance of the

assigned obligations; and

(c) No such assignment shall interfere with the performance of the CBM Operations or affect the organizational structure.

22.2 The Contractor may assign part or all of its rights and/or obligations under the Contract to any Third Party after the first

phase of the Exploration Period, provided that such assignment shall be agreed by CUCBM in advance and approved by the

Ministry of Commerce of the People’s Republic of China. However, if the conditions offered by CUCBM are the same,

CUCBM shall have the right of first refusal in respect of such assignment to be exercised by CUCBM in writing within

sixty (60) days upon receipt of notice from the Contractor to assign to a Third Party, unless otherwise agreed upon by the

Parties.

22.3 Upon notice to the Contractor, CUCBM may authorize its Affiliates to implement the Contract, but CUCBM shall remain

responsible for the performance of the Contract.

22.4 With prior consent of the Contractor and subject to the approval of the Ministry of Commerce of the People’s Republic of

China, CUCBM may assign part of its rights and/or obligations hereunder to any Third Party, provided that such assignment

shall not interfere with the performance of CBM Operations.

Article 23

Health, Safety and Environmental Protection

47



23.1 In the performance of the CBM Operations, the Operator shall be subject to the laws, decrees, regulations and standards on

environmental protection and safety promulgated by the Chinese Government and carry out the operations according to

international practice. The Operator shall make its best efforts to protect farmland, aquatic resources, forest reserves and

other natural resources, and prevent pollution and damage to the atmosphere, rivers, lakes, groundwater, harbors, other land

environments and ecological environment and secure the safety and health of the operating personnel. The Operator shall use

all reasonable endeavors to eliminate promptly any pollution occurring as a direct result of and in the performance of the

CBM Operations and minimize its consequences. Economic losses caused by any pollution shall be charged to the Joint

Account, unless otherwise provided in Article 8.4 hereof.

23.2 When competent authorities under the Chinese Government assign a person to inspect environmental protection, health and

safety within the scope of the CBM Operations according to the laws, decrees, rules and regulations of the People’s Republic

of China, the Operator shall provide all necessary facilities and assistance to enable the inspectors to carry out such

inspection smoothly.

23.3 In the performance of the CBM Operations in any fixed fishing net casting area and /or aquatic breeding area, the Operator

shall make prior contact with the relevant authorities of the Chinese Government provided that upon the Operator’s request,

CUCBM shall promptly assist Operator in making such contacts.

23.4 Before the commencement of Exploration Operations, the Operator shall provide CUCBM with report on the possible impact

of the Exploration Operations on the health, safety and environment and measures to be adopted. Before the end of

Exploration Operations, the Operator shall submit an assessment report to CUCBM on the impact of health, safety and

environment by the results of the Exploration Operations. The two reports shall be submitted to the relevant Chinese

authorities for their review and approval according to the Chinese laws.

The Operator shall establish and implement plans and procedures on health, safety and environment protection during CBM

Operations, and shall carry out the strict management on its Subcontractors with respect of the health, safety and

environment. The Operator shall establish the emergency procedure and report to JMC in a promptly and accurately manner

any accident on health, safety and environment.

The above plans and procedures on health, safety and environment protection shall form an integral part of Overall

Development Program.

23.5 In order to ensure the provisions with respect of the health, safety and environment protection under this Contract to be

complied with, the Operator

48



shall conduct at least once in each Calendar Year a regular assessment on the health, safety and environment protection and

submit the assessment report to JMC. The regular assessment on health, safety and environment shall be itemized as a single

item and incorporated in the Work Program and Budget. Each Party to the Contract shall have the right to participate in such

regular assessment on health, safety and environment provided a written notice given to the Operator thirty (30) days prior to

such assessment. The expenses incurred therefore shall be charged into the Joint Account.

23.6 The Operator shall, subject to Article 4.6.2, after the completion of various CBM Operations, to the extent reasonable and

practicable, level or restore or reclaim the land of the operating sites to the condition existing at the commencement of

implementation of the Contract in accordance with the relevant rules and regulations.

Article 24

Force Majeure

24.1 No Party to the Contract shall be considered in default of the performance of any of its obligations hereunder, if any failure

to perform or any delay in performing its obligations is in conformity with all the events described as follows:

The performance of any obligations hereunder is prevented, hindered or delayed because of any event or combination of

events which could not be foreseen and/or which is beyond the control of such Party; and

Any such event or combination of events is the direct cause of preventing, hindering or delaying of such Party’s performance

of its obligations hereunder; and

When any such event or combination of events has occurred, such Party has taken all reasonable actions to overcome any

cause that prevents, hinders or delays performance of its obligations and shall in so far as is practicable continue to perform

its obligations hereunder.

24.2 Notice of any event of force majeure and the conclusion thereof shall forthwith be given to the other Party by the Party

claiming force majeure.

24.3 In the event of force majeure, the Parties shall immediately consult in order to find an equitable solution thereto and shall use

all reasonable endeavors to minimize the consequences of such force majeure.

24.4 If the CBM Operations in the Contract Area are partially or entirely suspended as a result of the force majeure referred to in

Article 24 herein, the period of the CBM Operations may be extended by a period corresponding to such suspension. Within

fifteen (15) days following the end of each Calendar

49



Year, the Operator shall report to JMC in writing on the suspension of the CBM Operations caused by force majeure, if

any, during the preceding Calendar Year.

24.5



Should, however, the force majeure condition continue for a period of twenty-four (24) consecutive months, then, in such

event, Contractor shall have the option to terminate this Contract without any further liability.



24.6



The provision of this Article 24 shall not apply in the case of default in the making of any payment of money under the

Contract.



Article 25

Consultation and Arbitration

25.1



The Parties shall make their best efforts to settle amicably through consultation any dispute arising in connection with the

performance or interpretation, or validity of any provision hereof.



25.2



Any dispute mentioned in Article 25.1 herein that has not been settled through such consultation within ninety (90) days

after the dispute arises may be referred to arbitration at the request of and by either Party to the Contract. The arbitration

shall be conducted in accordance with the following provisions:



25.2.1



If agreed upon by the Parties, such dispute shall be referred to arbitration conducted by the China International Economic

and Trade Arbitration Commission in accordance with the arbitration proceeding rules thereof.



25.2.2



If the Parties fail to reach an agreement on the arbitration arrangement mentioned in Article 25.2.1 herein within sixty

(60) days after a Party has requested in writing that a dispute be referred to arbitration, the Parties shall establish an ad

hoc arbitration tribunal to conduct arbitration in accordance with the following provisions:



25.2.2.1 The ad hoc arbitration tribunal shall consist of three (3) arbitrators. The Parties shall each appoint an arbitrator and the

two (2) arbitrators so appointed shall designate a third arbitrator. If one of the Parties does not appoint its arbitrator

within sixty (60) days after the first appointment, or if the two (2) arbitrators once appointed fail to appoint the third

within sixty (60) days after the appointment of the second arbitrator, the relevant appointment shall be made by the

Arbitration Institute of the Stockholm Chamber of Commerce, Sweden.

25.2.2.2 The third arbitrator shall be a citizen of a country which has formal diplomatic relations with both the People’s Republic

of China and the home country of any of the companies comprising the Contractor, and shall not have any economic

interests or relationship with the Parties.

50



25.2.2.3 The place of arbitration shall be determined by the Parties through consultations or, failing the agreement of the Parties

within sixty (60) days after the appointment of the third arbitrator, by the majority of arbitrators of the ad hoc arbitration

tribunal.

25.2.2.4 The ad hoc arbitration tribunal shall conduct the arbitration in accordance with the arbitration rules of the United Nations

Commission on International Trade Law (“UNCITRAL”) of 1976, as amended. However, if the above-mentioned

arbitration rules are in conflict with the provisions of this Article 25, including the provisions concerning appointment of

arbitrators, the provisions of this Article 25 shall prevail.

25.3



Both the Chinese and English languages shall be official languages used in the arbitrage proceedings. All hearing

materials, statements of claim or defense, awards and the reasons supporting them shall be written in both Chinese and

English.



25.4



Any award of the arbitration tribunal shall be final and binding upon the Parties.



25.5



The right to arbitrate disputes under the Contract shall survive the termination of the Contract.



Article 26

Effectiveness and Termination of the Contract

26.1



The Contract shall, after it is signed, be approved by the Ministry of Commerce of the People’s Republic of China. The

date of such approval shall be the effective date of the Contract. However, the Contractor’s obligations shall begin on the

Date of Commencement of the Implementation of the Contract, as defined in Article 1, hereinabove. CUCBM shall notify

the Contractor of the said approval in writing as soon as possible.



26.2



All annexes to the Contract shall be integral parts of the Contract. If there is any inconsistency between the provisions of

the annexes and the main body of the Contract, the main body of the Contract shall prevail. All references to the Contract

thereof refer to the main body of the Contract.



26.3



If in the course of implementation of the Contract, the Parties decide through consultation to make amendment or

supplement to any part of the Contract, a written agreement signed by the authorized representatives of the Parties shall

be required. Such written agreement shall be subject to the approval of the Ministry of Commerce of the People’s

Republic of China should there be any significant modifications hereof. Such agreement shall be regarded as an integral

part of the Contract.



26.4



The Contract shall terminate under any of the following circumstances:

51



26.4.1 Exercise of the Contractor’s election to terminate the Contract under Article 6.3 (c) hereof; or

26.4.2 Failure to discover any commercial CBM reservoir within the Contract Area by the expiration of the exploration period or

the extended exploration period granted under Article 4.3 hereof; or

26.4.3 If there is only one (l) commercial CBM Field in production in the Contract Area, on termination of the production period

of such CBM Field; or

26.4.4 If there are two (2) or more commercial CBM Fields and/or CBM Fields in production in the Contract Area, on termination

of the production period of the CBM Field with the latest termination date; or

26.4.5 At the end of the last day of the thirtieth (30th) Contract Year from the Date of Commencement of the Implementation of

the Contract unless otherwise extended pursuant to Articles 4.5, 4.6.1, or 24.4 hereof.

26.4.6 Upon judgment of the court having jurisdiction, the Contractor ceases to exist in any form.

26.5



Before the expiration of the first phase of the exploration period as specified in Article 4.2 hereof, the Contractor shall not

propose termination of the Contract unless the Contractor has fulfilled the minimum exploration work commitment for the

first phase of the exploration period ahead of time.



26.6



If any Party to the Contract commits a material breach of the Contract, the other Party to the Contract shall have the right

to demand that such breach be remedied within a reasonable period of time. If such breach is not remedied satisfactorily

within such period of time, the complaining Party, arising from such breach shall have the right to terminate the Contract

by giving ninety (90) days written notice to the other Party. However, no Party shall be deemed to have committed a

material breach in the performance of any provision of the Contract concerning which there is any dispute between

CUCBM and the Contractor, until such time as all disputes concerning such provision including any contention that a Party

is in material breach, have been settled as provided in Article 25 hereof. During the time of such dispute, CUCBM and the

Contractor shall continue to carry out their responsibilities pursuant to the Contract, which shall remain in full force and

effect.



26.7



Notwithstanding the abovementioned provisions, after receiving the notice in writing by CUCBM specifying the default

and the subsequent failure of the Contractor to cure the default within ninety (90) days, CUCBM shall have the right to

terminate the Contract in case the Contractor, fails to perform any of the following obligations:



26.7.1 Payment of the signature fee pursuant to Article 29.5 hereof; or

52



26.7.2 Fulfillment of the minimum exploration work commitment and expected minimum exploration expenditures of each year

for any phase of the exploration period as provided in Article 6.2 hereof, or

26.7.3 Payment on schedule of the assistance fee pursuant to Article 5.2.14.3 of the Annex II attached hereto, payment on

schedule of the personnel costs and other expenses pursuant to Article 18.3.1 hereof and Annex III attached hereto as well

as training of the Chinese Personnel pursuant to Article 16.6 hereof.

Article 27

The Applicable Law

27.1 The validity, interpretation and implementation of the Contract shall be governed by the laws of the People’s Republic of

China. Failing the relevant provisions of the laws of the People’s Republic of China for the interpretation or implementation

of the Contract, the principles of the applicable laws widely used in CBM resources countries acceptable to the Parties shall

be applicable.

27.2 If a material change occurs to the Contractor’s economic benefits after the effective date of the Contract due to the

promulgation of new laws, decrees, rules and regulations or any amendment to the applicable laws, decrees, rules and

regulations of the People’s Republic of China, including any local governments, the Parties shall consult promptly and

make necessary revisions and adjustments to the relevant provisions of the Contract in order to maintain the Contractor’s

normal economic benefits hereunder.

Article 28

Language of Contract and Working Language

28.1 The text of the Contract, annexes and supplementary documents attached hereto shall be written in both Chinese and

English, and both versions shall have equal force and effect.

28.2 The Parties agree that both Chinese and English shall be used as working languages. After the effective date of the Contract,

technical documents and information concerning the CBM Operations hereunder including Work Programs and Budgets

shall, in general, be written in English except for technical documents and information available previously and received

from Third Parties.

Unless otherwise agreed by CUCBM, in consultation with the Contractor, documents and information in respect of

administration shall be written in both Chinese and English. Forms for production and other reports and records shall be

printed with headings in both Chinese and English and may be filled

53



out in either Chinese or English.

Article 29

Miscellaneous

29.1 All notices and documents required hereunder shall be deemed to have been properly given and delivered to either Party to

the Contract only when received.

29.2 Notices and documents shall be delivered by hand or sent by mail, registered airmail, facsimile or cable to the address

hereunder specified:

Address of China United CBM Corporation, Ltd.:

China United Coalbed Methane Corporation, Ltd.

A88, Anwai Ave., Beijing 100011

P.R. China

Tel: 86-10-6429-7887

Fax: 86-10-6429-1881

For the attention of:

Mr.

Address of the representative of the Contractor:

Pacific Asia Petroleum LtdNo. B-118 Jianguo Ave

The Exchange Building

Beijing. 100022 China

Tel.: 86-10- 6567-5587

Fax: 86-10- 6567-5587 (extension:8002)

For the attention of: Jamie Tseng

29.3 Either Party to the Contract may change its address or representative by a written notice to the other Party to the Contract.

29.4 Companies comprising the Contractor have the following percentages of participating interests as of the effective date of the

Contract:

Pacific Asia Petroleum Ltd., one hundred percent (100%)

Subject to Article 29.6 herein, the rights and obligations of each company

54



comprising the Contractor hereunder may, as between themselves, be varied by the operating agreement between such

companies and the Contractor shall advise CUCBM in writing of any expected variation and, thereafter, of the actual

variation. If such variation leads to the transfer of the operatorship, or the companies comprising the Contractor have made a

decision to change the Operator, the Operator referred to in Article 8.1 hereof may be replaced after obtaining a written

consent from CUCBM.

29.5 The Contractor shall pay CUCBM a signature fee of three hundred thousand U.S. dollars (US $ 300,000 ) in accordance with

the following schedule, and such signature fee shall, in no case, be charged to the Joint Account, nor be deemed recoverable

costs.

(a)



One hundred fifty thousand U.S. dollars (US $ 150,000)within thirty (30) days from the effective date of the Contract;



(b)



One hundred fifty thousand U.S. dollars (US $ 150,000) within thirty (30) day of commencement of the first development

period entered into by Contractor.



29.6 Companies comprising the Contractor signing the Contract with CUCBM agree to undertake the obligations of the

Contractor under the Contract jointly and severally.

29.7 Whenever alternative interpretations of the Contract are possible subject to Article 27.1 hereof, CUCBM and the Contractor

agree that preference shall be given to interpretations that will facilitate and promote the intent of the Contract.

29.8 It is the express and agreed intention of CUCBM and the Contractor that the terms and conditions of the Contract shall be

applied, and that the grant of any consents required hereunder shall be given by the Parties in a manner and under conditions

which are at all times reasonable and in line with international CBM industry practice.

29.9 No waiver by any Party of any one or more defaults by another Party in the performance of the Contract shall operate or be

construed as a waiver of any preceding or future default or defaults by the same Party, whether of a like or of a different

character. Except as expressly provided in this Contract, no Party shall be deemed to have waived, released or modified any

of its rights under the Contract unless such Party has expressly stated, in writing that it does waive, release or modify such

right.

In witness whereof, THIS CONTRACT is signed in Beijing by the authorized representatives of the Parties hereto on the first

above-mentioned date.

CHINA UNITED CBM CORPORATION,

LTD.



Pacific Asia Petroleum Inc.



By: /s/ Sun Maoyun

Sun Maoyun



By: /s/ Frank C. Ingriselli

Frank C. Ingriselli

55



Annex I

Geographical Location and Coordinates of the Connecting Points of the Boundary Lines of the Contract Area

1



Annex II

Accounting Procedure

Contents

Article



1



General Provisions



2



Definitions



3



Cash Calls



4



Accounting and Management of Material



5



Expense Accounting



6



Recovery of Costs and Deemed Interest



7



Accounting Reports



8



Audit



9



Transfer Procedure of the Joint Account

2



Annex II

Accounting Procedure

Article 1

General Provisions

1.1 This Accounting Procedure is an integral part of the Contract.

The definitions set forth in Article 1 of the Contract are equally applicable to this Accounting Procedure. The definitions and

provisions in this Accounting Procedure have the same force and effect as those in the Contract. If the provisions in this

Accounting Procedure are in conflict with those in the Contract, the provisions in the Contract shall prevail.

1.2 Purpose: The purpose of this Accounting Procedure is to establish equitable control methods for determining charges and

credits applicable to the CBM Operations according to the relevant provisions of the Contract, including the guidelines for

accounting settlements in respect of managing funds and materials, financing and Accounting Records, and for compiling

accounting statements.

The Operator shall neither gain nor lose in relation to the other Parties to the Contract by means of the fact that it acts as the

Operator.

1.3 Accounting methods: The double-entry accrual method of accounting shall be used in this Accounting Procedure.

1.4 Working language: Chinese or both Chinese and English shall be used as the working languages for the Accounting Records

and analyses of financial conditions in respect of the Joint Account, at the Operator’s option.

1.5 Currency for accounting: U.S. dollars shall be the unit of currency for accounting in the Joint Account and shall be the

currency for the investments and reimbursements under the Contract. In case currencies other than U.S. dollars are used to

carry out business activities, the relevant bank accounts and other current asset and current liability accounts shall be kept

both in U.S. dollars and in the currencies used.

1.6 Currency translation: For the purpose of accounting, currency translation entered into the Joint Account shall be made in

accordance with following guidelines:

The rate of exchange to be used for the conversion into U.S. dollars of cash calls received in Renminbi shall be the mid-rate

of exchange applicable to any individual or commercial entity quoted by the People’s Bank of China at 11:00 a.m. on the date

of receipt of such cash in the Operator’s bank account(s). If the relevant date is a non-business day of the People’s Bank of

3



China, the rate quoted on the previous business day by the People’s Bank of China shall apply.

All other transactions recorded in the Joint Account which are made in Renminbi shall be translated into and recorded in

U.S. dollars at the rate of exchange as quoted above on the last business day of the previous month, while those transactions

which are made in currencies other than Renminbi and U.S. dollars shall be recorded in U.S. dollars at the actual cost in U.S.

dollars of effecting the transaction.

Neither CUCBM nor the companies comprising the Contractor shall experience an exchange gain or loss, at the expense or

benefit of the other Party.

The Operator shall make its best efforts to minimize any exchange loss.

All gains or losses from currency conversion or translation shall be recorded in the Joint Account.

1.7



Foreign exchange business: foreign exchange business related to the CBM Operations shall be made in accordance with

relevant regulations for foreign exchange control and rules for the implementation of such regulations of the People’s

Republic of China, provided that the Contractor can:



1.7.1 Open and maintain bank accounts, both inside and outside of the People’s Republic of China as may be required for CBM

Operations agreed upon by CUCBM, as provided in Article 3 of this Accounting Procedure.

1.7.2 Buy and sell foreign exchange at the official foreign exchange rate applicable to all and any individual or commercial entity

quoted by the State Administration of Foreign Exchange Controls of the People’s Republic of China.

1.7.3 Retain and freely dispose of Renminbi or foreign exchange generated hereunder, but Contractor must remit back to the

People’s Republic of China the amounts needed to pay taxes when they are due and payable according to the tax laws and

regulations of the People’s Republic of China, and other obligations when due and payable in the People’s Republic of

China.

Remit abroad the foreign exchange proceeds from Contractor’s sales of CBM and Liquid Hydrocarbons sold in the People’s

Republic of China, but Contractor must pay taxes when due and payable according to the tax laws and regulations of the

People’s Republic of China.

1.7.4 Make disbursements directly from internationally recognized bank accounts inside or outside of the People’s Republic of

China for payments of salaries and wages of Expatriate Employees, purchased materials and various items of labor and

service charges from Affiliates of Contractor and foreign Subcontractors to carry out the CBM Operations as specified in the

Contract,

4



after taxes are withheld according to the provisions of the tax laws and regulations of the People’s Republic of China.

1.7.5 Transfer Renminbi according to the needs of the CBM Operations between Renminbi currency accounts opened within the

People’s Republic of China.

1.7.6 Deposit foreign exchange receipts in the Bank of China in the original currency and such deposits need not be converted to

Renminbi until needed.

1.7.7 Remit abroad excess foreign exchange or Renminbi, after reconversion to foreign exchange, advanced or generated by the

investing Parties and not expended or not to be expended and held by the Contractor for the investing parties in proportion

to the extent of their respective percentage interests in such excess, provided that CUCBM’s share of such excess shall be

returned to CUCBM.

1.8



Accounting Records and Statements



1.8.1 All Accounting Records related to the CBM Operations shall be established and maintained by the Operator within the

territory of the People’s Republic of China.

1.8.2 All vouchers, accounts, books and statements shall be prepared in accordance with the CBM Operations Accounting System

established by CUCBM and the Contractor through consultation pursuant to the Accounting Regulations of the People’s

Republic of China for Enterprises with Foreign Investment.

1.8.3 Annual accounting statements and important accounting books, including asset records, cash or bank journals, general and

subsidiary ledgers, balance sheets, and annual gross CBM production allocation statements shall be maintained for the term

of the Contract as specified in Article 4.7 of the Contract, or for any further period if required by the laws and regulations of

the People’s Republic of China. Other accounting vouchers and books shall be kept for fifteen (15) years. Quarterly and

monthly statements shall be maintained for five (5) years.

Upon the expiration of the custody period, a list shall be made of the accounting files which are to be disposed of. Disposal

of the accounting files shall only be made after the consent of CUCBM. The list of the accounting files disposed of shall be

maintained with the annual accounting statements.

5



Article 2

Definitions

The terms used in this Accounting Procedure shall have the definitions ascribed to them as follows:

2.1 “Accounting Records” means all accounting books, source documents, original vouchers, approved documents, analytical

data, work papers and accounting statements maintained for the CBM Operations.

2.2 “Accounting System” means the CBM Operations Accounting System prepared by CUCBM and the Contractor through

consultation pursuant to the Accounting Regulations of the People’s Republic of China for Enterprises with Foreign

Investment, specifying the accounting titles to be used by the Operator and instructions for implementation, forms and

contents of various accounting statements and their preparation methods, including a material classification section, a

definition of Controllable Material, standards for itemizing assets and the provisions for fixed asset accounting.

2.3 “Material” means materials, tools, facilities, equipment and consumables procured, leased or otherwise acquired and held for

the CBM Operations.

2.4 “Joint Account” means accounts established by the Operator for the implementation of the Contract to record all debts and

credits related to the CBM Operations.

2.5 “Controllable Material” means the Material referred to in the Accounting System described in Article 2.2 of this Accounting

Procedure.

2.6 “LIBOR” means the seven-day term London Inter-Bank Offered Rate for U.S. dollars for similar amounts to the sums in

question, quoted by Midland Bank in London at 11:00 a.m. on the first business day of the relevant period. If the Midland

Bank is unable or fails to supply such daily quotation, that of Barclays Bank International Ltd. will be used, and failing this,

National Westminster Bank PLC’s quotation will be used.

2.7 “Investing Party” means any party that is contributing the funds for the CBM Operations in accordance with its participating

interest determined pursuant to the relevant provisions of the Contract.

6



Article 3

Cash Calls

3.1



Except as otherwise provided in the Contract, the Contractor shall provide all the exploration costs for the Exploration

Operations according to the provision of Article 12.1.1 of the Contract and all the Investing Parties shall provide the

development costs for the Development Operations in proportion to their respective participating interests as provided in

Article 12.1.2 of the Contract. In accordance with each approved annual budget, the Operator shall issue monthly cash call

notices to each Investing Party to provide the Operator with funds to cover the planned expenditures of the next month.

Whether or not the cash call notices for the exploration costs are to be issued shall be at the option of the Operator.



3.2



Development Operations cash call and default.



3.2.1 According to the needs of the CBM Operations, the Operator shall regularly issue monthly cash call notices within the

amount of approved annual budget to request each Investing Party to respectively make advances as specified by the

Operator. The Operator shall, before twenty (20) days prior to the commencement of each month, issue cash call notices for

the development costs and each Investing Party shall provide its percentage share of funds according to the requirement and

within the time limit specified in the cash call notice. However the payment due date specified in the cash call notices shall

not be earlier than the first working day of the month for which cash is called. Each Investing Party shall transfer its

percentage share of funds to the Operator’s bank account(s) established by the Operator particularly for the CBM

Operations. Such bank account(s) will be interest bearing account(s) if possible. Such interest shall be credited directly to

the respective CUCBM and Contractor accounts as applicable, in accordance with their respective percentage of

participating interest.

Any excessive advances made by each Investing Party for any month shall be adjusted in the next cash call.

In case that the Operator, owing to the needs of the Development Operations, has to incur expenditures which are unforeseen

in the cash call for any month, written notices shall be issued to all the Investing Parties who shall finance their own shares

for additional amount within ten (10) days following the receipt of the written notice.

3.2.2 Interest shall be paid by CUCBM or the companies comprising Contractor failing to pay its share of funds on the due date

specified in the cash call at LIBOR on the delinquent date plus five percent (5%) on the delinquency of less than one

(1) month and thereafter at the average LIBOR rate ruling throughout each subsequent month plus five percent (5%), such

interest being compounded on a monthly basis throughout the period of the delinquency. The non-defaulting party or parties

shall make up the delinquent portion on

7



behalf of the defaulting party or parties. When the defaulting party or parties pay cash to meet both the delinquent portion

and accrued interest thereon, the Operator shall reimburse the non-defaulting party or parties who made up the delinquent

portion.

All amount advanced by the non-defaulting party or parties plus accrued interest not reimbursed by the defaulting party shall

constitute a debt due from the defaulting party or parties to the non-defaulting party or parties who shall be entitled to all

remedies at law and equity. The Operator, or any non-defaulting party, if the Operator is a defaulting party, on behalf of the

non-defaulting party or parties is entitled to take and sell the defaulting party’s or parties’ share of the Annual Gross

Production of CBM and Liquid Hydrocarbons and apply the proceeds of the sale of such CBM and Liquid Hydrocarbons

against all sums due and payable by the defaulting party or parties including accrued interest. Any excess funds remaining

from such proceeds after deduction of all amounts due, including interest and the costs, charges and expenses incurred by

the Operator, or any non-defaulting party, if the Operator is a defaulting party, in connection with such sale, shall be paid

over to the defaulting party. Any deficiency remaining due after deducting the proceeds of any such sale shall remain an

obligation of the defaulting party or parties and may be collected as any other debt.

3.3



Each monthly cash call notice shall clearly indicate the following information:



3.3.1 Annual development costs to be shared by each Investing Party as shown in the approved annual budget.

3.3.2 Amount of funds advanced by each Investing Party at the end of the month prior to the month in which the cash call notice

is prepared and the actual expenditures and the actual balance (i.e. funds unused) recorded in the Joint Account,

accompanied by the bank statements related to the Joint Account for the previous month.

3.3.3 Amount of funds to be called from each Investing Party in the month for which the funds will be used and the estimated

amounts of funds to be called in the following two (2) months.

3.3.4 The date when funds are to be provided, the amount of funds, currency, account number, name of the account, the recipient

bank and its address.

3.3.5 Where applicable, the participating Parties shall pay their participating interest share of such invoice, via wire transfer,

within thirty (30) days of receipt of such invoice (“due date”). In the event a Party falls to pay such participating interest

share by such due date, the Parties shall be subject to the provisions of Article 3.2.2 of the Annex II and the other provision

of the Contract.

3.4



On the Date of Commencement of Commercial Production of any CBM Field, any development investment for the CBM

Field advanced by the Investing

8



Parties which has not been expended or will not be expended shall be returned to each of the Investing Parties in proportion

to its share.

3.5



In accordance with Article 12.1.3 of the Contract, the cash for the Production Operations undertaken by the Parties jointly

and approved by JMC shall be provided by all the Investing Parties to the Contract in proportion to their respective

participating interests in the development costs and shall bear no Deemed Interest. Based on the needs of the Production

Operations, the Operator may make timely adjustment of the amount of cash to be provided by all the Investing Parties to

the Contract. The Operator shall issue quarterly cash call notices to call for cash for the Production Operations. In proportion

to its share, each Investing Party shall respectively provide advances on a monthly basis in accordance with the requirement

and within the time limit specified in the cash call notice of the current month. The default provision specified in Article 3.2

of this Accounting Procedure shall also apply to any cash calls for Production Operations.

In case that the Operator, owing to the needs of the Production Operations, has to incur expenditures which are unforeseen in

the cash call for any month, written notices with explanations shall be issued to all the Investing Parties who shall finance

their own

shares for additional amount within ten (10) days following the receipt of such written notice.



3.6



According to the requirement of the CBM Operations, the Operator shall indicate in any cash call notice the U.S. dollar

equivalent of the total cash called. The Operator shall also specify the amounts of Renminbi and U.S. dollars required as

estimated to make payment. CUCBM shall provide the advance of its own share either in Renminbi or in Renminbi and U.S.

dollars with respect to the amounts called for by the Operator, but CUCBM’s funding in Renminbi shall not exceed the total

amount of Renminbi as indicated and called for by the Operator in any cash call notice. The Contractor shall provide the

advance of its own share in U. S. dollars.



3.7



Provisions for recording the sources of funds:



3.7.1 Funds for exploration costs, development costs and operating costs, when received, pursuant to each cash call shall be

credited against the relevant accounts of the Investing Parties in the Joint Account.

3.7.2 In case CUCBM decides to develop a CBM Field for its sole account pursuant to Article 11.5 of the Contract, or undertakes

any other operation for its sole account, the funds required shall be financed and accounted for separately.

3.7.3 In accordance with Article 6.3 of the Contract, if the Contractor opts to terminate the Contract as provided in Article 6.3

(c) of the Contract or if the phase is the last phase of the exploration period, the Contractor shall, within thirty (30) days

from the date of its decision to terminate the Contract or thirty (30) days from the date of the expiration of the exploration

period, pay CUCBM in U.S. dollars the unfulfilled balance of the minimum exploration

9



work commitment (or of the new commitment) for the exploration phase, converted into cash. The detailed method by which

the unfulfilled balance of the minimum exploration work commitment is converted into U.S. dollars is that the actual average

unit cost of the last portion of a seismic line shot under the Contract or of the last well drilled, excluding the abnormal drilling

costs such as those of the sidetrack, fishing, severe loss of mud circulation, etc. (i.e. U.S. dollars/kilometer of seismic line;

U.S. dollars/meter of drilling footage), is multiplied by the unfulfilled amount of the minimum exploration work

commitment. The formula for such calculation is as follows:

I = Ac X Pu

in which:

I = converted cash amount of the unfulfilled balance of the minimum exploration work commitment;

Ac = actual average unit cost of the last portion of a seismic line shot or of the last well drilled; and

Pu = the unfulfilled amount of the minimum exploration work commitment (The unfulfilled amount of the seismic line shot is

the difference between the kilometers specified in Article 6.2 of the Contract and actual kilometers shot. The unfulfilled

footage of an unfulfilled Wildcat is the designed total depth of the Wildcat specified in accordance with Article 6.2 of the

Contract).

Article 4

Accounting and Management of Material

4.1 Procurement of Material:

The procurement of Material shall be implemented in accordance with the procedure specified in Articles 15.1 and 7.6 of the

Contract. In order to prevent overstocking of Material, the Operator shall use all reasonable best efforts to ensure that the

procurement of Material shall be made in accordance with the Material procurement plans and that the quality of Material

conforms to specifications and prices are fair and reasonable. The Operator does not warrant the Materials furnished beyond,

or back of, the supplier’s or manufacturer’s guarantee.

4.2 Costs of procuring Material:

The costs of Material purchased shall be the invoice prices less discounts plus related transportation and other expenses,

including expenses for freight to the destination, insurance premiums commensurate with the Material covered, fees of

forwarding agents, duties, fees, handling expenses from shipside to and within any water or land terminal warehouse or yard,

and any other reasonable expenses actually paid and expenses of inland transportation.

10



4.3 The provisions and procedures of Article 15.1 and Article 7.6 of the Contract and the following provisions shall be applied

for pricing Material furnished from the stocks of the Parties and/or their Affiliates for use in the CBM Operations:

(1) New Material:

New Material shall be priced on the basis of current market value plus expenses in moving such Material directly to the

job-site where Material is used.

(2) Used Material:

(a) Material which is in sound and serviceable condition and is suitable for reuse without reconditioning shall be

priced by the Parties, and the ceiling price shall not exceed seventy-five percent (75%) of the current market value

of new Material.

(b) Material which, after being reconditioned, will be further serviceable for its original function shall be priced by the

Parties, and the ceiling price shall not exceed fifty percent (50%) of the current value of new Material.

(c) Used Material which cannot be classified as (a) or (b) above shall be priced by the Parties through discussions at a

value commensurate with its use.

(d) If the Operator wishes to use a method other than the above for pricing used Material, such other method shall be

agreed upon in advance by the Parties through consultations.

4.4 Price determination and leasing expense calculation method for properties purchased or leased from other contract areas:

The Operator may lease equipment and facilities and purchase Material and fuel from other contract areas within the People’s

Republic of China. The Operator shall charge the leasing expenses or purchase price as agreed upon by the Operator and its

suppliers. Such leasing expenses or purchase prices shall not exceed those currently prevailing in similar contract areas.

4.5 For certain Material which is in short supply in the world markets and difficult to procure at published market prices and the

lack of which will hinder normal operations, the Operator may, after the approval of JMC, purchase such Material urgently

needed by the CBM Operations and charge actual purchase costs to the Joint Account.

4.6 Disposal of Equipment and Material:

11



The Operator shall not dispose of or sell Material with book value exceeding Twenty Thousand U.S. dollars (U.S. $20,000)

without the prior consent of the Parties. The Operator shall use all reasonable endeavor to minimize losses in the disposal of

or sales of such Material.

Sales of properties to Third Parties or Affiliates shall be recorded in accordance with actual sales income. No guaranty or

warranty for Material sold or disposed of under this Article shall be given by the Operator to any purchaser.

4.7 Accounting for Material:

The costs of Material which is procured by the Operator and is directly used at the job-site shall be charged to the respective

accounts of exploration costs, development costs or operating costs at actual purchase prices (as defined in Article 4.2 herein)

and on the basis of the use of Material. Should such Material subsequently be used for other purposes, the relevant charges

shall be transferred from the original cost accounts to the appropriate cost accounts.

Material for general use which is first stored in warehouses shall be subject to inventory control procedures. The quantities,

unit prices and total value shall be recorded for Material in inventory using perpetual inventory methods. Material in stock

shall be priced at purchase costs and the Operator, upon the commencement of or during the Contract period, has the freedom

to choose one of the following pricing methods such as FIFO, weighted average method and moving average method, etc. for

Material to be transferred out of the stock. Accounts for inventory Material shall be regarded as exploration costs,

development costs or operating costs and shall be recovered in accordance with Article 12.2 of the Contract.

At the request of any non-Operator, the Operator shall furnish to the non-Operator a detailed statement of Controllable

Material.

The Operator shall conduct physical inventory of Material in warehouses prior to the annual final accounts or whenever

depending upon the actual situation. The Operator shall give a written notice to JMC sixty (60) days before the date of

proposed physical inventory in order to allow time for participation by the non-Operators and failure to participate by any

non-Operator in the physical inventory shall be regarded as approval of the physical inventory conducted by the Operator.

If any gain or loss is found as a result of the physical inventory, the Operator shall compile a detailed statement of the gain or

loss and attach to it an explanation for the gain or loss, which shall be submitted to JMC for examination and approval.

4.8 In accordance with Article 17.1 of the Contract, the Operator shall exercise strict control over the fixed assets of the CBM

Operations and set up accounts and record cards, and shall conduct physical inventory of the fixed assets at

12



the year-end or whenever depending upon the actual situation to make sure that the book records, card records and physical

fixed assets are in conformity. In case that any damage or loss arises to the fixed assets, the Operator shall determine the

reasons and submit them to JMC for examination and approval.

Article 5

Expense Accounting

5.1



Rules for accounting



5.1.1



According to the provisions of Articles 12.1.1, 12.1.2 and 12.1.3 of the Contract, all development costs and operating costs

of the Parties as well as the Contractor’s exploration costs shall be recorded in the Joint Account separately.

The Operator shall establish and maintain three separate accounts, namely:



5.1.1.1 Exploration costs account,

5.1.1.2 Development costs account

5.1.1.3 Operating costs account

In which all charges and costs as classified pursuant to Articles 5.2 and 5.3 of this Accounting Procedure shall be

reflected.

5.1.2



If either CUCBM or the Contractor, in accordance with Article 11.5, or Article 12.1.2 of the Contract, makes the decision

to develop a CBM Field for its sole account or to undertake any other operation for its own account, the relevant costs

shall be accounted for separately.



5.1.3



All items related to the CBM Operations such as discounts, deductions, allowances, interest income, gains from various

services, indemnities from insurance and other miscellaneous income by the Operator, shall be credited to the relevant

costs accounts.



5.1.4



All direct services or research work (including personnel) provided by the superior organizations or Affiliates of CUCBM

or of the Contractor and by the Third Parties for the CBM Operations shall be subject to the advance work order

procedures on the basis of the annual budget or of the approval by JMC and shall be charged to the Joint Account after

verification of relevant invoices.

The work order procedure shall be established through consultations at JMC meetings by both Parties within three

(3) months as of the Date of Commencement of the Implementation of the Contract. The rates charged for direct services

or research work (including personnel cost) provided by the

13



superior organization or Affiliates of CUCBM or of the Contractor shall be competitive when compared with the rates of

similar services furnished by the Third Parties. The Operator shall, in accordance with Article 15 of the Contract, give

priority to use direct services of research work (including personnel) provided by CUCBM.

5.2



Cost items:

The following items shall be chargeable to the Joint Account at Operator’s net cost.



5.2.1 Subcontractor charges:

The charges paid to Subcontractors in accordance with contracts signed between the Operator and Subcontractors.

5.2.2 Personnel expenses:

The contents and control of personnel expenses shall be as stipulated in Article 18.3 of the Contract.

5.2.3 Travel and living expenses:

Travel and living expenses paid according to Article 18 of the Contract to the personnel involved in the CBM Operations.

5.2.4 Material expenses:

Expenses paid in accordance with Article 4 of this Accounting Procedure to purchase Material for use in the CBM

Operations.

5.2.5 Relocation and transportation expenses:

Relocation and transportation expenses for the personnel involved in the CBM Operations to be relocated into or out of the

People’s Republic of China and transferred from job-sites to job-sites within the People’s Republic of China.

5.2.6 Maintenance, repair and leasing expenses:

Expenses for maintenance, repair or replacement of the properties used in the CBM Operations and the leasing expenses

paid for leased properties and equipment.

5.2.7 Insurance premiums:

Necessary net payment made for the insurance of the CBM Operations and related costs and expenses, including deductibles

paid in the event of loss pursuant to Article 20.4 of the Contract.

14



5.2.8



Legal expenses:

In order to protect the interests of Parties, all costs or expenses paid for attorney’s fees, litigation or investigation, including

expenses in securing evidences, mediation and settlements. The expenses for handling legal matters incurred for the

interests of any Party to the Contract shall be borne solely by such Party.



5.2.9



Taxes:

All taxes paid according to the tax laws of the People’s Republic of China, except for the income taxes, value added tax

based on production and royalty to be paid by the companies comprising the Contractor or CUCBM and individual income

tax to be paid by employees and withheld by Operator and other related costs.



5.2.10 Energy expenses:

All costs in respect of fuel, electricity, heat, water or other energy used and consumed for the CBM Operations.

The costs of CBM and Liquid Hydrocarbons produced and used in the same CBM Field (provided that the Parties have the

same interest in such Fields) within the Contract Area by the Operator for the performance of the Development Operations

and the Production Operations or for well stimulation or for maintaining the reservoir pressure shall not be charged.

However, the costs of transporting such CBM or Liquid Hydrocarbons to their points of use shall be charged under this

item.

5.2.11 Field office facility charges:

The costs and expenses of establishing, maintaining and operating any offices, camps or housing facilities necessary for the

performance of job-site operations, including a share of the costs of any office used by staff directing such operations

(calculated by apportioning office costs and expenses on the basis of space occupied by such staff).

5.2.12 Communication charges:

The costs of acquiring, leasing, installing, operating, repairing and maintaining communication systems, including radio

and microwave facilities between the Contract Area and the base facilities.

5.2.13 Ecological and environmental protection charges:

The charges for any measures undertaken for the CBM Operations within the Contract Area as required by relevant

statutory regulations formulated by the authorities concerned or pursuant to the programs agreed by the Parties.

15



5.2.14



Service charges:



5.2.14.1 Technical service charges:

The charges paid for services, such as rock specimen analysis, CBM or Liquid Hydrocarbons quality tests, geological

evaluation, data processing, design and engineering, well site geology, drilling supervision, special research programs

and other technical services.

5.2.14.2 General service charges:

Professional consultant charges incurred for the common interests of both Parties and charges for other services to obtain

original data needed for CBM Operations from outside sources, except legal service.

5.2.14.3 CUCBM’s assistance charges:

(a) The charges for the assistance provided by CUCBM for the Contractor to carry out the CBM Operations in

accordance with Article 9 of the Contract.

(b) For all assistance to be provided by the head office organization of CUCBM to the Contractor in the course of the

Exploration, CUCBM shall charge an administrative fee of fifty thousand U.S. dollars (US $ 50,000 ) for each

Calendar Year. If the whole process of the Exploration Operations conducted for any CBM Field in any Calendar Year

is less than twelve (12) calendar months, the administrative fee for such Calendar Year shall be calculated in

proportion to the actual calendar month(s) spent thereon (if the actual time spent thereon in any calendar month is less

than thirty (30) days, the calculation shall be made based on a full calendar month). The aforesaid administrative fee

shall be paid respectively on June 1st and December 1st each Calendar Year, with twenty five thousand U.S. dollars

(US $ 25,000 ) for each time.

(c) For all assistance to be provided by the head office organization of CUCBM to the Contractor in the course of the

Development Operations and the Production Operations before the implementation of a Joint Operating Agreement

by the Parties, CUCBM shall charge an administrative fee of two hundred thousand U.S. dollars (U.S. $200,000) for

each Calendar Year. If the whole process of the Development Operations conducted for any CBM Field in any

Calendar Year is less than twelve (12) calendar months, the administrative fee for such Calendar Year shall be

calculated in proportion to the actual calendar month(s) spent thereon (if the actual time spent thereon in any calendar

month is less than thirty (30) days, the calculation shall be made based on a full calendar month). The aforesaid

administrative fee shall be paid respectively on June 1st and December 1st each Calendar Year, with one hundred

thousand U.S.

16



dollars (U.S. $100,000) for each time.

5.2.15



Damages and losses to the assets:

All costs and expenses necessary for the repair, replacement or supplement of the assets resulting from damages or losses

incurred by fire, flood, storm, theft or any other force majeure causes, excluding the losses specified in Article 8.4 of the

Contract which shall be borne by the Operator alone.



5.2.16



Personnel training costs:

Costs incurred for personnel training pursuant to Article 16 of the Contract-Training of Chinese Personnel and Transfer of

Technology.



5.2.17



Miscellaneous expenses:

Any reasonable miscellaneous expenses needed for the CBM Operations excluded in the above items of expenses, such as

bank charges, books, stationery and conference expenses as well as other reasonable expenses.



5.2.18



Overhead:

Overhead refers to the indirect costs for the managerial and operational services provided by the Operator’s superior

management organizations for the CBM Operations, including management, administration, accounting, treasury, inter

company audit, tax, legal matters, procurement, employee relations, financing, the collection of economic data and costs

for general consultation on such planning, design, research and operational activities, etc. to the extent that these are not

chargeable under Article 5.1.4 of this Accounting Procedure. The overhead for the Exploration Operations shall be

calculated in accordance with the following tiers and based on the sum of the total actual costs from Article 5.2.1 through

Article 5.2.17 and Article 5.2.19 of this Accounting Procedure, but not including CUCBM’s assistance charges under

Article 5.2.14.3 of this Accounting Procedure.

17



Direct Costs for Exploration



Percentage Rate



(U.S. $/Year)



%



First Tier: 0 to 5,000,000



5%



Second Tier: 5,000,001 to 15,000,000



3%



Third Tier: 15,000,001 to 24,000,000



2%



Fourth Tier: over 24,000,000



1%



The overhead rates for the Development Operations shall be agreed upon by the Parties through discussions at the time

when the development budget is being prepared. However, direct costs for development shall not include investments on

special items of construction which shall include, but not be limited to, gas processing facilities, terminal loading and

other facilities of which the overhead rates shall be agreed upon through discussions between the Parties at the time when

the development budget is being made.

When the first budget is prepared for the Calendar Year of Commencement of Commercial Production from each CBM

Field, the overhead rates for production period and its related calculation method shall be agreed upon through

discussions between the Parties.

The costs and expenses for offices established by the Operator within the Chinese territory which are not specifically

dedicated to the CBM Operations shall be allocated by the Operator to the CBM Operations within the Contract Area or

to other beneficiary Parties, including the Contractor, on the basis of actual service time recorded, or may be allocated by

other methods agreed upon by the Parties. The amount of allocation charged to the CBM Operations within the Contract

Area shall be included in the cost item of Article 5.2.19 of this Accounting Procedure. The costs and expenses incurred by

the offices established by the Operator and its superior organizations outside the Chinese territory (excluding costs and

expenses chargeable under Article 5.1.4 of this Accounting Procedure) has been included in the overhead and shall not be

again charged to the Joint Account.

On the last working day of each month, the Operator shall make provision into the Joint Account for the overhead fees for

the current month, calculated on the basis of cumulative actual expenditure for the Calendar Year to that date and

payment shall be made from the Joint Account on the last working day of the following month. The final adjustment of

the overhead shall be made at the end of the Calendar Year in respect to any difference between the actual payment by the

Joint Account and the total overhead for that Calendar Year calculated on the annual cumulative actual investment

expenditure at the end of such year. Any excess shall be refunded and deficiencies made good.

5.2.19



General and administrative expenses:

18



General and administrative expenses refer to the administrative expenses incurred for any offices established by the

Operator within the Chinese territory and for JMC and its subordinate bodies for the performance of the CBM Operations

not otherwise directly chargeable pursuant to Article 5.2 of the Accounting Procedure in accordance with the provisions

of the Contract. Such expenses shall be classified according to minor accounts.

5.2.20



The fees for exploration and mining rights: The fees for exploration and mining rights refer to the two sorts of fees which

CUCBM pays the relevant department of State for owning CBM exploration right of the Contract Area and CBM mining

right of the Development Area within the Contract Area, and which shall be respectively considered as the exploration

costs and development costs (or operating costs). The Contractor shall transfer the specified fee to the bank account of

CUCBM within thirty days from the date on receipt of the written notice for the payments of the exploration right fee or

mining right fee from CUCBM.



5.3



Except as otherwise provided in this Accounting Procedure, the allocation of common costs and expenses for each item of

operations shall be charged in proportion to the exploration costs, development costs and operating costs actually incurred

in each month.



5.4



With respect to the expenditures or excess expenditures as mentioned in Article 10.2.4 (b) of the Contract which are

determined by JMC to be unreasonable, JMC will form a joint team for further investigation to determine whether they

shall be charged to the Joint Account or shall be borne by the Operator alone before the year-end final closing of

accounts.



Article 6

Recovery of Costs and Deemed Interest

6.1



According to the provisions of Article 12.2.2 of the Contract, the exploration costs shall bear no interest.



6.2



The calculation of Deemed Interest on the development costs:

Deemed Interest on the development costs shall be calculated at the specified rate from the first day after the month in

which the development funds of any of the Investing Parties have been received in the Operator’s bank account for the

Joint Account in accordance with the provisions of Article 12.2.3.2 of the Contract.

There are three hundred and sixty-five (365) days in each Calendar Year for the interest calculation and the interest shall

be compounded once each Calendar Year on December 31st based on actual number of days eligible for the interest.

19



Worked Example

Development costs— US $100 received on tenth of March

US $100 received on twentieth of March

The aggregate amount received in March is US $200.

Deemed interest shall be calculated from the first of April through the end of such Calendar Year with a total number of

two hundred and seventy-five (275) days.

Formula: Interest = US $200 X 9% X



275

365



At the end of the year interest is added to the capital and interest thereon accrues until cost recovery is fully achieved, “i.

e.,” interest is compounded at year end.

6.3



Recovery of exploration costs, development costs with Deemed Interest thereon and operating costs.



6.3.1



In accordance with the provisions of Article 12.2.2 of the Contract, the exploration costs shall be recovered from the

CBM Fields within the Contract Area which have been developed and are producing and in which development the

Contractor has participated.



6.3.2



In accordance with the provisions of Articles 12.2.1, 12.2.3.1 and 12.2.3.2 of the Contract, the principal of development

costs and Deemed Interest thereon and operating costs, respectively, of each CBM Field shall be recovered only from the

production of each respective CBM Field.



6.3.3



As at the date of completing sale of CBM, CBM Products, or Liquid Hydrocarbons the Operator shall make separate

records into Joint Account for the appropriate reimbursement of the principal of the exploration costs, development costs

with Deemed Interest thereon and operating costs respectively in accordance with Article 12.2 of the Contract. Written

notices shall be sent by the Operator to CUCBM and the Investing Parties at the same time.



6.4



In accordance with the provisions of Article 18.1 of the Contract, the Operator shall establish complete books for

recording the volume and value of CBM and/or Liquid Hydrocarbons, precisely reflecting the production and the disposal

of the CBM and/or Liquid Hydrocarbons within the Contract term.



6.5



CBM and Liquid production in each Calendar Year for each CBM Field within the production period shall be accounted

according to the allocation proportions specified in Article 13 of the Contract and at the CBM and Liquid Hydrocarbons

price determined pursuant to Article 14.4 of the Contract.

20



Article 7

Accounting Reports

7.1



The Operator shall provide relevant accounting reports and statements based on the Accounting System to CUCBM and

each company comprising the Contractor. Monthly reports shall be submitted within thirty (30) days after the end of each

month, quarterly reports within forty-five (45) days after the end of each Calendar Quarter and annual reports within

forty-five (45) days after the end of each Calendar Year. Monthly, quarterly and annual reports shall be submitted in

accordance with requirements and formats specified in the Accounting System.



7.2



Any Investing Party to the Contract may require the Operator to allow its staff to have access to the Joint Account

Accounting Records relating to the application of expenses in the stipulated custody period, upon giving thirty (30) days

notice but such access shall not unduly hinder the Operator’s normal operations.



Article 8

Audit

8.1



Audits shall be carried out in accordance with Article 18.2 of the Contract.



8.2



The expenses of audits by any non-Operator shall be borne by the non-Operator which conducts the audit. The expenses

for any joint audits conducted by more than one non-Operators shall be allocated in proportion to their respective

participating interests in the development costs.



Article 9

Transfer Procedure for the Joint Account

9.1



When the Exploration Operations are successful and the Contract Area enters the development period, the Operator shall

conduct an inventory and check of all the properties and accounts for CUCBM. When each CBM Field within the

Contract Area goes from development into production, or when the Contractor terminates the Contract, an inventory and

check of all properties and accounts shall be conducted.

If the Contract Area has entered into the development period or the production period, the Operator (after taking an

inventory of all properties taken by all Investing Parties) shall make a proposal to JMC for its approval listing the

remaining equipment and Materials needed for the CBM Operations for the following period and which shall be carried

forward to the next period in book values in the Joint Account. The Operator shall be responsible for the disposal

21



of the equipment and materials not needed for the CBM Operations, the gains or losses derived from such disposal shall

be allocated in accordance with the share of each Investing Party in proportion to the overall investment amount of all

Investing Parties and be adjusted against the original accounts.

If the Contract terminates, the method of an inventory to all of the remaining equipment and Materials shall be the same

as mentioned above, and the gains and losses derived from such disposal shall be adjusted against the accounts of the

original Investing Party in accordance with the above mentioned methods.

9.



In accordance with the provisions of Article 8.7 of the Contract, when the Joint Operators Group (JOG) pursuant to

Article 8.8.1 herein becomes the Operator of all the said CBM Fields within the Contract Area, the former Operator shall

transfer to JOG all of the Accounting Records relating to the Joint Account.



9.



Upon the termination of the Contract, the Operator shall transfer all the relevant vouchers, books and statements over to

CUCBM for custody.



9.4



In conducting the transfer of the accounting books and inventory and check of all the properties in accordance with the

provisions of this Accounting Procedure, the implementation procedure for the transfer and verification, the accounting

files to be transferred and accounting matters to be settled as well as other details shall be agreed upon through

consultation in advance between the Operator and CUCBM. The transfer procedure shall be completed within the time

period agreed upon by the Parties. Thereafter, owing to the needs of any Investing Party to the Contract, CUCBM shall

allow that Party’s staff access to the Accounting Records within the relevant Accounting Records custody period and

provide them with duplicates, if necessary.

22



Annex III

Personnel Costs

Table of Contents

Article



Description



1



General Provisions



2



Employment of CUCBM Personnel



3



Salaries and Wages of Personnel



4



Other Expenses



5



Settlement of Personnel Costs

23



Annex III

Personnel Costs

Article 1

General Provisions

1.1



This Annex is an integral part of the Contract. The definitions set forth in Article 1 of the Contract are applicable to this

Annex. If the provisions in this Annex are in conflict with those in the Contract, the provisions of the Contract shall

prevail.



1.2



The provisions in this Annex with respect to personnel costs shall only be applicable to the following personnel:

(1)



representatives of JMC appointed by CUCBM referred to in Article 7.1 of the Contract;



(2)



personnel of CUCBM in the subordinate bodies of JMC referred to in Article 7.4 of the Contract;



(3)



professional representatives assigned by CUCBM to the Operator’s (Contractor’s) organizations referred to in

Article 7.5 of the Contract; and



(4)



personnel furnished by CUCBM to the Contractor for employment (not including personnel recruited by

CUCBM for the Contractor) referred to in Article 2 hereof.



1.3



Personnel costs referred to in this Annex shall include salaries and wages of personnel specified in Article 3 hereof and

other expenses specified in Article 4 hereof.



1.4



There is a table attached to this Annex, i.e. Table of Salary and Wage Standards of CUCBM Personnel.



1.5



All salaries, costs and expenses with respect to the staff members of CUCBM in the subordinate bodies of JMC, the

CUCBM professional representatives and the CUCBM representatives of JMC to be paid and charged during the

development period and production period shall be determined by the Parties through consultation.

24



Article 2

Employment of CUCBM Personnel

2.1



The Contractor shall employ the Chinese Personnel in accordance with Article 15.2 of the Contract.



2.1.1



When employing the Chinese Personnel, the Contractor shall submit to CUCBM a personnel employment plan, which

shall specify specialties, number of personnel necessary to be employed, and such requirements as to technique,

experience and education, with respect to the personnel to be employed.



2.1.2



CUCBM shall, within sixty (60) days from the date on which it receives the personnel employment plan submitted by the

Contractor, notify the Contractor in a written form of the following:

(1) names and specialties of employee candidates which will be furnished by CUCBM, as well as their health

conditions, working experience and education; and

(2) specialties and number of employee candidates to be recruited by CUCBM for the Contractor and provided by the

Chinese organizations other than CUCBM, as well as recruitment arrangements with respect thereto.



2.1.3



The employee candidates furnished and recruited by CUCBM for the Contractor shall be employed by the Contractor

only when they have passed tests conducted by the Contractor or become qualified after being trained by the Contractor.

The Contractor shall notify CUCBM in writing of the name list of the employee candidates whom it has decided to

employ and whom it has decided not to employ promptly after the tests or training have been conducted. The Contractor

shall explain the reason to CUCBM with respect to the employee candidates whom it has decided not to employ. CUCBM

shall promptly furnish or recruit additional employee candidates.



2.2



The employment contract(s) shall be signed by the Parties for employment of personnel furnished by CUCBM who have

passed the tests conducted by the Contractor or become qualified after being trained by the Contractor. The said

employment contract(s) shall include provisions with respect to employees, such as employment, dismissal, resignation,

production and working assignments, salaries or wages and other expenses, awards and penalties, working time and

vacations, labor insurance and welfare, labor protection and labor discipline. In addition, the Parties shall work out

specific stipulations with regard to the term of the employment contract(s), conditions of termination and modification of

employment contract(s), responsibilities in the case of violation of the contract, and rights and obligations of the Parties.



2.3



The Contractor shall notify CUCBM in writing thirty (30) days before

25



dismissing or replacing any personnel furnished by CUCBM and employed by the Contractor.

However, in the case of defalcation and other serious offense, the Contractor has the right to immediately terminate the

employment contract of such personnel and will promptly advise CUCBM of the reason for such action.

Article 3

Salaries and Wages of Personnel

3.1



Salaries and wages of the personnel referred to in Article 1.2 hereof (hereinafter referred to as “CUCBM Personnel”)

shall be dealt with in accordance with the following provisions:



3.1.1



CUCBM Personnel shall be divided into two parts, i.e. personnel of JMC and employees. Personnel of JMC shall fall into

two categories and employees shall fall into five categories. The salaries and wages of the personnel in each category

shall be classified as three levels. The levels of the personnel in each category shall be determined in accordance with the

number of years of working experience they have. Those who have less than three (3) years of working experience shall

be determined as Level One; those who have three (3) to ten (10) years of working experience shall be determined as

Level Two; and those who have more than ten (10) years of working experience shall be determined as Level Three. The

salary and wage standards with respect to Levels One, Two and Three of each category of personnel are specified in the

Table of Salary and Wage Standards of CUCBM Personnel.



3.1.2



The salary and wage standards specified in the Table of Salary and Wage Standards of CUCBM Personnel are expressed

in U.S. dollars of the same year when this Contract is signed, and shall be increased by 6% from January 1st every year.



3.1.3



The salary and wage standards of personnel at each level in each category specified in the Table of Salary and Wage

Standards of CUCBM Personnel divided by twenty-one point five (21.5) shall be the daily salary and wage standards of

personnel at such level in such category.



3.2



Those CUCBM Personnel who have worked for a full Calendar Month or twenty (20) working days in a Calendar Month

shall be paid in accordance with the monthly salary and wage standards; those CUCBM personnel who have worked for

less than twenty (20) working days in a Calendar Month shall be paid in accordance with the daily salary and wage

standards in Article 3.1.3.



3.3



CUCBM’s chief representative of JMC shall always be paid in accordance with the salary and wage standards with

respect to representatives of JMC. Other CUCBM’s representatives of JMC shall be paid, for the period in which

26



he or she attends JMC meetings, in accordance with the salary and wage standards with respect to representatives of JMC.

If any professional representative (including the secretary) of CUCBM or any CUCBM expert working in expert group(s)

is concurrently a representative of JMC (other than CUCBM’s chief representative of JMC), then he or she shall be paid,

for the period in which he or she attends JMC meetings, in accordance with the salary and wage standards with respect to

representatives of JMC, and for the rest of the period in accordance with the salary and wage standards with respect to his

or her actual post, i.e. the professional representatives (including the secretary) shall be paid in accordance with the salary

and wage standards with respect to the professional representatives, and CUCBM experts working in expert group(s) shall

be paid in accordance with salary and wage standards with respect to the employees specified in the Table of Salary and

Wage Standards of CUCBM Personnel.

3.4



The initial determination and any subsequent modification with respect to any post and level of representatives of JMC

appointed by CUCBM, secretaries, experts and professional representatives of CUCBM shall be made by CUCBM in

accordance with the number of years of working experience and capabilities they have.

The levels of the personnel furnished by CUCBM and employed by the Contractor shall be determined in accordance

with Article 3.1.1 herein, the posts of such personnel shall be determined by the Contractor on the basis of assessment,

and the subsequent promotion and demotion with respect to the posts or levels of such personnel shall be determined by

the Contractor. The aforesaid personnel shall be paid in accordance with the salary and wage standards corresponding to

their new posts from the month following the month in which their posts or levels are promoted or demoted.



3.5



The working time of the secretary, professional representatives and experts assigned by CUCBM to the subordinate

bodies of JMC shall be determined in accordance with the working system of JMC. However, the professional

representatives of CUCBM shall work for no more than five (5) days per week and eight (8) hours per day.



Article 4

Other Expenses

4.1



CUCBM Personnel shall be paid, in addition to the salaries and wages as stipulated in Article 3 hereof, the following

expenses:



4.1.1



Expenses for working meals and other miscellaneous personal expenses based on 21.5 average working days per

Calendar Month are as follows:

Three hundred and one U.S. dollars (U.S. $301.00 ) each month for working meals and other miscellaneous personal

expenses for each CUCBM Personnel.

27



Those CUCBM Personnel who have worked for the full Calendar Month shall be paid in accordance with the monthly

expenses for working meals and other miscellaneous expenses; those CUCBM Personnel who have worked for less than

the full Calendar Month shall be paid in accordance with the daily expenses for working meals and other miscellaneous

personal expenses.

4.1.2



Home leave and expenses for visiting family:



4.1.2.1 Any CUCBM Personnel who work in the Contract Area for the performance of the Contract and whose cumulative

working time in one(1) Calendar Year reaches six (6 ) Calendar Months may enjoy a thirty (30) day home leave with pay.

4.1.2.2 Standards of home leave expenses for CUCBM Personnel:

Two Hundred U.S. dollars (U.S. $200) for each CUCBM personnel each time whose home is in the province(s) in which

the Contract Area locates.

Three Hundred and Fifty U. S. dollars (U.S. $350) for each CUCBM Personnel each time whose home is outside the

province(s) in which the Contract Area locates.

If the work is performed, at the request of JMC, in the province outside the Contract Area, two hundred US dollars (U.S.

$200) for each CUCBM Personnel each time whose home is in the same province in which the work place is located and

three hundred fifty US dollars (U.S. $350) for each CUCBM Personnel each time whose home is outside the province in

which the work place is located.

4.1.3



Premiums for accidental personal injury and death insurance and the expenses incurred in dealing with injuries or death

of CUCBM Personnel, which shall include:

(a)



premiums for accidental personal injury and death insurance calculated in accordance with insured amount and

insurance premium rate with respect to CUCBM Personnel in each category; and



(b)



expenses actually incurred in dealing with injuries or death in the event that accidental injuries to or death of

CUCBM Personnel occur.



4.1.4



Administrative expenses for CUCBM Personnel and expenses for CUCBM personnel on business trips.



4.1.5



Lodging expenses for CUCBM Personnel working for the purpose of performance of the CBM Operations during the

period when they are not local residents there.



4.2



In the event that commodity prices or transportation fees increase, the

28



standards of expenses referred to in Article 4.1.1 herein shall be adjusted equitably through consultation by the Parties.

Article 5

Settlement of Personnel Costs

5.1



Salaries and wages of personnel stipulated in Article 3 hereof and the expenses stipulated in Articles 4.1.1, 4.1.2 and 4.1.3

hereof shall all be settled by the Operator with CUCBM. Those payments shall all be settled and paid by the Operator

within fifteen (15 ) days from the last working day of every month. If the Operator has provided CUCBM Personnel with

working meals and transportation, no expenses specified in Article 4.1.1 hereof shall be paid to CUCBM.



5.2



The expenses referred to in Article 4.1.4 and Article 4.1.5 hereof shall be provided by the Operator or reimbursed based

on receipts, bills or vouchers.

29



Table of Salary and Wage Standards of CUCBM Personnel



Category



Ordinal

No.



JMC



1

2



Employee



1

2

3

4

5



Personnel



Level One



Representative of JMC appointed by

CUCBM

Professional Representative (Including

Secretary)

Senior Technical Personnel

Middle Level Technical Personnel

Ordinary Technical Personnel

Ordinary Administrative Personnel

Technical Worker and Automobile Driver



(Note: the above standards shall be increased by 6 % from January 1st every year.

30



Monthly Salary and Wage

Standard (USD)

Level Two

Level Three



2,500



3,500



4,500



2,000

2,000

1,500

1,000

800

700



2,600

2,600

2,000

1,200

1,000

800



3,500

3,500

2,300

1,400

1,200

1,000



Annex IV

Data Control

Table of Contents

Article



Description



1



General Provisions



2



Ownership of the Data



3



Control and Use of the Data



4



Scope of the Data Provided for CUCBM

1



Annex IV

Data Control

Article 1

General Provision

This Annex IV is an integral part of the Contract. The definitions set forth in Article 1 of the Contract are equally applicable to this

Annex. If the provisions in this Annex are in conflict with those in the Contract, the provisions in the Contract shall prevail.

Article 2

Ownership of the Data

2.1 The ownership of all of the data, records, vouchers and other original data obtained and/or acquired by the Contractor in the

implementation of the Contract shall vest in CUCBM.

2.2 The ownership and right of use of cores, rock samples and other samples obtained and/or acquired by the Contractor from the

Contract Area shall vest in CUCBM.

2.3 Within the validity period of the Contract, after the termination of the Contract and after the contractor assigns its rights and

obligations, no data, information and samples mentioned in Articles 2.1 and 2. 2 hereof shall be disclosed in any way to a

Third Party except as stipulated in Articles 3.4 and 3.5 hereof or be transferred, donated, exchanged, sold, or published in any

form without the permission in writing of CUCBM.

Article 3

Control and Use of the Data

3.1 The management and use of data shall be governed by the principles of the Regulations on the Management of Geological

Data of the People’ Republic of China

During the implementation of the CBM Operations, the Contractor shall be responsible to keep in good order, all the data,

information and samples stipulated in Articles 2.1 and 2.2 hereof within the territory of the People’s Republic of China and

shall furnish CUCBM in a timely manner with such data, information and samples for use and turn them over to CUCBM in a

step-by-step or phase-by-phase manner.

If the Contractor terminates the Contract, the catalog and the materials of the data, information and samples stipulated in

Articles 2.1 and 2.2 hereof shall be all handed over to CUCBM within 30 days prior to the termination of the Contract.

2



3.2 The Contractor shall have the right to use or duplicate the data and information mentioned in Article 2.1 hereof and use

samples referred to in Article 2.2 hereof within and outside China and the results of research, interpretation, analysis and

chemical examination shall be submitted or reported to CUCBM in a timely manner. The Contractor shall not use the abovementioned data, information and samples for purposes other than those related to the implementation of the Contract.

3.3 Any shipment abroad for use of the original data and information (such as original magnetic tapes, original recordings, etc.)

referred to in Article 2.1 hereof and of the samples referred to in Article 2.2 hereof shall be subject to the consent in writing of

CUCBM. Unless otherwise agreed by CUCBM, the size of any piece of core or amount of any batch of rock cuttings and

samples to be shipped abroad shall not be greater than one half (1/2) of the total size or amount of the original piece or batch.

The original data and information shipped abroad shall, upon completion of the use or duplication thereof, be shipped in a

timely manner back to and be kept in China.

3.4 If, for the purpose of implementation of the Contract, the Contractor need to provide the data and information for such Third

Parties as banks or other credit institutions, Subcontractors and potential assignees to which the rights and interests under the

Contract are assigned, the type and scope of the data and information to be provided shall be subject to review by CUCBM

and the Contractor shall obtain from such Third Parties a written undertaking that they shall have the obligation to keep the

provided data and information confidential.

3.5 The Contractor may provide such data and information as may be requested by their parent corporations or Affiliates relating

to the implementation of the Contract or by securities and exchange organizations or the governments of the Contractor’s

home countries, subject to the prior reporting thereof to CUCBM. The Contractor shall inform the aforesaid parent

corporations or Affiliates which receive the data and information that they shall be obligated to keep such data and

information confidential and shall request the security and exchange organizations or the governments of their home countries

to keep such data and information confidential subject to international practice.

3.6 Release of the data and information to the press shall be subject to the consultation and agreement between the Parties.

Article 4

Scope of the Data Provided for CUCBM

In carrying out the CBM Operations, the Contractor shall provide CUCBM with data and information with two (2) copies for each,

including, but not limited to the following:

3



4.1



Overall programs and plans of operations and information and documents of designs of an individual project:



4.1.1



Overall and phased exploration program of the Contract Area;



4.1.2



Annual operational plans for exploration;



4.1.3



Early development programs, Overall Development Programs and adjusted development programs of CBM Fields;



4.1.4



Annual and separate operational designs of geophysical survey;



4.1.5



Designs for single well drilling and for single well production testing of exploratory wells;



4.1.6



Plans for production and production testing of wells and CBM Fields;



4.1.7



The content and general schedules of engineering project;



4.1.8



Basic designs of engineering projects (e.g. CBM and water treatment facilities, modules and pipelines);



4.1.9



Annual and monthly operational progress charts for engineering projects;



4.1.10 Procurement plans and schedules for engineering projects;

4.1.11 Test-run and commissioning schedules for engineering projects.

4.2



Information and documents on the progress of all operations:



4.2.1



Daily (weekly), monthly and annual reports on geophysical survey;



4.2.2



Daily, monthly and annual reports on well drilling and production testing;



4.2.3



Daily, monthly and annual reports on production testing and production of wells and CBM Fields;



4.2.4



Monthly and annual reports on operational progress of engineering projects;



4.2.5



Other operational progress reports;



4.2.6



Operational rules and unpatented technical manuals of CBM operations.



4.3



Original data and information of CBM Operations:



4.3.1



Original magnetic tapes, original records, data, seismic sections, drawings and other relevant data and information of

geophysical surveys;

4



4.3.2



Original records, data, drawings and other relevant data and information of geochemical survey;



4.3.3



Original records, data, drawings, samples and other relevant information of geophysical work, well drilling, mud, mud

logging, wireline logging, well testing, cementing, fracturing, well completion, dewatering and production and workover

operations;



4.3.4



Original records, data, drawings and other relevant information of production testing, production, injection and stimulation

of wells and CBM Fields;



4.3.5



Original records, data and automatic recording cards of CBM metering;



4.3.6



Original data and recording cards of CBM transportation, storage and marketing;



4.3.7



All the samples (including cores, cuttings, CBM, Liquid Hydrocarbons, and water samples and mud samples) and results

of analysis and chemical examination thereon;



4.3.8



Data on physical properties of pay zones;



4.3.9



Data on environment, hydrology and meteorology.



4.3.10 All original data provided for in this Article 4.3 shall be kept and stored under conditions guaranteed to preserve the data

and data quality, all of which data shall be made available to Contractor when requested.

4.4



Basic information of engineering projects:



4.4.1



Instructions on design calculations and detailed design drawings of engineering projects;



4.4.2



Technical specifications and standards of design, manufacture and installation, safety rules, environmental protection rules

and operational rules;



4.4.3



Construction records of individual projects and order slips on design and construction alterations;



4.4.4



Project commissioning drawings and manuals and original records or reports on project acceptance.



4.5



Summary reports on operational results and reports on specialized research and comprehensive study of each CBM

Operation:



4.5.1



Reports on locations of geophysical survey, geochemical survey, well drilling and other operations;



4.5.2



Operational reports on data processing and interpretation of geophysical and geochemical survey;

5



4.5.3 Summary reports on drilling geology;

4.5.4 Summary reports on production testing;

4.5.5 Reports on physical properties study of CBM reservoirs and reports on reservoir simulations and analyses;

4.5.6 Summary reports on geological structure drilling, reserves calculations of CBM and reports on feasibility study on CBM

Field geology, development, engineering and economic evaluations;

4.5.7 Reports on specialized and comprehensive studies on problems arising in the course of CBM Field exploration and

development;

4.5.8 Reports on experiment and research for engineering designs.

4.6



Data and information on economic and planning:



4.6.1 General budgets for basic development plans of CBM Field and calculation basis thereon;

4.6.2 Data on production of CBM, output value and productivity of CBM Field;

4.6.3 Geophysics survey, well drilling work and budgets of CBM Field, as well as economic, technical and energy consumption

data and information;

4.6.4 Data on production, marketing, distribution and transportation of production from CBM Field;

4.6.5 Information on investment and financing and accounting for engineering projects;

4.6.6 Other financial data specified in the Accounting Procedure of the Contract.

6